DETAILED ACTION
Notice of Pre-AIA or AIA Status
The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA .
Priority
Acknowledgment is made of applicant’s claim for foreign priority under 35 U.S.C. 119 (a)-(d). The certified copy has been filed in parent Application No. CN2022110098212, filed on May 24, 2023.
Claim Objections
Claim 1 is objected to for reciting “the container preprocessing unit (1)” throughout the claim, as antecedent basis is from “a container pretreatment unit (1).” Therefore, the clam should recite “the container pretreatment unit (1)”. Appropriate correction is required.
Claim 1 is objected to for reciting “the expected delay time unit (6)” throughout the claim, as antecedent basis is from “a desired delay time unit (6).” Therefore, the claim should recite “the desired delay time unit (6).” Appropriate correction is required.
Claim 1 is objected to for reciting “the container operation delay strategy unit (9)” throughout the claim, as antecedent basis is from “a container handling delay strategy unit (9).” Therefore, the claim should recite “the container handling delay strategy unit (9).” Appropriate correction is required. Claim 2 is objected to by virtue of dependency.
Claim 1 is objected to for reciting “the container operation delay strategy unit (9)” throughout the claim, as antecedent basis is from “a container handling delay strategy unit (9).” Therefore, the claim should recite “the container handling delay strategy unit (9).” Appropriate correction is required. Claim 2 is objected to by virtue of dependency.
Claim 2 is objected to for reciting, “The…method…according to claim 1, wherein:” and lists “setting the average waiting time…as…, setting the …value… as…, setting the…value…as….” etc…; however none of the “setting” steps have antecedent support in claim 1, such that the term “wherein” would modify previously recited setting steps. Therefore, claim 2 should recite “The…method…according to claim 1, further comprising:” and list the newly introduced steps. Appropriate correction is required.
Claim Interpretation
The following is a quotation of 35 U.S.C. 112(f):
(f) Element in Claim for a Combination. – An element in a claim for a combination may be expressed as a means or step for performing a specified function without the recital of structure, material, or acts in support thereof, and such claim shall be construed to cover the corresponding structure, material, or acts described in the specification and equivalents thereof.
The following is a quotation of pre-AIA 35 U.S.C. 112, sixth paragraph:
An element in a claim for a combination may be expressed as a means or step for performing a specified function without the recital of structure, material, or acts in support thereof, and such claim shall be construed to cover the corresponding structure, material, or acts described in the specification and equivalents thereof.
The claims in this application are given their broadest reasonable interpretation using the plain meaning of the claim language in light of the specification as it would be understood by one of ordinary skill in the art. The broadest reasonable interpretation of a claim element (also commonly referred to as a claim limitation) is limited by the description in the specification when 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, is invoked.
As explained in MPEP § 2181, subsection I, claim limitations that meet the following three-prong test will be interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph:
(A) the claim limitation uses the term “means” or “step” or a term used as a substitute for “means” that is a generic placeholder (also called a nonce term or a non-structural term having no specific structural meaning) for performing the claimed function;
(B) the term “means” or “step” or the generic placeholder is modified by functional language, typically, but not always linked by the transition word “for” (e.g., “means for”) or another linking word or phrase, such as “configured to” or “so that”; and
(C) the term “means” or “step” or the generic placeholder is not modified by sufficient structure, material, or acts for performing the claimed function.
Use of the word “means” (or “step”) in a claim with functional language creates a rebuttable presumption that the claim limitation is to be treated in accordance with 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph. The presumption that the claim limitation is interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, is rebutted when the claim limitation recites sufficient structure, material, or acts to entirely perform the recited function.
Absence of the word “means” (or “step”) in a claim creates a rebuttable presumption that the claim limitation is not to be treated in accordance with 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph. The presumption that the claim limitation is not interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, is rebutted when the claim limitation recites function without reciting sufficient structure, material or acts to entirely perform the recited function.
