Prosecution Insights
Last updated: October 25, 2026
Application No. 18/004,637

APPARATUS AND METHOD OF TREATING SOIL

Final Rejection §103
Filed
Jan 06, 2023
Priority
Jul 09, 2020 — FI 20205742 +1 more
Examiner
ADDIE, RAYMOND W
Art Unit
3671
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Betolar OY
OA Round
3 (Final)
81%
Grant Probability
Favorable
4-5
OA Rounds
0m
Est. Remaining
90%
With Interview

Examiner Intelligence

Grants 81% — above average
81%
Career Allowance Rate
1291 granted / 1592 resolved
+29.1% vs TC avg
Moderate +9% lift
Without
With
+8.6%
Interview Lift
resolved cases with interview
Fast prosecutor
1y 12m
Avg Prosecution
33 currently pending
Career history
1632
Total Applications
across all art units

Statute-Specific Performance

§101
2.2%
-37.8% vs TC avg
§103
49.6%
+9.6% vs TC avg
§102
27.6%
-12.4% vs TC avg
§112
15.7%
-24.3% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1592 resolved cases

Office Action

§103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. Claim Rejections - 35 USC § 103 The text of those sections of Title 35, U.S. Code not included in this action can be found in a prior Office action. Claim(s) 7-13 is/are rejected under 35 U.S.C. 103 as being unpatentable over Duffy US 2014/0270953 in view of Merritt US 5,000,789. Duffy discloses a method of soil stabilization comprising: Providing a soil treating machine (P) having: cutting edge (1) and augers (2) configured to paved and/or subgrade material (A) from a surface; a transfer device (3) configured to transfer material removed by the cutting edge; a hopper (13), configured to receive the removed material (A) from the transfer device (23). A pair of reservoirs (13a) disposed on respective sides of the hopper, Fig. 1; [075]. A spray bar assembly (12, 14) configured to spray additives, such as binder, [0060] onto the removed material (A) as said material enters the hopper (13). Wherein the cutting edge, transfer device and spray bars can be mounted to a known paving machine, having a hopper, auger and paving screed. See [0076]. The method further including: Removing a uniform layer 100mm thick of pavement and/or subgrade from the ground. Spraying additive, such as binder onto the removed material (A) inside said hopper (13). Mixing the sprayed binder and removed material (A). Returning the sprayed material (A) back to the ground from where it was removed. Compacting said returned, sprayed material (A). What Duffy does not disclose is what binder is being used. However, Merritt teaches it is known to add alkali-activatable mixtures, such as sulfuric acid and citrus stripper oil to soil and achieve compressive strengths of 375-520psi/2.5-3.5MPA over an 11-28 day cure. See Col. 4, lns. 6-52. Therefore, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to provide the method of soil stabilization of Duffy with the step of adding an alkai-activatable mixture, as taught by Merritt in order to support vehicular traffic. With respect to claims 12, 13 Duffy teaches using industrial side-stream material, to be mixed into the soil/subgrade removed from the roadway. The “industrial side-stream material” being Recycled Asphalt Particles (RAP). And that an entirety of a roadway can thus be recycled and strengthened by said method. [0007-10]. Response to Arguments Applicant's arguments filed 7/09/2026 have been fully considered but they are not persuasive. Applicant argues Merritt does not disclose a load-bearing structure of a road is stabilized to a compression strength of at least 0.1MPa by using as the binder an activator which forms with road aggregate a hardenable geopolymeric or alkali-activatable mixture. However, the Examiner does not concur with Applicant’s critique of the non-final rejection of claims 7-13 as being unpatentable over Duffy in view of Merritt. Duffy discloses mixing soil and a binder. Merritt teaches it is known to mix alkali-activatable mixtures to soil to achieve compressive strengths far in excess of that claimed. It is noted Claim 7 does not include a step of mixing the binder with road aggregate to form a hardenable geopolymeric or alkali-activatable mixture. Rather, claim 7 requires “soil is treated with at least one binder to improve its compression strength and the soil is treated in a movable machine. the following “wherein statement” is not a step performed in the method rather it is a description of the end result of said method of treating soil. Hence, the intended use of the final product is not a patentable distinction in the performance of the method. Therefore the argument is not persuasive and the rejection is maintained. Applicant then argues “the Office’s characterization of Merritt as disclosing an alkali-activatable mixture is overly broad”. However, the Examiner does not concur. The claims do not define the term. With no standard of equivalence in the claims, a patentable distinction can not be upheld. Therefore the argument is not persuasive and the rejection is maintained. * In light of the prior art to Walker US 2010/0226722 it appears as though the “activator” with forms together with road aggregate a hardenable geopolymeric the Applicant claims, just might be fly ash. see [0071-0072]. Conclusion THIS ACTION IS MADE FINAL. Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. 6. Any inquiry concerning this communication or earlier communications from the examiner should be directed to RAYMOND W ADDIE whose telephone number is (571)272-6986. The examiner can normally be reached on m-f 7:30-12:30, then 6-9pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Chris Sebesta can be reached on 571-272-0547. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you need help from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /RAYMOND W ADDIE/Primary Examiner, Art Unit 3671 9/22/2026
Read full office action

Prosecution Timeline

Jan 06, 2023
Application Filed
Dec 17, 2025
Non-Final Rejection mailed — §103
Mar 16, 2026
Response Filed
Apr 09, 2026
Non-Final Rejection mailed — §103
Jul 09, 2026
Response Filed
Sep 24, 2026
Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12760475
FLOOR PAVEMENT STRUCTURE WITH PASSIVE TEMPERATURE CONTROL
3y 3m to grant Granted Oct 13, 2026
Patent 12753030
RAMP ASSEMBLY KIT FOR A CONTAINER
2y 6m to grant Granted Oct 06, 2026
Patent 12746454
Sports Field and Methods for Forming and Operating the Same
5y 4m to grant Granted Sep 29, 2026
Patent 12747544
HIGH-PRODUCTION TRUSS-MOUNTED SCREED ASSEMBLY
3y 4m to grant Granted Sep 29, 2026
Patent 12747367
PCM COATING ON THE FILLER MATERIAL
3y 2m to grant Granted Sep 29, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

4-5
Expected OA Rounds
81%
Grant Probability
90%
With Interview (+8.6%)
1y 12m (~0m remaining)
Median Time to Grant
High
PTA Risk
Based on 1592 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month