Prosecution Insights
Last updated: October 27, 2026
Application No. 17/514,992

APPARATUS AND METHOD OF BEAM FAILURE RECOVERY FOR SECONDARY CELL

Non-Final OA §103
Filed
Oct 29, 2021
Priority
Jul 12, 2019 — provisional 62/873,523 +1 more
Examiner
LYTLE JR., BRADLEY D
Art Unit
2473
Tech Center
2400 — Computer Networks
Assignee
Guangdong OPPO Mobile Telecommunications Corp., Ltd.
OA Round
8 (Non-Final)
80%
Grant Probability
Favorable
8-9
OA Rounds
0m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 80% — above average
80%
Career Allowance Rate
45 granted / 56 resolved
+22.4% vs TC avg
Strong +21% interview lift
Without
With
+20.8%
Interview Lift
resolved cases with interview
Typical timeline
3y 1m
Avg Prosecution
30 currently pending
Career history
101
Total Applications
across all art units

Statute-Specific Performance

§101
1.4%
-38.6% vs TC avg
§103
68.7%
+28.7% vs TC avg
§102
25.4%
-14.6% vs TC avg
§112
4.2%
-35.8% vs TC avg
Black line = Tech Center average estimate • Based on career data from 56 resolved cases

Office Action

§103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Continued Examination Under 37 CFR 1.114 A request for continued examination under 37 CFR 1.114, including the fee set forth in 37 CFR 1.17(e), was filed in this application after final rejection. Since this application is eligible for continued examination under 37 CFR 1.114, and the fee set forth in 37 CFR 1.17(e) has been timely paid, the finality of the previous Office action has been withdrawn pursuant to 37 CFR 1.114. Applicant's submission filed on 08/10/2026 has been entered. Response to Amendment The amendment filed 07/07/2026 has been entered. Claims 1, 8, and 15 are amended. Response to Arguments Applicant’s arguments with respect to claims 1, 8, and 15 have been considered but are moot because the new ground of rejection does not rely on any reference applied in the prior rejection of record for any teaching or matter specifically challenged in the argument. Guo et al. (US 2020/0029282), hereinafter Guo is newly discovered and teaches the newly added features of the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells: “One or more of the following information elements can be included in that higher layer message (for example a MAC-CE message): the ID of the SCell (secondary serving cell ID) where the beam failure is declared; the ID of the bandwidth part (BWP) in which beam failure is declared; the ID(s) of control resource set whose beam is failed” (Guo ¶ 0397), and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks: “The UE can report which one(s) of those control resource sets have failed beam; and the information of one new beam that is identified by the UE. This information can be the ID of one RS (for example, one CSI-RS resource or one SS/PBCH block index)” (Guo ¶ 0397), wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1: “In one embodiment, an example of the MAC-CE message is shown in FIG. 12C. In the MAC-CE message, the UE can report the beam failure of one or more SCell by indicating the value of bits for each SCell. In the example of FIG. 12C, 7 bits are reported for 7 SCell and each bit is used to represent one SCell. The value of each bit of ID.sub.1˜ID.sub.7 can represent whether beam failure happens in the corresponding SCell. In one example, the value of one bit=1 can indicate that the corresponding SCell has beam failure” (Guo ¶ 0403). Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claims 1, 8, and 15 are rejected under 35 U.S.C. 103 as being unpatentable over Agiwal et al (US 2021/0068162), hereinafter Agiwal, Svedman et al. (US 2022/0109547), hereinafter Svedman, Chin et al. (US 2020/0314883), hereinafter Chin, and Guo et al. (US 2020/0029282), hereinafter Guo. Regarding Claim 1, Agiwal teaches: A method of a beam failure recovery for a secondary cell (SCell) for a user equipment (UE): “a method by a terminal [UE] for beam failure recovery is provided . . . second configuration information on a secondary cell (SCell) from a base station, detecting beam failure on the SCell . . . a PRACH occasion configured for beam failure recovery request transmission on the SCell based on the second configuration information” (Agiwal ¶ 0023), and receiving a physical downlink control channel (PDCCH), wherein the PDCCH carries a beam failure recovery response (BFRR) in response to the BFRQ from the base station: “UE monitors the PDCCH of the SCell identified by the Cell-Radio Network Temporary Identifier (C-RNTI) while bfr-ResponseWindow is running at operation 141” (Agiwal ¶ 0083 and Fig 1). One can see in Fig. 1 at stage 132 that the UE receives a BFRR from the gNB or base station. PNG media_image1.png 736 607 media_image1.png Greyscale Agiwal Fig 1 Agiwal fails to teach: receiving a radio resource control (RRC) signaling from a base station, wherein the RRC signaling carries a first higher layer parameter, the first higher layer parameter being beamFailureRecoveryEnable configured to the BWP in the first Scell, wherein a value of the beamFailureRecoveryEnable is configured to be enable or disable to indicate the UE to perform or not perform a beam failure recovery, when being configured to be enable, the value of the beamFailureRecoveryEnable indicates the UE to perform a beam failure recovery on a bandwidth part (BWP) in a first SCell of a plurality of SCells; receiving a second higher layer parameter from the base station, wherein the second higher layer parameter is carried in an RRC signaling, wherein the second higher layer parameter is SCellBFRSchedulingRequestResourceConfig, indicating UE to send a PUSCH transmission carrying a MAC CE message that reports a beam failure in the BWP in the first SCell; and transmitting, to the base station, a beam failure recovery request (BFRQ) through a MAC CE message carried in a granted PUSCH transmission to report a beam failure in the BWP in the first SCell; wherein the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells, and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks, wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1. Regarding