Claim limitations in this application that use the word “means” (or “step”) are being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, except as otherwise indicated in an Office action. Conversely, claim limitations in this application that do not use the word “means” (or “step”) are not being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, except as otherwise indicated in an Office action.
This application includes one or more claim limitations that do not use the word “means,” but are nonetheless being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, because the claim limitation(s) uses a generic placeholder that is coupled with functional language without reciting sufficient structure to perform the recited function and the generic placeholder is not preceded by a structural modifier. Such claim limitation(s) is/are: a container arrival pretreatment unit, an expected pretreatment time unit, an adjustment time unit, an allocation delay strategy unit; a container handling requirement forecasting unit, a desired delay time unit, a first adjustment time unit, a second adjustment time unit, a container handling delay strategy unit, integral unit, first integral unit, and second integral unit in claim 1.
Because this/these claim limitation(s) is/are being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, it/they is/are being interpreted to cover the corresponding structure described in the specification as performing the claimed function, and equivalents thereof.
If applicant does not intend to have this/these limitation(s) interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, applicant may: (1) amend the claim limitation(s) to avoid it/them being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph (e.g., by reciting sufficient structure to perform the claimed function); or (2) present a sufficient showing that the claim limitation(s) recite(s) sufficient structure to perform the claimed function so as to avoid it/them being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph.
Claim Rejections - 35 USC § 112
The following is a quotation of the first paragraph of 35 U.S.C. 112(a):
(a) IN GENERAL.—The specification shall contain a written description of the invention, and of the manner and process of making and using it, in such full, clear, concise, and exact terms as to enable any person skilled in the art to which it pertains, or with which it is most nearly connected, to make and use the same, and shall set forth the best mode contemplated by the inventor or joint inventor of carrying out the invention.
The following is a quotation of the first paragraph of pre-AIA 35 U.S.C. 112:
The specification shall contain a written description of the invention, and of the manner and process of making and using it, in such full, clear, concise, and exact terms as to enable any person skilled in the art to which it pertains, or with which it is most nearly connected, to make and use the same, and shall set forth the best mode contemplated by the inventor of carrying out his invention.
Claims 1-2 are rejected under 35 U.S.C. 112(a) or 35 U.S.C. 112 (pre-AIA ), first paragraph, as failing to comply with the written description requirement. The claim(s) contains subject matter which was not described in the specification in such a way as to reasonably convey to one skilled in the relevant art that the inventor or a joint inventor, or for applications subject to pre-AIA 35 U.S.C. 112, the inventor(s), at the time the application was filed, had possession of the claimed invention.
Claim 1 recites a container arrival pretreatment unit, an expected pretreatment time unit, an adjustment time unit, an allocation delay strategy unit; a container handling requirement forecasting unit, a desired delay time unit, a first adjustment time unit, a second adjustment time unit, a container handling delay strategy unit, integral unit, first integral unit, and second integral unit, each performing a function. However, the specification fails to disclose any hardware or software for the units, such that one of ordinary skill in the art can reasonably conclude that the inventor possessed the claimed subject matter at the time of filing.
Claim 2 is rejected by virtue of dependency.
The following is a quotation of 35 U.S.C. 112(b):
(b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention.
The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph:
The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention.
Claims 1-2 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention.
Claim 1 recites “the…CPS comprising:….a container handling requirement forecasting unit (5)”. However, the claim recites several subsequence recitations of “the container operation demand forecasting unit (5)” (emphasis added). It is unclear if “the container operation demand forecasting unit (5)” refers to “a container handling requirement forecasting unit (5)” or is a different container forecasting unit. For examination purposes, “a container handling requirement forecasting unit (5)” will be interpreted as reciting “a container operation demand forecasting unit (5)”, and therefore the subsequent recitations of “the container operation demand forecasting unit (5)” will have antecedent support.
