Prosecution Insights
Last updated: November 04, 2026
Application No. 18/078,433

Drilling method for a geothermal installation

Final Rejection §102§103
Filed
Dec 09, 2022
Priority
Dec 09, 2021 — provisional 63/287,544
Examiner
DUONG, THO V
Art Unit
3763
Tech Center
3700 — Mechanical Engineering & Manufacturing
Assignee
Eaposys SA
OA Round
2 (Final)
67%
Grant Probability
Favorable
3-4
OA Rounds
0m
Est. Remaining
85%
With Interview

Examiner Intelligence

Grants 67% — above average
67%
Career Allowance Rate
819 granted / 1222 resolved
-3.0% vs TC avg
Strong +18% interview lift
Without
With
+17.6%
Interview Lift
resolved cases with interview
Typical timeline
3y 3m
Avg Prosecution
31 currently pending
Career history
1257
Total Applications
across all art units

Statute-Specific Performance

§101
0.3%
-39.7% vs TC avg
§103
42.4%
+2.4% vs TC avg
§102
30.8%
-9.2% vs TC avg
§112
24.4%
-15.6% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1222 resolved cases

Office Action

§102 §103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Applicant’s amendment filed 7/27/2026 is acknowledged. Claims 1-15 are pending. Claims 1-7, 9, 12 and 15 remain withdrawn. Response to Arguments Applicant’s arguments with respect to claims 8, 10-11 and 13-14 have been considered but are moot because the new ground of rejection does not rely on any reference applied in the prior rejection of record for any teaching or matter specifically challenged in the argument. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claims 8, 10-11 and 13 are rejected under 35 U.S.C. 102(a)(2) as being anticipated by Toews et al. (US 20200011151A1). Regarding claim 8, Toews et al. discloses a geothermal installation within a geologic formation comprising an inlet conduit, an outlet conduit, a service conduit, and two interconnecting conduits, the interconnecting conduits fluidly coupled to and separately interconnecting the inlet conduit with the outlet conduit, characterized in that a first of the interconnection conduits is fluidly separated from the service conduit so that a heat transfer fluid can flow downwardly within the inlet conduit into the geologic formation, through the interconnecting conduits and upwardly within the outlet conduit. Regarding claim 10, Toews et al. discloses that the inlet conduit and the outlet conduit are arranged concentric. Regarding claim 11, Toews et al. discloses that the inlet conduit and the outlet conduit are arranged within the service conduit. Regarding claim 13, Toews et al. discloses that the inlet conduit and the outlet conduit are concentrically arranged within the service conduit. Claims 8 and 11 are rejected under 35 U.S.C. 102(a)(2) as being anticipated by Holtzman Benjamin (US 20210025623A1). Regarding claim 8, Holtzman Benjamin discloses (figure 11) a geothermal installation within a geologic formation comprising an inlet conduit (132), an outlet conduit (134), a service conduit (110), and two interconnecting conduits (112), the interconnecting conduits fluidly coupled to and separately interconnecting the inlet conduit (132) with the outlet conduit (134), characterized in that a first of the interconnection conduits (112) is fluidly separated from the service conduit (110) so that a heat transfer fluid can flow downwardly within the inlet conduit into the geologic formation, through the interconnecting conduits (112) and upwardly within the outlet conduit.(134) (paragraph 94). Regarding claim 11, Holtzman Benjamin discloses (figure 11) that the inlet conduit (132) and the outlet conduit (134) are arranged within the service conduit (110). Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claim 14 is rejected under 35 U.S.C. 103 as being unpatentable over Toews et al. (US 20200011151A1) in view of Graham et al. (CA 3045282A). Toews et al. substantially discloses all of applicant’s claimed invention as discussed above except for the limitation that the outlet conduit is arranged within the inlet conduit. Graham et al. discloses (page 20, lines 21-24 and figure 1) a geothermal system that has the outlet conduit (14) is concentrically arranged within the outlet conduit (12) for a purpose of allowing rapid ascent of the heat transfer fluid to minimize the heat loss from the upper section of the well. It would have been obvious to one having ordinary skill in the art before the effective filing date of the invention to use Graham’s teaching in Towes et al. device for a purpose of allowing rapid ascent of the heat transfer fluid to minimize the heat loss from the upper section of the well. Claims 10, 13 and 14 are rejected under 35 U.S.C. 103 as being unpatentable over Holtzman Benjamin in view of Ballegeer John (US 20200033014A1). Holtzman substantially discloses all of applicant’s claimed invention as discussed above except for the limitation that the inlet and the outlet conduit are arranged concentric within the service conduit and the outlet conduit is arranged within the inlet conduit. Ballegeer discloses (figure 4) a geothermal system that has the outlet conduit (67) is arranged concentrically inside the inlet conduit (68) within the service conduit (45) for a purpose of providing more efficient heat exchange system (paragraph 26). It would have been obvious to one having ordinary skill in the art before the effective filing date of the invention to use Ballegeer’s teaching in Holtzman’s device for a purpose of providing more efficient heat exchange system. Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to THO V DUONG whose telephone number is (571)272-4793. The examiner can normally be reached Monday through Friday 10-6PM. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Atkisson Jianying can be reached at 571-270-7740. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /THO V DUONG/Primary Examiner, Art Unit 3763
Read full office action

Prosecution Timeline

Show 1 earlier event
Nov 04, 2024
Response after Non-Final Action
Feb 03, 2025
Non-Final Rejection mailed — §102, §103
Jul 03, 2025
Response Filed
Jul 03, 2025
Response after Non-Final Action
Oct 30, 2025
Response Filed
Oct 30, 2025
Response after Non-Final Action
Jul 27, 2026
Response Filed
Oct 28, 2026
Final Rejection mailed — §102, §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12785176
BATTERY THERMAL MANAGEMENT VIA HEAT FROM WATER COOLED CONDENSER
3y 6m to grant Granted Nov 03, 2026
Patent 12782007
GEOTHERMAL ENERGY SYSTEM
1y 2m to grant Granted Nov 03, 2026
Patent 12766922
THERMAL MANAGEMENT SYSTEM
3y 3m to grant Granted Oct 20, 2026
Patent 12768604
HEAT EXCHANGER AND HEAT PUMP HAVING AT LEAST ONE SUCH HEAT EXCHANGER
2y 4m to grant Granted Oct 20, 2026
Patent 12760972
CAPILLARY WOVEN MESH STRUCTURE
3y 4m to grant Granted Oct 13, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
67%
Grant Probability
85%
With Interview (+17.6%)
3y 3m (~0m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 1222 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month