Prosecution Insights
Last updated: October 02, 2026
Application No. 17/932,969

INTELLIGENT BATTERY CELL SYSTEM INCLUDING SELECTIVELY DISTRIBUTING RESPONSIBILITY FOR FEEDBACK CONTROL

Non-Final OA §112
Filed
Sep 16, 2022
Priority
Sep 21, 2021 — provisional 63/246,483
Examiner
HERNANDEZ, MANUEL J
Art Unit
2859
Tech Center
2800 — Semiconductors & Electrical Systems
Assignee
Volvo Group
OA Round
3 (Non-Final)
50%
Grant Probability
Moderate
3-4
OA Rounds
0m
Est. Remaining
93%
With Interview

Examiner Intelligence

Grants 50% of resolved cases
50%
Career Allowance Rate
338 granted / 683 resolved
-18.5% vs TC avg
Strong +44% interview lift
Without
With
+43.8%
Interview Lift
resolved cases with interview
Typical timeline
3y 6m
Avg Prosecution
41 currently pending
Career history
740
Total Applications
across all art units

Statute-Specific Performance

§101
3.2%
-36.8% vs TC avg
§103
56.9%
+16.9% vs TC avg
§102
21.1%
-18.9% vs TC avg
§112
17.6%
-22.4% vs TC avg
Black line = Tech Center average estimate • Based on career data from 683 resolved cases