Claim 1 recites “an expected container pretreatment requirement DFCPR” and then subsequently recites “an expected completion of the container pretreatment demand DFCPR”. Therefore, it is unclear what the acronym “DFCPR” represents. For examination purposes, the claim will be interpreted as DFCPR only referring to “an expected container pretreatment requirement”.
Claim 1 recites “a completed container pretreatment requirement FCPR”, and then subsequently recites: (i) “container preprocessing requirements FCPR”; (ii) the finished container pretreatment requirement FCPR; and (iii) “a pretreatment completion rate FCPR”. Therefore, it is unclear what the acronym “FCPR” represents. For examination purposes, the claim will be interpreted as FCPR only referring to a “finished container pretreatment requirement FCPR”.
Claim 1 recites obtain “a container pretreatment demand difference EFCPR”. However, a subsequent recitation states setting a “completed container preprocessing requirement difference EFCPR”. Therefore, it is unclear what the acronym “EFCPR” represents, either: (i) a container pretreatment demand difference, or (ii) a completed container preprocessing requirement difference. For examination purposes, the claim will be interpreted as EFCPR only referring to “completed container preprocessing requirement difference EFCPR”.
Claim 1 recites initially recites “adding to an output PCPR for a planned container pretreatment requirement” and subsequently recites: (i) setting “a planned container preprocessing demand PCPR”, (ii) multiplying “a planned container preprocessing requirement PCPR”, (iii) “the planned container pretreatment demand PCPR”, and (iv) “a preset container pretreatment requirement PCPR. It is unclear what PCPR represents, as there are multiple definitions. For examination purposes, the claim will be interpreted as reciting “adding an output for a planned container pretreatment requirement PCRP” and interpreting as PCRP a planned container pretreatment requirement.
Claim 1 recites “an allocation completion amount COMRATE1” but subsequently recites: (i) “an allocation completion rate” COMRATE1, (ii) the container operation completion amount COMRATE1, and (iii) the container allocation completion rate COMRATE1. Therefore, it is unclear what COMRATE1 represents, as there are multiple definitions. For examination purposes, the claim will be interpreted as reciting “a container allocation completion rate COMRATE1”.
Claim 1 recites “an input container operation demand ACHR” but subsequently recites: (i) “the container operation requirements ACHR”, (ii) “a container operation demand ACHR”, (iii) “the container operation requirement ACHR”, and (iv) “the container operation demand ACHR”. Therefore, it is unclear what ACHR represents, as there are multiple definitions. For examination purposes, the claim will be interpreted as reciting “a input container operation demand ACHR”.
Claim 1 recites “a container operation requirement CHIP” but subsequently recites “the container operation demand CHIP”. Therefore, it is unclear what CHIP represents, as there are multiple definitions. For examination purposes, the claim will be interpreted as reciting “a container operation requirement CHIP”.
Claim 1 recites “an unfinished container operation volume UCHR” but subsequently recites: (i) “container port's unfinished container workload UCHR”, (ii) “unfinished container handling requirement UCHR” and “the container port unfinished container handling requirement UCHR”. Therefore, it is unclear what UCHR represents, as there are multiple definitions. For examination purposes, the claim will be interpreted as reciting “an unfinished container handling requirement UCHR”.
Claim 1 recites “in the subsystem CHS”. It is unclear whether “the subsystem CHS” refers to: (i) a container handling subsystem CHS, or (ii) a second subsystem CHS. For examination purposes, the claim will be interpreted as referring to (i).
Claim 1 recites “in the subsystem CPS” and “the CPS”. It is unclear whether “the subsystem CPS” and “CPS” refers to: (i) a container preprocessing system CPS, (ii) a first subsystem CPS, (iii) a simulation subsystem CPS. For examination purposes, the claim will be interpreted as referring to (i).
Claim 1 recites using “FL to characterize the fluctuation of the actual arrival rate of containers in the container pretreatment subsystem” but subsequently recites: (i) FL and RE reflecting “a affordability and resilience of the container logistics supply chain system to a certain extent”, and (ii) FL … representing a bearing capacity….of the supply chain system. Therefore, it is unclear what FL actually defines as there are multiple characterizations and representations, but no actual definitions. For examination purposes, the claim will be interpreted FL being defined as the fluctuation of the actual arrival rate of containers in the container pretreatment subsystem.
