Prosecution Insights
Last updated: November 20, 2026
Application No. 18/223,170

Boat Hull Protection System and Methods of Using Same

Non-Final OA §102§103
Filed
Jul 18, 2023
Priority
Jul 18, 2022 — provisional 63/390,140
Examiner
BENEDIK, JUSTIN M
Art Unit
3642
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
BNR CO., LTD.
OA Round
3 (Non-Final)
86%
Grant Probability
Favorable
3-4
OA Rounds
0m
Est. Remaining
96%
With Interview

Examiner Intelligence

Grants 86% — above average
86%
Career Allowance Rate
765 granted / 889 resolved
+34.1% vs TC avg
Moderate +10% lift
Without
With
+10.4%
Interview Lift
resolved cases with interview
Typical timeline
2y 5m
Avg Prosecution
6 currently pending
Career history
902
Total Applications
across all art units

Statute-Specific Performance

§101
0.5%
-39.5% vs TC avg
§103
51.1%
+11.1% vs TC avg
§102
28.9%
-11.1% vs TC avg
§112
13.1%
-26.9% vs TC avg
Black line = Tech Center average estimate • Based on career data from 889 resolved cases

Office Action

§102 §103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claim(s) 1-11, 13, 15 is/are rejected under 35 U.S.C. 102a1 as being anticipated by Perez-Collazo (US 6152061) The limitations in the claims below are disclosed in Perez 1. A boat hull protection system, comprising: a frame (Abstract); a liner cable (31, 32, 33); and an adjustable liner 20, 21 Perez further discloses where the liner cable 31 secures the liner 21, 20 to the frame (upper portion of 20 – element 23). 2. The boat hull protection system of claim 1, wherein the frame (abstract – tubular) is formed from a material which allows the frame to float on a surface of a body of water into which the boat hull protection system is installed (the tubular frame inherently floats and also includes floating devices as well). 3. The boat hull protection system of claim 1, further comprising a gate system 21. 4, The boat hull protection system of claim 3, wherein an enclosed slip is formed within the boat hull protection system when the gate system is in a raised configuration (Clearly understood from figures 1, 2, 4 and 5). 5. The boat hull protection system of claim 3, wherein a boat may enter or leave a slip of the boat hull protection system when the gate system is in a lowered configuration (Clearly understood from figures 1, 2, 4 and 5). 6. The boat hull protection system of claim 1, wherein the adjustable liner comprises an anti- algae, or algae-resistant materials (“bacterial and fungal corrosion resistant, such as Pro-Liner 40.RTM”). 7. The boat hull protection system of claim 1, wherein at least a portion of the adjustable liner is coated with an anti-algae or algae-resistant material (“bacterial and fungal corrosion resistant, such as Pro-Liner 40.RTM”). 8. The boat hull protection system of claim 1, wherein the adjustable liner is replaceable (inherently easily replaceable). 9. A gate system for a boat hull protection system, comprising: a gate member 21 secured to a portion of an adjustable liner 20 of a boat hull protection system; one or more gate cables 31 32 33; and one or more gate connection points (28, 38, 41) located about the boat hull protection system; wherein the gate member is configured to be raised or lowered by adjusting a configuration of the one or more gate cables in relation to the one or more gate connection points (See Fig. 1), thereby enclosing or opening a slip of the boat hull protection system (Clearly shown in Fig. 4 or 5). 10. The gate system of claim 9, wherein at least one of the one or more gate connection points is located on a structure (See 38 in Fig. 1) located adjacent to the boat hull protection system. 11. The gate system of claim 9, wherein the gate member is raised or lowered by manually (See man in Fig. 1). 13, 15. The rejections applied above are applied mutatis mutandis to the method limitations in claim 13, and 15. Claim(s) 12 is/are rejected under 35 U.S.C. 103 as being unpatentable over Perez-Collazo (US 6152061). 12. Perez does not disclose The gate system of claim 9, wherein the gate member is raised or lowered based upon operation of an electric motor but does disclose manual operation. It would have been obvious to one having ordinary skill in the art at the time the invention was made to use an automatic or powered mechanism rather than a manual one, since it has been held that broadly providing a mechanical or automatic means to replace manual activity which has accomplished the same result involves only routine skill in the art. In this case it would be obvious to use an electric motor in order to provide for remote operation. Claim(s) 14 is/are rejected under 35 U.S.C. 103 as being unpatentable over Perez-Collazo (US 6152061) in view of Jackson US 4280436. 14. Jackson discloses what Perez does not The method of claim 13, further comprising operating a pump to remove water from the slip. It would have been obvious to one of ordinary skill in the art at the time of the invention and with a reasonable expectation of success to incorporate the dewatering pump system of Jackson into the hull protection system of Perez I order to actively remove residual or accumulated water from the isolated slip region, thereby improving protective effect and reducing hull fouling Response to Arguments Applicant’s arguments, see remarks, filed 3/20/2026, with respect to the claims rejected using Perez have been fully considered and are not persuasive. Applicant argues that Perez does not disclose a liner being attached to the frame using the ropes. The examiner points out and makes clear the frame includes the front portion (tube) of the gate as pointed out by the applicant, however the frame would also include the rigid structure 23 around the liner as well, the cables attached to blocks attach all points of the liner to each frame element and under the broadest interpretation would tension, position and secure the liner relative to the frame. Pulling outward as in Perez maintaining spacing performs the limitation in the independent claims. Applicant further argues that the liner is not adjustable. The Examiner disagrees and points to a collapsible front portion, tension adjustment and the envelope moving relative to the hull as reasonable interpretation of the term adjustable liner. In response to applicants’ argument that Perez does not disclose a gate. The Examiner respectfully disagrees and points out a gate member could be anything that acts as a gate, the collapsible portion o Perez clearly meeting this limitation. Applicant argues that there is no motivation to combine Jackson with Perez. The examiner disagrees as Perez already teaches isolation, and fouling reduction, adding a pump enhances dryness, does not destroy the function of Perez while improving effectiveness. Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to JUSTIN M BENEDIK whose telephone number is (571)270-7824. The examiner can normally be reached 7:00-3:00. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Joshua Huson can be reached at 571-270-5301. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /JUSTIN M. BENEDIK/ Primary Examiner Art Unit 3642 /JUSTIN M BENEDIK/Primary Examiner, Art Unit 3642
Read full office action