Office Action

§112
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Continued Examination Under 37 CFR 1.114 A request for continued examination under 37 CFR 1.114, including the fee set forth in 37 CFR 1.17(e), was filed in this application after final rejection. Since this application is eligible for continued examination under 37 CFR 1.114, and the fee set forth in 37 CFR 1.17(e) has been timely paid, the finality of the previous Office action has been withdrawn pursuant to 37 CFR 1.114. Applicant's submission filed on 3/4/2026 has been entered. Claim Status Claims 1-20 are pending. Claims 1-3, 9, and 17 are amended. Claims 4-8, 10, 12-16, 18, and 20 are previously presented. Claims 11 and 19 are original. Response to Arguments Applicant’s arguments regarding claims 1, 9, and 17 have been considered, but they are moot because no prior art rejection (e.g., under 35 U.S.C. 103) is currently applied to the pending claims. Drawings The drawings were received on 3/4/2026. These drawings are acceptable. Claim Objections Claims 1, 9, and 17 are objected to because of the following informalities: perhaps the amended recitations “each secondary node…coupled only to…converter stages and...voltage sensors...” should be changed, since the secondary nodes appear to be coupled to other components, such as, e.g., the primary node. Appropriate correction is required. Claim Rejections - 35 USC § 112 The following is a quotation of the first paragraph of 35 U.S.C. 112(a): (a) IN GENERAL.—The specification shall contain a written description of the invention, and of the manner and process of making and using it, in such full, clear, concise, and exact terms as to enable any person skilled in the art to which it pertains, or with which it is most nearly connected, to make and use the same, and shall set forth the best mode contemplated by the inventor or joint inventor of carrying out the invention. The following is a quotation of the first paragraph of pre-AIA 35 U.S.C. 112: The specification shall contain a written description of the invention, and of the manner and process of making and using it, in such full, clear, concise, and exact terms as to enable any person skilled in the art to which it pertains, or with which it is most nearly connected, to make and use the same, and shall set forth the best mode contemplated by the inventor of carrying out his invention. Claims 1-20 are rejected under 35 U.S.C. 112(a) or 35 U.S.C. 112 (pre-AIA ), first paragraph, as failing to comply with the written description requirement. The claim(s) contains subject matter which was not described in the specification in such a way as to reasonably convey to one skilled in the relevant art that the inventor or a joint inventor, or for applications subject to pre-AIA 35 U.S.C. 112, the inventor(s), at the time the application was filed, had possession of the claimed invention. Regarding claim 1, the disclosure as filed does not reasonably convey to a person of ordinary skill in the art that the inventor had possession of the claimed recitations “each secondary node being physically located within a battery pack”. While the specification mentions “a battery pack” several times, it does not disclose each secondary node within a battery pack. Regarding claim 1, the disclosure as filed does not reasonably convey to a person of ordinary skill in the art that the inventor had possession of the claimed recitations “the primary node broadcasts, over a unidirectional communication link”. The “unidirectional communication link” is not mentioned in the specification, and paragraph 0071 discloses “Feedback from the secondary nodes can be used to present information from SmartCell system 300 via primary node 306”, i.e., communications from secondary nodes to the primary node is disclosed. Regarding claim 1, the disclosure as filed does not reasonably convey to a person of ordinary skill in the art that the inventor had possession of the claimed recitations “wherein the one or more secondary nodes of each string of the group of strings independently: determines a respective modulator angle for the string based on the torque request, by executing a local control algorithm that computes a reference phase current and a corresponding switching pattern for the respective local power electronic converter stages”. While paragraph 0102 discloses “secondary nodes can receive the current modulator angle, compare it with their own modulator angle”, and paragraph 0147 discloses “secondary nodes can, depending on the requested torque, be able to calculate expected current shape. This calculation can have modulator angle, physical motor parameters and request information as input”, the specification does not appear to disclose said recitations. Claims 2-8 are dependent from claim 1 and are therefore rejected for the same reasons as independent claim 1. Regarding claim 3, the disclosure as filed does not reasonably convey to a person of ordinary skill in the art that the inventor had possession of the claimed recitations “each secondary node continues to execute its local control algorithm at a switching frequency of at least 10 kilohertz between the consecutive update events without receiving updated pulse width modulation information from the primary node”. Regarding claim 9, the disclosure as filed does not reasonably convey to a person of ordinary skill in the art that the inventor had possession of the claimed recitations “each secondary node being physically located within a battery pack”; “broadcasting, from a primary node, torque request data and motor electrical angle data to each secondary node over a unidirectional communication link”; and “wherein one or more secondary nodes of each string of the group of strings: determines a respective modulator angle for the string based on the torque request, by executing a local control algorithm that computes a reference phase current and a corresponding switching pattern for the respective local power electronic converter stages”, for reasons similar to claim 1. Claims 10-16 are dependent from claim 9 and are therefore rejected for the same reasons as independent claim 9. Regarding claim 17, the disclosure as filed does not reasonably convey to a person of ordinary skill in the art that the inventor had possession of the claimed recitations “each secondary node being physically located within a battery pack”; “broadcasting, from a primary node, torque request data and motor electrical angle data to each secondary node over a unidirectional communication link”; and “one or more secondary nodes of each string of the group of strings: determines a respective modulator angle for the string based on the torque request, by executing a local control algorithm that computes a reference phase current and a corresponding switching pattern for the respective local power electronic converter stages”, for reasons similar to claim 1. Claims 18-20 are dependent from claim 17 and are therefore rejected for the same reasons as independent claim 17. Allowable Subject Matter Claims 1-20 are allowed (subject to 112(a) rejections). The following is a statement of reasons for the indication of allowable subject matter: Regarding claim 1, the prior art teaches a smart cell modulator as described in the office action with date 12/9/2025, and primary reference SLEPCHENKOV (Pub. No.: US 2021/0316637 A1) also discloses each smart battery cell comprises a respective electrochemical energy storage element (206, Fig. 2A) and a respective local power electronic converter stage (202, Fig. 2A; ¶ 0072-0074); and each local power electronic converter stage is operable in at least three states, including a positive state, a negative state, and a bypass state that electrically bypasses the respective electrochemical energy storage element while maintaining continuity of the string (¶ 0079, 0090). The prior art fails to disclose “the primary node broadcasts, over a unidirectional communication link, torque request data and motor electrical angle data to each of the one or more secondary nodes without transmitting any pulse width modulation signals or duty cycles, wherein the one or more secondary nodes of each string of the group of strings independently: determines a respective modulator angle for the string based on the torque request, by executing a local control algorithm that computes a reference phase current and a corresponding switching pattern for the respective local power electronic converter stages”. It would not have been obvious to modify the prior art to arrive at the claimed invention. Claims 2-8 are dependent from claim 1 and are therefore allowable for the same reasons as independent claim 1. Regarding claim 9, the prior art teaches a computer-implemented method as described in the office action with date 12/9/2025, and primary reference SLEPCHENKOV (Pub. No.: US 2021/0316637 A1) also discloses for individual smart battery cells, selectively placing the respective local power electronic converter stage in a positive state, a negative state, or a bypass state that electrically bypasses the respective electrochemical energy storage element while maintaining continuity of the string (¶ 0079, 0090). The prior art fails to disclose “the engaging comprises broadcasting, from a primary node, torque request data and motor electrical angle data to each secondary node over a unidirectional communication link without broadcasting any pulse width modulation patterns, and wherein one or more secondary nodes of each string of the group of strings: determines a respective modulator angle for the string based on the torque request, by executing a local control algorithm that computes a reference phase current and a corresponding switching pattern for the respective local power electronic converter stages”. It would not have been obvious to modify the prior art to arrive at the claimed invention. Claims 10-16 are dependent from claim 9 and are therefore allowable for the same reasons as independent claim 9. Regarding claim 17, the prior art teaches a computer program product as described in the office action with date 12/9/2025, and primary reference SLEPCHENKOV (Pub. No.: US 2021/0316637 A1) also discloses for individual smart battery cells, selectively placing the respective local power electronic converter stage in a positive state, a negative state, or a bypass state that electrically bypasses the respective electrochemical energy storage element while maintaining continuity of the string (¶ 0079, 0090). The prior art fails to disclose “the engaging comprises broadcasting, from a primary node, torque request data and motor electrical angle data to each secondary node over a unidirectional communication link without broadcasting any pulse width modulation patterns, and wherein one or more secondary nodes of each string of the group of strings: determines a respective modulator angle for the string based on the torque request, by executing a local control algorithm that computes a reference phase current and a corresponding switching pattern for the respective local power electronic converter stages”. It would not have been obvious to modify the prior art to arrive at the claimed invention. Claims 18-20 are dependent from claim 17 and are therefore allowable for the same reasons as independent claim 17. Furthermore, none of the prior art of record, taken alone or in combination, teaches or suggests these claim features. Conclusion The prior art made of record on form PTO-892 and not relied upon is considered pertinent to applicant's disclosure. Any inquiry concerning this communication or earlier communications from the examiner should be directed to MANUEL HERNANDEZ whose telephone number is (571)270-7916. The examiner can normally be reached Monday-Friday 9a-5p ET. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Drew Dunn can be reached at (571) 272-2312. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /Manuel Hernandez/Examiner, Art Unit 2859 9/21/2026 /DREW A DUNN/Supervisory Patent Examiner, Art Unit 2859
Read full office action