Furthermore, the term “certain extent” is a relative term which renders the claim indefinite. The term “certain extent” is not defined by the claim, the specification does not provide a standard for ascertaining the requisite degree, and one of ordinary skill in the art would not be reasonably apprised of the scope of the invention. For examination purposes the claim will be interpreted as reciting “FL and RE reflecting a affordability and resilience of the container logistics supply chain system”.
Claim 1 recites “RE integrating a deviation value of the response of the two subsystems of the container logistics supply chain system as a deviation of a overall system” but subsequently recites: (i) RE reflecting a….resilience of the container logistics supply chain system to a certain extent; (ii) RE biasing towards a deviation of the output of the container logistics supply chain system, representing a degree of recovery under the influence of adverse events; and (iii) RE representing …. resilience of the supply chain system. Therefore, it is unclear what RE actually defines as there are multiple characterizations and representations, but no actual definitions. For examination purposes, the claim will be interpreted RE being defined as a resilience of the container logistics supply chain system.
Claim 1 recites “the container operation delay strategy unit (9) setting the container operation capacity PCHR as the input, and a built-in container operation delay strategy function to do the product operation.” It is unclear what the “the container operation capacity PCHR” is an input for, as the term “the input” implies that it has antecedent support. However, the claim recites various “an input”. For examination purposes, the claim will be interpreted as reciting “the container operation delay strategy unit (9) setting the container operation capacity PCHR as an input for a built-in container operation delay strategy function to do the product operation.”
Claim 1 also recites a container arrival pretreatment unit, an expected pretreatment time unit, an adjustment time unit, an allocation delay strategy unit; a container handling requirement forecasting unit, a desired delay time unit, a first adjustment time unit, a second adjustment time unit, a container handling delay strategy unit, integral unit, first integral unit, and second integral unit, each performing a function. However, the specification fails to disclose any structure, e.g., hardware or software, for the units. Therefore, it is unclear what the metes and bounds of the claim are. For examination purposes, the claim will be interpreted as the units being hardware, e.g., processor units.
Claim 2 is rejected by virtue of dependency.
Claim Rejections - 35 USC § 101
35 U.S.C. 101 reads as follows:
Whoever invents or discovers any new and useful process, machine, manufacture, or composition of matter, or any new and useful improvement thereof, may obtain a patent therefor, subject to the conditions and requirements of this title.
Claims 1-2 are rejected under 35 U.S.C. 101 because the claimed invention is directed to an abstract idea without significantly more.
Step 1
Claims 1-2 recite a method (i.e., process). Therefore, the claims all fall within one of the four statutory categories of invention.
