Prosecution Insights
Last updated: November 20, 2026
Application No. 18/223,403

SOLAR PANEL INSTALLATION SYSTEM

Non-Final OA §103
Filed
Jul 18, 2023
Priority
Jul 19, 2022 — provisional 63/390,490 +7 more
Examiner
LAU, JASON
Art Unit
3762
Tech Center
3700 — Mechanical Engineering & Manufacturing
Assignee
Oshkosh Corporation
OA Round
1 (Non-Final)
54%
Grant Probability
Moderate
1-2
OA Rounds
0m
Est. Remaining
70%
With Interview

Examiner Intelligence

Grants 54% of resolved cases
54%
Career Allowance Rate
502 granted / 927 resolved
-15.8% vs TC avg
Strong +16% interview lift
Without
With
+15.8%
Interview Lift
resolved cases with interview
Typical timeline
3y 4m
Avg Prosecution
67 currently pending
Career history
992
Total Applications
across all art units

Statute-Specific Performance

§101
0.5%
-39.5% vs TC avg
§103
66.0%
+26.0% vs TC avg
§102
16.1%
-23.9% vs TC avg
§112
14.0%
-26.0% vs TC avg
Black line = Tech Center average estimate • Based on career data from 927 resolved cases

Office Action

§103
DETAILED ACTION Election/Restrictions Applicant’s election without traverse of Invention A – claims 1-18- in the reply filed on 6/18/2026 is acknowledged. Claims 19 and 20 are withdrawn from consideration. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claim(s) 1-5, 17, 18 is/are rejected under 35 U.S.C. 103 as being unpatentable over Schneider (US 20210379757 A1) in view of Holmberg (US 9963331 B1). Regarding claim 1, Schneider discloses a solar panel installation system comprising: a solar panel unloading machine (Fig. 1; 140); a solar panel carrier machine (130); and a solar panel installation machine (110); wherein: the solar panel unloading machine is configured to interact with a shipping device (Fig. 1; truck) carrying a plurality of solar panels to unload the plurality of solar panels from the shipping device and transfer the plurality of solar panels to the solar panel carrier machine (para. 39); the solar panel carrier machine is configured autonomously transport the plurality of solar panels to a location proximate where the plurality of solar panels are to be installed (para. 36); and the solar panel installation machine is configured to autonomously pick up a respective solar panel of the plurality of solar panels from the solar panel carrier machine and autonomously provide the respective solar panel to an installation location where the respective solar panel can be secured to a solar panel support (para. 36). Schneider fails to disclose: where the solar panel unloading machine autonomously interacts with the shipping device and autonomously transfers the plurality of solar panels to the solar panel carrier machine. Schneider does not state whether the solar panel unloading machine is manually or automatically operated. However, Holmberg teaches fully automating the unloading machine (Fig. 1A; 116). Holmberg further teaches where the unloading machine is configured to autonomously interact with the shipping device (118) (col. 5, lines 53-58 and col. 6, lines 12-15). It would have been obvious to a person skilled in the art at the time of effective filing of the application to modify Schneider where the solar panel unloading machine is fully automated such that it autonomously interacts with the shipping device and autonomously transfers the plurality of solar panels to the solar panel carrier machine. The motivation to combine is to fully automate the system. Regarding claim 2, modified Schneider discloses the solar panel installation system of Claim 1, wherein the shipping device is a shipping container or a trailer (Schneider; fig. 1). Regarding claim 3, modified Schneider discloses the solar panel installation system of Claim 1, wherein the solar panel carrier machine includes a second wireless communications interface (Fig. 2; 132), and the solar panel installation machine includes a third wireless communications interface (each machine has a control system that wirelessly communicates with a central control system; para. 37), and wherein the second wireless communications interface and the third wireless communications interface are configured to facilitate second wireless communications between the solar panel carrier machine and the solar panel installation machine (the machines communicate with each other via the network); EXCEPT wherein the solar panel unloading machine includes a first wireless communications interface, wherein the first wireless communications interface and the second wireless communications interface are configured to facilitate first wireless communications between the solar panel unloading machine and the solar panel carrier machine. However, the various machines each have an interface that communicates via a network to a system controller 250, which means they all communicate with each other via the system controller and the network. It would have been obvious to modify the automated solar panel unloading machine to include a network interface so that it can be integrated into the network and controlled by the system controller. As it relates to the claim, it would have been obvious to a person skilled in the art at the time of effective filing of the application to modify Schneider wherein the solar panel unloading machine includes a first wireless communications interface, wherein the first wireless communications interface and the second wireless communications interface are configured to facilitate first wireless communications between the solar panel unloading machine and the solar panel carrier machine. The motivation to combine is so that the solar panel installation system can be fully automated. Regarding claim 4, modified Schneider discloses the solar panel installation system of Claim 3, wherein at least a portion of at least one of the first wireless communications or the second wireless communications passes through a remote server (Schneider; para. 