CTFR 18/194,400 CTFR 79126 DETAILED ACTION Notice of Pre-AIA or AIA Status 07-03-aia AIA 15-10-aia The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA. Claim Rejections - 35 USC § 102 07-07-aia AIA 07-07 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – 07-08-aia AIA (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. 07-15-aia AIA Claim(s) 1-3, 5-20 is/are rejected under 35 U.S.C. 102 (a)(1) as being anticipated by Yasin (US 2022/0100626) . Regarding to claims 1, 13, 19: Yasin discloses an apparatus comprising: a plurality of performance monitoring hardware resources ( FIG. 1, elements 116a-116n: Performance Counter ); hardware to capture, in response to a trigger from a second performance monitoring hardware resource of the plurality of performance monitoring hardware resource, a record of state data related to state of the apparatus in connection with an occurrence of an event ( FIG. 1, element 108: PEBS Handler Circuit. Paragraph [0038]: The performance counter may generate a performance record when the counter overflows. To trigger an overflow, the counter may be preset to a modulus value that may cause the counter to overflow after a specific number of events have been counted, which generates a performance record such as a PEBS record ); and storage to store a first indicator corresponding to at least a first performance monitoring hardware resource of the plurality of performance monitoring hardware resources and to enable the hardware to include, in the record, performance data from the first performance monitoring hardware resource ( FIG. 1, elements 118a-118n: PEBS Enable circuits. Paragraph [0042]: The PEBS enable circuit is activated, a PEBS record is stored. Wherein the PEBS record may include architectural metadata of a state of the system upon overflow of the performance counter. Abstract: “The first counter is to count occurrences of an event in the processor and to overflow upon the count of the occurrences reaching a specified value”, the first counter therefore reads on the claimed second performance monitoring hardware resource. “The second counter to measure a performance cost of the event”, the second counter thus reads on the claimed first performance monitoring hardware resource. “The record is to include at least one value reflecting the performance cost” measured by the second counter (the claimed first performance monitoring hardware resource). As a result, the record includes the data from the second counter (the claimed first performance monitoring hardware resource). Regarding to claims 2-3, 15 : wherein the first performance monitoring hardware resource is a first performance counter, wherein the performance data from the first performance monitoring hardware resource is a count from the first performance counter or is based on the count from the first performance counter ( FIG. 1, elements 116a-116n: Performance Counter ). Regarding to claims 5-6, 16: wherein the second performance monitoring hardware resource is a second performance counter, wherein the trigger is an overflow of the second performance counter ( paragraph [0038]: The performance counter may generate a performance record when the counter overflows. To trigger an overflow, the counter may be preset to a modulus value that may cause the counter to overflow after a specific number of events have been counted, which generates a performance record such as a PEBS record ). Regarding to claims 7-8, 17: wherein the storage is also to store a second indicator corresponding to at least the second performance counter and to enable the hardware to include, in the record, performance data from the second performance counter, wherein the performance data from the second performance counter is a count from the second performance counter or is based on the count from the second performance counter ( FIG. 1: The mem storage (110a-110n) stores the information from the counters ). Regarding to claims 9-10, 18: wherein the record is to include an identification of which of the plurality of performance monitoring hardware resources triggered capture of the record, wherein the identification is captured in the record regardless of the first indicator and the second indicator ( Abstract: The record is to include at least one value reflecting the performance cost ). Regarding to claims 11-12, 14: wherein the hardware is to capture the record during uninterrupted execution of an application program, wherein the apparatus includes a processing device to execute the application program ( paragraph [0084] ). Regarding to claim 20: wherein the system memory is also to store second software to read the record ( FIG. 12, element 1220 ) . Response to Arguments 07-37 AIA Applicant's arguments filed 9/8/2026 have been fully considered but they are not persuasive. In response to Applicant’s Remarks, the Examiner cites that, in Yasin, Abstract teaches: “The first counter is to count occurrences of an event in the processor and to overflow upon the count of the occurrences reaching a specified value”, the first counter therefore reads on the claimed second performance monitoring hardware resource. “The second counter to measure a performance cost of the event”, the second counter thus reads on the claimed first performance monitoring hardware resource. “The record is to include at least one value reflecting the performance cost” measured by the second counter (the claimed first performance monitoring hardware resource). As a result, the record includes data from the second counter (the claimed first performance monitoring hardware resource). Conclusion 07-39 AIA THIS ACTION IS MADE FINAL. Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. 07-100 Any inquiry concerning this communication or earlier communications from the examiner should be directed to LAM S NGUYEN whose telephone number is (571)272-2151. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, DOUGLAS RODRIGUEZ, can be reached on 571-431-0716. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /LAM S NGUYEN/ Primary Examiner, Art Unit 2853 Application/Control Number: 18/194,400 Page 2 Art Unit: 2853 Application/Control Number: 18/194,400 Page 3 Art Unit: 2853