Step 2A, Prong One
Claim 1 recites: a resilience enhanced simulation method for a container logistics supply chain system based on adaptive fuzzy double feedback, wherein the container logistics supply chain system comprising a multitude of container ships, a container port and a container freight station; the multitude of container ships, the container port and the container freight station coordinating for a smooth transportation and a transshipment of a goods: the container ships arriving at the container port, the container port obtaining an actual arrival rate of the container, a waiting time of the container at an anchorage, a delay time of berth allocation, and a container operation time; the container freight station unloading the goods from the container ship, finally, according to a shipper's requirements, distributing a multitude of the goods in a multitude of containers to an end user or other destinations; the resilience enhanced simulation method for the container logistics supply chain system based on adaptive fuzzy double feedback comprises the following steps: step 1, establishing a container logistics supply chain simulation system, comprising two subsystems: a container preprocessing subsystem CPS and a container handling sub system CHS, setting a non-negative unit step function waveform as an actual arrival rate of the container CARATE, setting it as a system input, and performing a product operation through a built-in container arrival preprocessing function to output an average container arrival rate AVRATE; setting the average container arrival rate AVRATE as input, and multiplying with an expected lead period E of a built-in pre-processing subsystem; an expected container pretreatment requirement DFCPR subtracting a completed container pretreatment requirement FCPR from an integral unit to obtain a container pretreatment demand difference EFCPR; setting a completed container preprocessing requirement difference EFCPR as input, and dividing a built-in adjustment time parameter TFCPR, and obtaining an operation result as an adjustment amount FCPRadj of FCPR; an adjustment amount of FCPRadj and the average container arrival rate AVRATE adding to an output PCPR for a planned container pretreatment requirement; setting a planned container preprocessing demand PCPR as input, and a built-in allocation delay strategy function
PNG
media_image1.png
34
70
media_image1.png
Greyscale
to do a product operation, the operation result being an allocation completion amount COMRATE1, COMRATE1 as an input of the container operation demand forecasting unit, subtracting a container operation completion capacity COMRATE, TP1 being an allocation delay time, and s being a complex frequency domain variable of a Laplace transform; an allocation completion rate COMRATE1 subtracting an actual container arrive rate CARATE, outputting a calculation result to the integral unit; the integral unit outputting a finished container pretreatment requirement FCPR; multiplying an input container operation demand ACHR with a built-in container operation demand forecasting function
PNG
media_image2.png
26
75
media_image2.png
Greyscale
to output an average container operation demand AVCHR; TA being a time constant of container operation demand forecasting, and s being a complex frequency domain variable of the Laplace transform; connecting to obtain the average container operation demand AVCHR as input, and multiplying a built-in expected delay time parameter TQ to output an expected container operation demand DCHIP; subtracting a container operation requirement CHIP obtained by a first integral unit from a container operation requirement in processing DCHIP, and outputting a difference in container operation demand in processing ECHIP; with ECHIP as input, and a built-in first adjustment time parameter TCHIP to do division operation, ECHIP dividing by TCHIP operation result being CHIPadj; setting an unfinished container operation volume UCHR output by a model as input, and dividing a built-in second adjustment time TUCHR, and dividing UCHR by TUCHR to obtain an operation result of UCHRadj; an adjustment amount of UCHRadj and an adjustment amount of CHIP CHIPadj and the AVCHR adding to a sum of three outputs for a container operation capacity PCHR; etting the container operation capacity PCHR as the input, and a built-in container operation delay strategy function to do the product operation, and the output being the container operation completion capacity COMRATE; TP being an actual delay time parameter; s being the complex frequency domain variable of the Laplace transform;