59). Regarding claim 5, modified Schneider discloses (see Schneider) the solar panel installation system of Claim 3, wherein the second wireless communications include leader-follower signals to coordinate motion between the solar panel installation machine and the solar panel carrier machine as the solar panel installation machine picks up each solar panel of the plurality of solar panels from the solar panel carrier machine and provides each solar panel to a corresponding installation location. The system controller (250) can send leader signals to both the solar panel installation machine and the solar panel carrier machine to direct their movement. Each machine can provide follower signals from sensors 260 to the system controller to inform the system controller of its location (para. 42) Regarding claim 17, modified Schneider discloses (see Schneider) the solar panel installation system of Claim1, wherein the solar panel installation machine includes: a second boom (Fig. 3A; 212); and an implement coupled to an end of the second boom, the implement including: a track (220); a robotic arm (230) coupled to and translatable along the track; and a grabber assembly (240) coupled to the robotic arm, the grabber assembly configured to engage with and facilitate picking up the respective solar panel. Regarding claim 18, modified Schneider discloses (see Schneider) the solar panel installation system of Claim 17, wherein the grabber assembly includes a plurality of suction interfaces (para. 50). Claim(s) 6-10, is/are rejected under 35 U.S.C. 103 as being unpatentable over Schneider (US 20210379757 A1) in view of Holmberg (US 9963331 B1), as applied to claim 1, and further in view of Turnbull (US 20050220588 A1). Regarding claim 6, modified Schneider discloses (see Schneider for citations unless otherwise noted) the solar panel installation system of Claim 1, wherein the solar panel unloading machine includes: a pair of forks (240), the pair of forks configured to engage (indirectly engage) with a pallet or support structure upon which the plurality of solar panels (120A) are disposed; EXCEPT a boom assembly; and a carriage pivotably coupled to an end of the boom assembly. However, Turnbull teaches a forklift comprising a boom assembly (Fig. 4; 23); a carriage (Fig. 6; 25) pivotably coupled to an end of the boom assembly; and a pair of forks (27) coupled to the carriage (Fig. 2). It would have been obvious to a person skilled in the art at the time of effective filing of the application to modify the solar panel unloading machine (forklift 140) of Schneider to include a boom assembly; a carriage pivotably coupled to an end of the boom assembly, and where the pair of forks are coupled to the carriage. The modification is a simple substitution of one type of forklift for another, and the results would have been predictable. Moreover, the boom would allow the forks to reach deep into the shipping device to retrieve the pallets. Regarding claim 7, modified Schneider discloses (see Turnbull) the solar panel installation system of Claim 6, wherein the carriage includes: a first portion (Fig. 12; two horizontally extending members directly attached to the forks 27) extending beneath the end of the boom assembly; and a second portion (Fig. 12; portion behind the two horizontally extending members) extending substantially perpendicular to the first portion, wherein the second portion is pivotably coupled to the end of the boom assembly. Regarding claim 8, modified Schneider discloses (see Turnbull) the solar panel installation system of Claim 7, wherein the pair of forks are pivotably coupled to the second portion (Fig. 12). Regarding claim 9, modified Schneider discloses (see Turnbull) the solar panel installation system of Claim 7, wherein the solar panel unloading machine includes an actuator extending between the end of the boom assembly and the second portion of the carriage (para. 50). Regarding claim 10, modified Schneider discloses (see Turnbull) the solar panel installation system of Claim 7, wherein the carriage includes a plurality of rollers (Fig. 13; pivot points 69 inherently must have rollers, e.g., pins or bearings, that permit the linkages to pivot around the pivot points) coupled to the first portion. Note: even if rollers are not inherently disclosed, it would have been obvious to a person skilled in the art at the time of effective filing of the application to modify the forklift wherein the carriage includes a plurality of rollers (e.g., pins, bearings) coupled to the first portion. The motivation to combine is so that the linkages of the carriage can pivot about the different axes. Allowable Subject Matter Claims 11-16 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to JASON LAU whose telephone number is (571)270-7644. The examiner can normally be reached Mon-Fri 8:00-5:00. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Michael Hoang can be reached at 571-272-6460. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /JASON LAU/Primary Examiner, Art Unit 3762
Read full office action

Prosecution Timeline

Jul 18, 2023
Application Filed
Oct 28, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12800226
DRYER FOR HERBACEOUS MATERIAL HAVING INCLINED VANES
4y 11m to grant Granted Nov 17, 2026
Patent 12798154
APPARATUS AND METHOD FOR TREATING INCOHERENT MATERIAL
4y 3m to grant Granted Nov 17, 2026
Patent 12768597
SLAG DOOR ARRANGEMENT AND CLEANING METHOD
3y 11m to grant Granted Oct 20, 2026
Patent 12760233
GASIFICATION SYSTEM AND WASTEWATER TREATMENT METHOD
4y 3m to grant Granted Oct 13, 2026
Patent 12753545
LAUNDRY TREATING APPARATUS
4y 8m to grant Granted Oct 06, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
54%
Grant Probability
70%
With Interview (+15.8%)
3y 4m (~0m remaining)
Median Time to Grant
Low
PTA Risk
Based on 927 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month