Claim 1, Svedman teaches: receiving a radio resource control (RRC) signaling from a base station, wherein the RRC signaling carries a first higher layer parameter, the first higher layer parameter being beamFailureRecoveryEnable configured to the BWP in the first Scell, wherein a value of the beamFailureRecoveryEnable is configured to be enable or disable to indicate the UE to perform or not perform a beam failure recovery, when being configured to be enable, the value of the beamFailureRecoveryEnable indicates the UE to perform a beam failure recovery on a bandwidth part (BWP) in a first SCell of a plurality of SCells: “Step S404. In this step a query is made regarding whether a UE received an RRC configuration of a set of BFD-enabled cells from the network. In some cases, a cell may be configured with BFD enabled and/or disabled by the same reconfiguration message by which the cell is added to the set of configured cells, e.g. a BFD enabling and/or disabling configuration is included in the configuration of an added cell. In some cases, an already configured, e.g. already added, cell may be configured with BFD-enabled and/or -disabled after the cell has been added to the set of configured cells, e.g. a BFD enabling and/or disabling configuration is included in the configuration of a modified cell. If the response is affirmative, the process proceeds to step S405, and if negative the process proceeds to the query at step S406. Step S405. If the UE received a configuration updating a set of BFD-enabled and/or -disabled cells, the UE updates the set. In various embodiments, such a set is not explicitly maintained in the UE. Instead, a BFD configuration for each configured cell and/or for configured BWPs of configured cells is maintained” (Svedman ¶ 0337-0338). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal and Svedman for the purpose of improving communication by allowing a UE to ensure its capability is not exceeded: “In some embodiments, processing circuitry at the UE applies a selection rule or procedure to reduce the BFD demands on the UE by the UE determining on which cell(s), BWP(s) and/or BFD-RS (out of the configured) it will performs BFD. Thus, a UE equipped to adapt the number of cells on which it will perform BFD, and/or the BWP and/or reference signals of the cells on which it will perform BFD so the UE capability is not exceeded.” (Svedman ¶ 0010). Svedman does not teach: receiving a second higher layer parameter from the base station, wherein the second higher layer parameter indicates the UE to send a PUSCH transmission carrying a MAC CE message that reports a beam failure in the BWP in the first SCell; transmitting, to the base station, a beam failure recovery request (BFRQ) through a MAC CE message carried in a granted PUSCH transmission to report a beam failure in the BWP in the first SCell, wherein the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells, and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks, wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1. Regarding Claim 1, Chin teaches: receiving a second higher layer parameter from the base station, wherein the second higher layer parameter is SCellBFRSchedulingRequestResourceConfig, indicating UE to send a PUSCH transmission: “the PUSCH duration of an activated CG for retransmission may be scheduled via a DG (e.g., a DCI addressed to a configured scheduling radio network temporary identifier (CS-RNTI) and the NDI is not toggled compared to a value of the previous transmission that uses the same HARQ process indicated in the DCI) or configured via radio resource control (RRC) signaling (e.g., an information element (IE) that enables repetition of PUSCH duration(s) of an activated CG, if configured and with a value greater than 1)” (Chin ¶ 0050) carrying a MAC CE message that reports a beam failure in the BWP in the first SCell: “In one implementation, the MAC entity/HARQ entity may prioritize the PUSCH duration that can accommodate a specific type of MAC CE (e.g., if the MAC PDU to be transmitted on the PUSCH duration includes a specific type of MAC CE). The specific type of MAC CE may be preconfigured or indicated by a BS” (Chin ¶ 0081); transmitting, to the base station, a beam failure recovery request (BFRQ) through a MAC CE message carried in a granted PUSCH transmission to report a beam failure in the BWP in the first SCell: “In one implementation, the specific type of MAC CE may be a BSR MAC CE. In one implementation, the specific type of MAC CE may be a Beam Failure Recovery Request (BFRQ) MAC CE, which may be an UL MAC CE transmitted from the UE to the BS for indicating beam failure related information (of a secondary cell (SCell)). Once a (SCell) beam failure recovery procedure is triggered, the MAC entity of the UE may send the BFRQ MAC CE via a PUSCH resource to a serving BS. In one implementation, the specific MAC CE may be a MAC CE with the highest configured priority. The priority of the MAC CE may be configured by the network via an RRC message or DCI signaling” (Chin ¶ 0081). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal and Svedman with Chin for the purpose of the UE handling overlapping PUSCH durations. Chin states: “Multiple PUSCH durations allocated to the UE may overlap in the time domain. A PUSCH duration allocated by an activated CG may fully or partially overlap with another PUSCH duration allocated by a DG in the same serving cell of the UE. There is a need in the industry for an improved and efficient mechanism for the UE to handle overlapping between multiple PUSCH durations” (Chin ¶ 0005). Chin does not teach: the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells, and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks, wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1. Regarding Claim 1, Guo teaches: the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells: “One or more of the following information elements can be included in that higher layer message (for example a MAC-CE message): the ID of the SCell (secondary serving cell ID) where the beam failure is declared; the ID of the bandwidth part (BWP) in which beam failure is declared; the ID(s) of control resource set whose beam is failed” (Guo ¶ 0397), and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks: “The UE can report which one(s) of those control resource sets have failed beam; and the information of one new beam that is identified by the UE. This information can be the ID of one RS (for example, one CSI-RS resource or one SS/PBCH block index)” (Guo ¶ 0397), wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1: “In one embodiment, an example of the MAC-CE message is shown in FIG. 12C. In the MAC-CE message, the UE can report the beam failure of one or more SCell by indicating the value of bits for each SCell. In the example of FIG. 12C, 7 bits are reported for 7 SCell and each bit is used to represent one SCell. The value of each bit of ID.sub.1˜ID.sub.7 can represent whether beam failure happens in the corresponding SCell. In one example, the value of one bit=1 can indicate that the corresponding SCell has beam failure” (Guo ¶ 0403). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, and Chin with Guo for the purpose of the UE monitoring specific Tx beams and reporting on said beams. Guo states: “The aforementioned embodiment is useful for the gNB to configure the UE to monitor some particular Tx beam (for example, one beam used for PDCCH channel) and report the quality. Such reporting is useful for the NW to monitor some particular beams” (Guo ¶ 0215). Regarding Claim 8, Agiwal teaches: A user equipment (UE) of a beam failure recovery for a secondary cell (SCell): “a terminal [UE] for beam failure recovery is provided . . . second configuration information on a secondary cell (SCell) from a base station, detecting beam failure on the SCell . . . a PRACH occasion configured for beam failure recovery request transmission on the SCell based on the second configuration information” (Agiwal ¶ 0023), comprising: a memory; a transceiver; and a processor coupled to the memory and the transceiver, wherein the processor is configured to: “the terminal includes a transceiver 2410, a controller 2420 and a memory 2430. The transceiver 2410, the controller 2420 and the memory 2430 are configured to perform the operations of the UE” (Agiwal ¶ 0253); and receive a physical downlink control channel (PDCCH), wherein the PDCCH carries a beam failure recovery response (BFRR) in response to the BFRQ from the base station: “UE monitors the PDCCH of the SCell identified by the Cell-Radio Network Temporary Identifier (C-RNTI) while bfr-ResponseWindow is running at operation 141” (Agiwal ¶ 0083 and Fig 1). One can see in Fig. 1 at stage 132 that the UE receives a BFRR from the gNB or base station. Agiwal fails to teach: receive a radio resource control (RRC) signaling from a base station, wherein the RRC signaling carries a first higher layer parameter, the first higher layer parameter being beamFailureRecoveryEnable configured to the BWP in the first Scell, wherein a value of the beamFailureRecoveryEnable is configured to be enable or disable to indicate the UE to perform or not perform a beam failure recovery, when being configured to be enable, the value of the beamFailureRecoveryEnable indicates the UE to perform a beam failure recovery on a bandwidth part (BWP) in a first SCell of a plurality of SCells; receive a second higher layer parameter from the base station, wherein the second higher layer parameter is carried in an RRC signaling, wherein the second higher layer parameter is SCellBFRSchedulingRequestResourceConfig, indicating UE to send a PUSCH transmission carrying a MAC CE message that reports a beam failure in the BWP in the first SCell; and transmit, to the base station, a beam failure recovery request (BFRQ) through a MAC CE message carried in a granted PUSCH transmission to report a beam failure in the BWP in the first SCell; wherein the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells, and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks, wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1. Regarding Claim 8, Svedman teaches: receive a radio resource control (RRC) signaling from a base station, wherein the RRC signaling carries a first higher layer parameter, the first higher layer parameter being beamFailureRecoveryEnable configured to the BWP in the first Scell, wherein a value of the beamFailureRecoveryEnable is configured to be enable or disable to indicate the UE to perform or not perform a beam failure recovery, when being configured to be enable, the value of the beamFailureRecoveryEnable indicates the UE to perform a beam failure recovery on a bandwidth part (BWP) in a first SCell of a plurality of SCells: “Step S404. In this step a query is made regarding whether a UE received an RRC configuration of a set of BFD-enabled cells from the network. In some cases, a cell may be configured with BFD enabled and/or disabled by the same reconfiguration message by which the cell is added to the set of configured cells, e.g. a BFD enabling and/or disabling configuration is included in the configuration of an added cell. In some cases, an already configured, e.g. already added, cell may be configured with BFD-enabled and/or -disabled after the cell has been added to the set of configured cells, e.g. a BFD enabling and/or disabling configuration is included in the configuration of a modified cell. If the response is affirmative, the process proceeds to step S405, and if negative the process proceeds to the query at step S406. Step S405. If the UE received a configuration updating a set of BFD-enabled and/or -disabled cells, the UE updates the set. In various embodiments, such a set is not explicitly maintained in the UE. Instead, a BFD configuration for each configured cell and/or for configured BWPs of configured cells is maintained” (Svedman ¶ 0337-0338). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal and Svedman for the purpose of improving communication by allowing a UE to ensure its capability is not exceeded: “In some embodiments, processing circuitry at the UE applies a selection rule or procedure to reduce the BFD demands on the UE by the UE determining on which cell(s), BWP(s) and/or BFD-RS (out of the configured) it will performs BFD. Thus, a UE equipped to adapt the number of cells on which it will perform BFD, and/or the BWP and/or reference signals of the cells on which it will perform BFD so the UE capability is not exceeded.” (Svedman ¶ 0010). Regarding Claim 8, Svedman fails to teach: receive a second higher layer parameter from the base station, wherein the second higher layer parameter is carried in an RRC signaling, wherein the second higher layer parameter is SCellBFRSchedulingRequestResourceConfig, indicating UE to send a PUSCH transmission carrying a MAC CE message that reports a beam failure in the BWP in the first SCell; wherein the transceiver is configured to: transmit, to the base station, a beam failure recovery request (BFRQ) through a MAC CE message carried in a granted PUSCH transmission to report a beam failure in the BWP in the first SCell; wherein the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells, and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks, wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1. Regarding Claim 8, Chin teaches: receive a second higher layer parameter from the base station, wherein the second higher layer parameter is carried in an RRC signaling, wherein the second higher layer parameter is SCellBFRSchedulingRequestResourceConfig, indicating UE to send a PUSCH transmission: “the PUSCH duration of an activated CG for retransmission may be scheduled via a DG (e.g., a DCI addressed to a configured scheduling radio network temporary identifier (CS-RNTI) and the NDI is not toggled compared to a value of the previous transmission that uses the same HARQ process indicated in the DCI) or configured via radio resource control (RRC) signaling (e.g., an information element (IE) that enables repetition of PUSCH duration(s) of an activated CG, if configured and with a value greater than 1)” (Chin ¶ 0050) carrying a MAC CE message that reports a beam failure in the BWP in the first SCell: “In one implementation, the MAC entity/HARQ entity may prioritize the PUSCH duration that can accommodate a specific type of MAC CE (e.g., if the MAC PDU to be transmitted on the PUSCH duration includes a specific type of MAC CE). The specific type of MAC CE may be preconfigured or indicated by a BS” (Chin ¶ 0081); wherein the transceiver is configured to: transmit, to the base station, a beam failure recovery request (BFRQ) through a MAC CE message carried in a granted PUSCH transmission to report a beam failure in the BWP in the first SCell: “In one implementation, the specific type of MAC CE may be a BSR MAC CE. In one implementation, the specific type of MAC CE may be a Beam Failure Recovery Request (BFRQ) MAC CE, which may be an UL MAC CE transmitted from the UE to the BS for indicating beam failure related information (of a secondary cell (SCell)). Once a (SCell) beam failure recovery procedure is triggered, the MAC entity of the UE may send the BFRQ MAC CE via a PUSCH resource to a serving BS. In one implementation, the specific MAC CE may be a MAC CE with the highest configured priority. The priority of the MAC CE may be configured by the network via an RRC message or DCI signaling” (Chin ¶ 0081). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal and Svedman with Chin for the purpose of the UE handling overlapping PUSCH durations. Chin states: “Multiple PUSCH durations allocated to the UE may overlap in the time domain. A PUSCH duration allocated by an activated CG may fully or partially overlap with another PUSCH duration allocated by a DG in the same serving cell of the UE. There is a need in the industry for an improved and efficient mechanism for the UE to handle overlapping between multiple PUSCH durations” (Chin ¶ 0005). Chin does not teach: the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells, and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks, wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1. Regarding Claim 8, Guo teaches: the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells: “One or more of the following information elements can be included in that higher layer message (for example a MAC-CE message): the ID of the SCell (secondary serving cell ID) where the beam failure is declared; the ID of the bandwidth part (BWP) in which beam failure is declared; the ID(s) of control resource set whose beam is failed” (Guo ¶ 0397), and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks: “The UE can report which one(s) of those control resource sets have failed beam; and the information of one new beam that is identified by the UE. This information can be the ID of one RS (for example, one CSI-RS resource or one SS/PBCH block index)” (Guo ¶ 0397), wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1: “In one embodiment, an example of the MAC-CE message is shown in FIG. 12C. In the MAC-CE message, the UE can report the beam failure of one or more SCell by indicating the value of bits for each SCell. In the example of FIG. 12C, 7 bits are reported for 7 SCell and each bit is used to represent one SCell. The value of each bit of ID.sub.1˜ID.sub.7 can represent whether beam failure happens in the corresponding SCell. In one example, the value of one bit=1 can indicate that the corresponding SCell has beam failure” (Guo ¶ 0403). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, and Chin with Guo for the purpose of the UE monitoring specific Tx beams and reporting on said beams. Guo states: “The aforementioned embodiment is useful for the gNB to configure the UE to monitor some particular Tx beam (for example, one beam used for PDCCH channel) and report the quality. Such reporting is useful for the NW to monitor some particular beams” (Guo ¶ 0215). Regarding Claim 15, Agiwal teaches: A base station of a beam failure recovery for a secondary cell (SCell), comprising: a memory; a transceiver; and a processor coupled to the memory and the transceiver: “a base station includes a transceiver 2510, a controller 2520 and a memory 2530. The transceiver 2510, the controller 2520 and the memory 2530 are configured to perform the operations of the network” (Agiwal ¶ 0261), wherein the processor is configured to; transmit, to the UE, a physical downlink control channel (PDCCH), wherein the PDCCH carries a beam failure recovery response (BFRR) in response to the BFRQ: “UE monitors the PDCCH of the SCell identified by the Cell-Radio Network Temporary Identifier (C-RNTI) while bfr-ResponseWindow is running at operation 141” (Agiwal ¶ 0083 and Fig 1). One can see in Fig. 1 at stage 132 that the UE receives a BFRR from the gNB or base station. Agiwal fails to teach: transmit a radio resource control (RRC) signaling to a user equipment (UE), wherein the RRC signaling carries a first higher layer parameter, the first higher layer parameter being beamFailureRecoveryEnable configured to the BWP in the first SCell, wherein a value of the beamFailureRecoveryEnable being enable indicates the UE to perform a beam failure recovery on a bandwidth part (BWP) in a first SCell of a plurality of SCells; and transmit a second higher layer parameter from the base station, wherein the second higher layer parameter is carried in an RRC signaling, wherein the second higher layer parameter is SCellBFRSchedulingRequestResourceConfig, indicating UE to send a PUSCH transmission carrying a MAC CE message that reports a beam failure in the BWP in the first SCell; wherein the transceiver is configured to: receive a beam failure recovery request (BFRQ) for reporting a beam failure in the BWP in the first SCell through a MAC CE message carried in a granted PUSCH transmission transmitted from the UE; wherein the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells, and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks, wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1. Regarding Claim 15, Svedman teaches: transmit a radio resource control (RRC) signaling to a user equipment (UE), wherein the RRC signaling carries a first higher layer parameter, the first higher layer parameter being beamFailureRecoveryEnable configured to the BWP in the first Scell, wherein a value of the beamFailureRecoveryEnable is configured to be enable or disable to indicate the UE to perform or not perform a beam failure recovery, when being configured to be enable, the value of the beamFailureRecoveryEnable indicates the UE to perform a beam failure recovery on a bandwidth part (BWP) in a first SCell of a plurality of SCells: “Step S404. In this step a query is made regarding whether a UE received an RRC configuration of a set of BFD-enabled cells from the network. In some cases, a cell may be configured with BFD enabled and/or disabled by the same reconfiguration message by which the cell is added to the set of configured cells, e.g. a BFD enabling and/or disabling configuration is included in the configuration of an added cell. In some cases, an already configured, e.g. already added, cell may be configured with BFD-enabled and/or -disabled after the cell has been added to the set of configured cells, e.g. a BFD enabling and/or disabling configuration is included in the configuration of a modified cell. If the response is affirmative, the process proceeds to step S405, and if negative the process proceeds to the query at step S406. Step S405. If the UE received a configuration updating a set of BFD-enabled and/or -disabled cells, the UE updates the set. In various embodiments, such a set is not explicitly maintained in the UE. Instead, a BFD configuration for each configured cell and/or for configured BWPs of configured cells is maintained” (Svedman ¶ 0337-0338). Svedman fails to teach: transmit a second higher layer parameter to the UE, wherein the second higher layer parameter is SCellBFRSchedulingRequestResourceConfig, indicating the UE to send a PUSCH transmission carrying a MAC CE message that reports a beam failure in the BWP in the first SCell; wherein the transceiver is configured to: receive a beam failure recovery request (BFRQ) for reporting a beam failure in the BWP in the first SCell through a MAC CE message carried in a granted PUSCH transmission transmitted from the UE; wherein the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells, and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks, wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1. Regarding Claim 15, Chin teaches: transmit a second higher layer parameter to the UE, wherein the second higher layer parameter is SCellBFRSchedulingRequestResourceConfig, indicating the UE to send a PUSCH transmission: “the PUSCH duration of an activated CG for retransmission may be scheduled via a DG (e.g., a DCI addressed to a configured scheduling radio network temporary identifier (CS-RNTI) and the NDI is not toggled compared to a value of the previous transmission that uses the same HARQ process indicated in the DCI) or configured via radio resource control (RRC) signaling (e.g., an information element (IE) that enables repetition of PUSCH duration(s) of an activated CG, if configured and with a value greater than 1)” (Chin ¶ 0050) carrying a MAC CE message that reports a beam failure in the BWP in the first SCell: “In one implementation, the MAC entity/HARQ entity may prioritize the PUSCH duration that can accommodate a specific type of MAC CE (e.g., if the MAC PDU to be transmitted on the PUSCH duration includes a specific type of MAC CE). The specific type of MAC CE may be preconfigured or indicated by a BS” (Chin ¶ 0081); wherein the transceiver is configured to: transmit, to the base station, a beam failure recovery request (BFRQ) through a MAC CE message carried in a granted PUSCH transmission to report a beam failure in the BWP in the first SCell: “In one implementation, the specific type of MAC CE may be a BSR MAC CE. In one implementation, the specific type of MAC CE may be a Beam Failure Recovery Request (BFRQ) MAC CE, which may be an UL MAC CE transmitted from the UE to the BS for indicating beam failure related information (of a secondary cell (SCell)). Once a (SCell) beam failure recovery procedure is triggered, the MAC entity of the UE may send the BFRQ MAC CE via a PUSCH resource to a serving BS. In one implementation, the specific MAC CE may be a MAC CE with the highest configured priority. The priority of the MAC CE may be configured by the network via an RRC message or DCI signaling” (Chin ¶ 0081). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal and Svedman with Chin for the purpose of the UE handling overlapping PUSCH durations. Chin states: “Multiple PUSCH durations allocated to the UE may overlap in the time domain. A PUSCH duration allocated by an activated CG may fully or partially overlap with another PUSCH duration allocated by a DG in the same serving cell of the UE. There is a need in the industry for an improved and efficient mechanism for the UE to handle overlapping between multiple PUSCH durations” (Chin ¶ 0005). Chin does not teach: the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells, and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks, wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1. Regarding Claim 1, Guo teaches: the MAC CE message comprises a plurality of bits indicating beam failure status of a plurality of SCells: “One or more of the following information elements can be included in that higher layer message (for example a MAC-CE message): the ID of the SCell (secondary serving cell ID) where the beam failure is declared; the ID of the bandwidth part (BWP) in which beam failure is declared; the ID(s) of control resource set whose beam is failed” (Guo ¶ 0397), and a plurality of indicators of new beam reference signals (RSs) providing a plurality of channel state information reference signal (CSI-RS) resources or synchronization signal/physical broadcast channel (SS/PBCH) blocks: “The UE can report which one(s) of those control resource sets have failed beam; and the information of one new beam that is identified by the UE. This information can be the ID of one RS (for example, one CSI-RS resource or one SS/PBCH block index)” (Guo ¶ 0397), wherein each of the plurality of the indicators of new beam RSs is configured to correspond to one of the plurality of bits that is set to be 1: “In one embodiment, an example of the MAC-CE message is shown in FIG. 12C. In the MAC-CE message, the UE can report the beam failure of one or more SCell by indicating the value of bits for each SCell. In the example of FIG. 12C, 7 bits are reported for 7 SCell and each bit is used to represent one SCell. The value of each bit of ID.sub.1˜ID.sub.7 can represent whether beam failure happens in the corresponding SCell. In one example, the value of one bit=1 can indicate that the corresponding SCell has beam failure” (Guo ¶ 0403). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, and Chin with Guo for the purpose of the UE monitoring specific Tx beams and reporting on said beams. Guo states: “The aforementioned embodiment is useful for the gNB to configure the UE to monitor some particular Tx beam (for example, one beam used for PDCCH channel) and report the quality. Such reporting is useful for the NW to monitor some particular beams” (Guo ¶ 0215). Claims 3-5, 10-12, and 16-19 are rejected under 35 U.S.C. 103 as being unpatentable over Agiwal, Svedman, Chin, and Guo as applied to claims 1, 8, and 15 above, and further in view of Cirik et al. (US 2019/0306842), hereinafter Cirik. Regarding Claim 3, Agiwal, Svedman, Chin, and Guo teach: The method of Claim 1. Agiwal, Svedman, Chin, and Guo do not teach: performing, by the UE, the beam failure recovery, if the UE is configured with a new beam identification reference signal (NBI RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell. Regarding Claim 3, Cirik teaches: performing, by the UE, the beam failure recovery, if the UE is configured with a new beam identification reference signal (NBI RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell: “At step 2104, the wireless device may select a beam (e.g., a selected beam) based on detecting the at least one beam failure. The selected beam may be a beam with good channel quality (e.g., based on RSRP, SINR, and/or BLER) that may be selected from a set of candidate beams. The candidate beams may be indicated by a set of reference signals (e.g., SSBs, or CSI-RSs) [NBI RS]” (Cirik ¶ 0244 and Figure 21). PNG media_image2.png 797 582 media_image2.png Greyscale Cirik Fig. 21 It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, Chin, and Guo with Cirik for the purpose of reducing timing misalignment between the UE and the base station. Cirik states: “the wireless device may prevent and/or reduce timing misalignment between the wireless device and the base station, which may reduce latency, increase efficiency of resource usage, and/or conserve power” (Cirik ¶ 0004). Regarding Claim 4, Agiwal, Svedman, Chin, and Guo teach: The method of Claim 1. Agiwal, Svedman, Chin, and Guo do not teach: wherein performing, by the UE, the beam failure recovery comprises: reporting an index of one NBI RS that is chosen by the UE based on comparing a reference symbol received power (RSRP) of the one NBI RS to a threshold. Regarding Claim 4, Cirik teaches performing, by the UE, the beam failure recovery comprises: reporting an index of one NBI RS that is chosen by the UE based on comparing a reference symbol received power (RSRP) of the one NBI RS to a threshold: “A wireless device may (e.g., based on a RSRP measurement on CSI-RS) report a beam index, which may be indicated in a CRI for downlink beam selection and/or associated with an RSRP value of a beam” (Cirik Paragraph 0124) and “An RRC message may configure a wireless device with one or more parameters (e.g., in BeamFailureRecoveryConfig) for a beam failure detection and recovery procedure. The one or more parameters may comprise one or more of . . . an RSRP threshold (e.g., beamFailureCandidateBeamThreshold) for a beam failure recovery” (Cirik ¶ 0247). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, Chin, and Guo with Cirik for the purpose of reducing timing misalignment between the UE and the base station. Cirik states: “the wireless device may prevent and/or reduce timing misalignment between the wireless device and the base station, which may reduce latency, increase efficiency of resource usage, and/or conserve power” (Cirik ¶ 0004). Regarding Claim 5, Agiwal, Svedman, Chin, and Guo teach: The method of Claim 1. Agiwal, Svedman, Chin, and Guo do not teach: performing, by the UE, the beam failure recover, if the UE is configured with a beam failure detection reference signal (BFD RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell. Regarding Claim 5, Cirik teaches: performing, by the UE, the beam failure recover, if the UE is configured with a beam failure detection reference signal (BFD RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell: “The one or more configuration parameters may comprise at least one of one or more first reference signals of the first BWP[BFD RS], one or more second RSs of the first BWP, and/or one or more beam failure recovery request (BFRQ) resources via the first BWP” (Cirik ¶ 0297). Figure 27 below shows that receiving the configuration parameters begins the beam failure recovery process. PNG media_image3.png 826 595 media_image3.png Greyscale Cirik Fig. 27 It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, Chin, and Guo with Cirik for the purpose of reducing timing misalignment between the UE and the base station. Cirik states: “the wireless device may prevent and/or reduce timing misalignment between the wireless device and the base station, which may reduce latency, increase efficiency of resource usage, and/or conserve power” (Cirik ¶ 0004). Regarding Claim 10, Agiwal, Svedman, Chin, and Guo teach: The UE of Claim 8. Agiwal, Svedman, Chin, and Guo do not teach: wherein the processor is configured to perform the beam failure recovery if the UE is configured with a new beam identification reference signal (NBI RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell Regarding Claim 10, Cirik teaches: the processor is configured to perform the beam failure recovery if the UE is configured with a new beam identification reference signal (NBI RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell: “At step 2104, the wireless device may select a beam (e.g., a selected beam) based on detecting the at least one beam failure. The selected beam may be a beam with good channel quality (e.g., based on RSRP, SINR, and/or BLER) that may be selected from a set of candidate beams. The candidate beams may be indicated by a set of reference signals (e.g., SSBs, or CSI-RSs) [NBI RS]” (Cirik ¶ 0244 and Figure 21). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, Chin, and Guo with Cirik for the purpose of reducing timing misalignment between the UE and the base station. Cirik states: “the wireless device may prevent and/or reduce timing misalignment between the wireless device and the base station, which may reduce latency, increase efficiency of resource usage, and/or conserve power” (Cirik ¶ 0004). Regarding Claim 11, Agiwal, Svedman, Chin, and Guo teach: The UE of Claim 8. Agiwal, Svedman, Chin, and Guo do not teach: wherein the processor is configured to report an index of one NBI RS that is chosen by the processor based on comparing a reference symbol received power (RSRP) of the one NBI RS to a threshold. Regarding Claim 11, Cirik teaches: wherein the processor is configured to report an index of one NBI RS that is chosen by the processor based on comparing a reference symbol received power (RSRP) of the one NBI RS to a threshold: “A wireless device may (e.g., based on a RSRP measurement on CSI-RS) report a beam index, which may be indicated in a CRI for downlink beam selection and/or associated with an RSRP value of a beam” (Cirik Paragraph 0124) and “An RRC message may configure a wireless device with one or more parameters (e.g., in BeamFailureRecoveryConfig) for a beam failure detection and recovery procedure. The one or more parameters may comprise one or more of . . . an RSRP threshold (e.g., beamFailureCandidateBeamThreshold) for a beam failure recovery” (Cirik ¶ 0247). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, Chin, and Guo with Cirik for the purpose of reducing timing misalignment between the UE and the base station. Cirik states: “the wireless device may prevent and/or reduce timing misalignment between the wireless device and the base station, which may reduce latency, increase efficiency of resource usage, and/or conserve power” (Cirik ¶ 0004). Regarding Claim 12, Agiwal, Svedman, Chin, and Guo teach: The UE of Claim 8. Agiwal, Svedman, Chin, and Guo do not teach: the processor is configured to perform the beam failure recovery if the UE is configured with a beam failure detection reference signal (BFD RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell. Regarding Claim 12, Cirik teaches: the processor is configured to perform the beam failure recovery if the UE is configured with a beam failure detection reference signal (BFD RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell: “The one or more configuration parameters may comprise at least one of one or more first reference signals of the first BWP[BFD RS], one or more second RSs of the first BWP, and/or one or more beam failure recovery request (BFRQ) resources via the first BWP” (Cirik ¶ 0297). Figure 27 above shows that receiving the configuration parameters begins the beam failure recovery process. It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, Chin, and Guo with Cirik for the purpose of reducing timing misalignment between the UE and the base station. Cirik states: “the wireless device may prevent and/or reduce timing misalignment between the wireless device and the base station, which may reduce