obtaining the container operation capacity PCHR and the container operation completion capacity RATE to do a subtraction operation, the operation result outputting to the first integration unit, and a first integration unit outputting the container operation requirements in processing CHIP; obtaining the container operation requirements ACHR, subtracting the container operation completion capacity COMRATE, and outputting the operation result; outputting the average container arrival rate AVRATE; connecting for output, and obtaining an expected completion of the container pretreatment demand DFCPR; obtaining a completed container preprocessing requirements FCPR, receiving an output of the container arriving, and outputting the adjustment amount FCPRadj of FCPR; receive the output and obtaining the container operation completion amount COMRATE1, and using it as the input of the container handing subsystem; receiving the output, and obtaining the container preprocessing requirement FCPR; outputting the average container operation demand AVCHR; connecting for output, obtaining the expected processing container operation demand DCHIP; capturing the CHIP of the container operation requirements in process; receiving the output and outputting the adjustment amount CHIPadj of CHIP; receiving the unfinished container operation volume UCHR outputting by the model, and obtaining the adjustment amount UCHRadj of UCHR; receiving the output and outputting the container operation completion capacity COMRATE; the second integral unit receiving the unfinished container operation volume UCHR in the container port, and finally obtaining the UCHR output waveform of the container operation sub system; step 2, based on the container logistics supply chain system comprising the container preprocessing subsystem and the container operation subsystem, describing the state space of the system, and obtaining the corresponding transfer function; step 2.1, determining the transfer functions of COMRATE1 and the planned container pretreatment demand PCPR in a first subsystem CPS relative to the actual arrival rate of the container; in the subsystem CPS, setting the variable integral of the difference between the container allocation completion rate COMRATE1 and an actual container arrival rate CARATE over time as a pretreatment completion rate FCPR of the CPS in the container pretreatment subsystem;
PNG
media_image3.png
32
312
media_image3.png
Greyscale
then, multiplying a planned container preprocessing requirement PCPR and the allocation delay strategy function
PNG
media_image4.png
23
75
media_image4.png
Greyscale
obtaining the allocation completion rate COMRATE1 expressed by the indefinite integral, wherein decomposing into 1/S and 1/TP1 series when calculating
PNG
media_image5.png
29
50
media_image5.png
Greyscale
and adding a feedback loop;
PNG
media_image6.png
36
399
media_image6.png
Greyscale
multiplying the actual container arrival rate CARATE and the container operation delay strategy function
PNG
media_image7.png
31
82
media_image7.png
Greyscale
obtaining the average container arrival rate AVRATE represented by an indefinite integral, wherein decomposing into 1/S and 1/TP series when calculating, and adding a feedback loop
PNG
media_image8.png
35
446
media_image8.png
Greyscale
the container logistics supply chain simulation system selecting FCPR=x1, ∫(PCPR(t)−COMRATE1(t)dt=x2, AVRATE·TWAIT=x3, where x1 representing the completed container pretreatment requirement, x2 representing the integral of the difference between the planned container pre-processing requirement and the allocated completion volume, and x3 representing the average container actual arrival rate status, then:
PNG
media_image9.png
107
332
media_image9.png
Greyscale
describing a preset container pretreatment requirement PCPR of the simulation as:
PNG
media_image10.png
36
246
media_image10.png
Greyscale
describing the continuous closed-loop state space of CPS in the container pretreatment stage as:
PNG
media_image11.png
119
378
media_image11.png
Greyscale
describing the transfer function of the allocation completion amount COMRATE1 and the planned container pretreatment demand PCPR relative to the actual arrival rate of the container CARATE in the container pretreatment subsystem CPS as:
PNG
media_image12.png
110
421
media_image12.png
Greyscale
step 2.2, determining a transfer function of the unfinished container operation volume UCHR and the container operation capacity PCHR relative to a container operation demand ACHR respectively in a second subsystem CHS;
in the subsystem CHS, setting the difference between the container operation requirement ACHR and the container operation completion capacity COMRATE as the indefinite integral over time as the uncompleted container operation volume UCHR in the simulation;
PNG
media_image13.png
26
284
media_image13.png
Greyscale
setting the difference between the container operation capacity PCHR and the container operation completion capacity CARRIER as the variable integral over time as the container operation demand CHIP in processing;
PNG
media_image14.png
21
267
media_image14.png
Greyscale
multiplying the container operation demand ACHR and a container operation demand forecasting function
PNG
media_image15.png
29
45
media_image15.png
Greyscale
to obtain the average container operation demand AVCHR, wherein decomposing into 1/S and 1/TA series when calculating
PNG
media_image16.png
28
76
media_image16.png
Greyscale
and adding a feedback loop from 1/TA,
PNG
media_image17.png
24
318
media_image17.png
Greyscale