Prosecution Timeline

Show 5 earlier events
Aug 20, 2025
Examiner Interview Summary
Aug 25, 2025
Response Filed
Dec 09, 2025
Final Rejection mailed — §112
Jan 28, 2026
Interview Requested
Mar 04, 2026
Response after Non-Final Action
Apr 10, 2026
Request for Continued Examination
Apr 20, 2026
Response after Non-Final Action
Sep 23, 2026
Non-Final Rejection mailed — §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12709180
ELECTRIC VEHICLE CHARGING STATION MANAGEMENT METHOD USING BLOCKCHAIN
4y 0m to grant Granted Aug 18, 2026
Patent 12695320
WALL OF A BUILDING
3y 9m to grant Granted Jul 28, 2026
Patent 12689226
BATTERY PROTECTIVE CIRCUIT FOR SHORT CIRCUIT DETECTION AND BATTERY PACK COMPRISING SAME
6y 0m to grant Granted Jul 21, 2026
Patent 12508935
CONTROL DEVICE, SERVER, AND STORAGE MEDIUM CONFIGURED TO FIX A MASTER VEHICLE THAT CONTROLS ELECTRIC POWER SUPPLY OF A PLURALITY OF VEHCLES BASED ON ELECTRIC POWER SUPPLY INFORMATION
3y 5m to grant Granted Dec 30, 2025
Patent 12390038
SYSTEM AND METHOD OF PROVIDING PACKING INVENTORY SENSING AND MANAGEMENT OF A SUPPLY COMPARTMENT FOR A STORAGE RECEPTACLE
1y 4m to grant Granted Aug 19, 2025
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
50%
Grant Probability
93%
With Interview (+43.8%)
3y 6m (~0m remaining)
Median Time to Grant
High
PTA Risk
Based on 683 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month