latency, increase efficiency of resource usage, and/or conserve power” (Cirik ¶ 0004). Regarding Claim 17, Agiwal, Svedman, Chin, and Guo teach: The base station of Claim 16. Agiwal, Svedman, Chin, and Guo do not teach: the processor is configured to configure the UE with a new beam identification reference signal (NBI RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell. Regarding Claim 17, Cirik teaches: the processor is configured to configure the UE with a new beam identification reference signal (NBI RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell: “At step 2104, the wireless device may select a beam (e.g., a selected beam) based on detecting the at least one beam failure. The selected beam may be a beam with good channel quality (e.g., based on RSRP, SINR, and/or BLER) that may be selected from a set of candidate beams. The candidate beams may be indicated by a set of reference signals (e.g., SSBs, or CSI-RSs) [NBI RS]” (Cirik ¶ 0244 and Figure 21). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, Chin, and Guo with Cirik for the purpose of reducing timing misalignment between the UE and the base station. Cirik states: “the wireless device may prevent and/or reduce timing misalignment between the wireless device and the base station, which may reduce latency, increase efficiency of resource usage, and/or conserve power” (Cirik ¶ 0004). Regarding Claim 18, Agiwal, Svedman, Chin, and Guo teach: The base station of Claim 16. Agiwal, Svedman, Chin, and Guo do not teach: the processor is configured to request the UE to report an index of one NBI RS that is chosen by the UE based on comparing a reference symbol received power (RSRP) of the one NBI RS to a threshold. Regarding Claim 18, Cirik teaches: the processor is configured to request the UE to report an index of one NBI RS that is chosen by the UE based on comparing a reference symbol received power (RSRP) of the one NBI RS to a threshold: “A wireless device may (e.g., based on a RSRP measurement on CSI-RS) report a beam index, which may be indicated in a CRI for downlink beam selection and/or associated with an RSRP value of a beam” (Cirik Paragraph 0124) and “An RRC message may configure a wireless device with one or more parameters (e.g., in BeamFailureRecoveryConfig) for a beam failure detection and recovery procedure. The one or more parameters may comprise one or more of . . . an RSRP threshold (e.g., beamFailureCandidateBeamThreshold) for a beam failure recovery” (Cirik ¶ 0247). It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, Chin, and Guo with Cirik for the purpose of reducing timing misalignment between the UE and the base station. Cirik states: “the wireless device may prevent and/or reduce timing misalignment between the wireless device and the base station, which may reduce latency, increase efficiency of resource usage, and/or conserve power” (Cirik ¶ 0004). Regarding Claim 19, Agiwal, Svedman, Chin, and Guo teach: The base station of Claim 16. Agiwal, Svedman, Chin, and Guo do not teach: the processor is configured to configure the UE with a beam failure detection reference signal (BFD RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell. Regarding Claim 19, Cirik teaches: the processor is configured to configure the UE with a beam failure detection reference signal (BFD RS), which indicates the UE to perform the beam failure recovery for the BWP in the first SCell: “The one or more configuration parameters may comprise at least one of one or more first reference signals of the first BWP[BFD RS], one or more second RSs of the first BWP, and/or one or more beam failure recovery request (BFRQ) resources via the first BWP” (Cirik ¶ 0297). Figure 27 above shows that receiving the configuration parameters begins the beam failure recovery process. It would have been obvious to one ordinarily skilled in the art before the effective filing date of the instant application to combine the references of Agiwal, Svedman, Chin, and Guo for the purpose of reducing timing misalignment between the UE and the base station. Cirik states: “the wireless device may prevent and/or reduce timing misalignment between the wireless device and the base station, which may reduce latency, increase efficiency of resource usage, and/or conserve power” (Cirik ¶ 0004). Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to BRADLEY DAVIS LYTLE whose telephone number is (703)756-4593. The examiner can normally be reached M-F 8:00 AM - 4:00 PM EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Kwang bin Yao can be reached at 571-272-3182. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /B.D.L./Examiner, Art Unit 2473 /BRADLEY D LYTLE JR./Examiner, Art Unit 2473 /KWANG B YAO/Supervisory Patent Examiner, Art Unit 2473
Read full office action

Prosecution Timeline

Show 16 earlier events
Oct 07, 2025
Response after Non-Final Action
Dec 10, 2025
Non-Final Rejection mailed — §103
Feb 25, 2026
Response Filed
May 15, 2026
Final Rejection mailed — §103
Jul 07, 2026
Response after Non-Final Action
Aug 10, 2026
Request for Continued Examination
Aug 17, 2026
Response after Non-Final Action
Sep 22, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12757211
RESOURCE SCHEDULING METHOD, APPARATUS, ACCESS NETWORK DEVICE, TERMINAL AND STORAGE MEDIUM
4y 0m to grant Granted Oct 06, 2026
Patent 12745294
ONBOARDING VIRTUALIZED NETWORK DEVICES TO CLOUD-BASED NETWORK ASSURANCE SYSTEM
4y 9m to grant Granted Sep 22, 2026
Patent 12720382
Additional Reference Signals for UEs in Non-Connected States
3y 5m to grant Granted Aug 25, 2026
Patent 12707288
System And Method For Dynamically Varying Retry Rates In UAV Communications
3y 4m to grant Granted Aug 11, 2026
Patent 12672132
RESOURCE BLOCKS IN UPLINK BAND OF SUBBAND FULL DUPLEX SYMBOL
2y 12m to grant Granted Jun 30, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

8-9
Expected OA Rounds
80%
Grant Probability
99%
With Interview (+20.8%)
3y 1m (~0m remaining)
Median Time to Grant
High
PTA Risk
Based on 56 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month