Prosecution Timeline

Jul 18, 2023
Application Filed
Nov 06, 2025
Non-Final Rejection mailed — §102, §103
Mar 20, 2026
Response Filed
May 01, 2026
Final Rejection mailed — §102, §103
Nov 02, 2026
Request for Continued Examination
Nov 12, 2026
Response after Non-Final Action
Nov 18, 2026
Non-Final Rejection mailed — §102, §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12782095
FIN STABILIZED PROJECTILE
1y 8m to grant Granted Nov 03, 2026
Patent 12771016
WATER SURFACE FLOATING TYPE ELECTROMAGNETIC WAVE SIGNAL RELAY DEVICE
1y 11m to grant Granted Oct 20, 2026
Patent 12759684
STRUCTURE FOR ACCOMMODATING A POD FOR A TRACTION KITE AND METHOD FOR THE TAKE-OFF AND LANDING OF A SUCH A POD
2y 4m to grant Granted Oct 13, 2026
Patent 12759674
ACCESSORY SYSTEM FOR CONNECTING AN ACCESSORY TO A VEHICLE
2y 1m to grant Granted Oct 13, 2026
Patent 12752922
ICE PROTECTION SYSTEM USING WASTE HEAT RECOVERY
1y 3m to grant Granted Oct 06, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
86%
Grant Probability
96%
With Interview (+10.4%)
2y 5m (~0m remaining)
Median Time to Grant
High
PTA Risk
Based on 889 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month