the container logistics supply chain simulation system selecting UCHR=x4, CHIP=x5, AVCHR·TA=x6, where x4 and x5 representing the outstanding container operation volume and the container operation demand in processing, respectively, and x6 representing the average container operation demand, then:
PNG
media_image18.png
188
357
media_image18.png
Greyscale
describing the transfer function of the unfinished container operation volume UCHR and the container operation capacity PCHR relative to the container operation requirement
ACHR in the container operation subsystem CHS as:
PNG
media_image19.png
112
412
media_image19.png
Greyscale
step 2.3, determining a transfer function between the unfinished container operation volume UCHR and the container operation capacity PCHR in the CHS relative to the actual arrival rate CARATE of the input container in the CPS, respectively;
describing the transfer function of the unfinished container operation volume UCHR and the container operation capacity PCHR relative to the actual arrival rate of the input container in an upper subsystem CARATE as follows:
PNG
media_image20.png
44
443
media_image20.png
Greyscale
step 2.4, after deriving a transfer function, an actual arrival rate CARATE of the container input in a first stage representing as the non-negative unit step function waveform, and obtaining the final response state
PNG
media_image21.png
27
99
media_image21.png
Greyscale
according to a final value theorem
PNG
media_image22.png
42
215
media_image22.png
Greyscale
describing a state space of the container logistics supply chain simulation system as:
PNG
media_image23.png
594
672
media_image23.png
Greyscale
when the actual container arrival rate CARATE input by a simulation subsystem CPS being a unit step signal, obtaining a final response of the model according to the final value theorem:
PNG
media_image24.png
84
383
media_image24.png
Greyscale
from equation (25), uchr(∞) depending on TUCHR
PNG
media_image25.png
21
13
media_image25.png
Greyscale
TCHIP
PNG
media_image25.png
21
13
media_image25.png
Greyscale
TP and TQ, when TP=TQ, uchr (∞)=0; uchr(t) being the Laplace transform of UCHR, and s being the complex frequency domain variable of the Laplace transform; step 3, designing a two-dimensional indicator R to measure the resilience of the container logistics supply chain:
PNG
media_image26.png
282
397
media_image26.png
Greyscale
wherein, using FL to characterize the fluctuation of the actual arrival rate of containers in the container pretreatment subsystem CPS when inputting CARATE, and a fluctuation of the container operation capacity PCHR in the container operation subsystem CHS relative to the actual arrival rate of the container input container in the CPS subsystem, the smaller the fluctuation, the more accurate the response ability to the input of the CPS subsystem, and the higher the stability of the container logistics supply chain system. the calculation of FL comprehensively considering the system status of the CHS subsystem and the system input of the CPS subsystem, reflecting the bearing capacity of the container logistics supply chain system under a impact of adverse events, RE integrating a deviation value of the response of the two subsystems of the container logistics supply chain system as a deviation of a overall system; FL and RE reflecting a affordability and resilience of the container logistics supply chain system to a certain extent, but FL biasing towards a fluctuation degree within the container logistics supply chain system, and RE biasing towards a deviation of the output of the container logistics supply chain system, representing a degree of recovery under the influence of adverse events, FL and RE representing a bearing capacity and resilience of the supply chain system respectively, the smaller the internal fluctuation of the system, the stronger the bearing capacity, the smaller the degree of output deviation, and the stronger the resilience; ITAEUCHR and ITAEFCPR representing an accumulation of deviations of UCHR and FCPR with time, respectively; the smaller the values of ITAEUCHR and ITAEFCPR, the better the response and recovery ability of the system; setting α and β as proportional coefficients to make orders of magnitude of ITAEUCHR and ITAEFCPR coordinate with FL; therefore, for a resilience index R, smaller R representing a better performance of the system; in formula (32-33), EUCHR representing a deviation between the actual value of UCHR and an input actual container arrive rate CARATE, EFCPR representing a deviation between an actual value of FCPR and an input actual container arrive rate CARATE; different from EFCPR, EFCPR being the difference of the finished container pretreatment requirement, representing a deviation between a desired value of FCPR DFCPR and FCPR; wherein EUCHR=uchr(t)−uchr(∞), EFCPR=fcpr(t)−fcpr(∞); from Equation (25), obtaining
PNG
media_image27.png
36
451
media_image27.png
Greyscale
step 4, based on a container preprocessing requirements FCPR and a container port's unfinished container workload UCHR, constructing two feedback paths between an adaptive fuzzy control and the container logistics supply chain simulation system, establishing an adaptive fuzzy double feedback control structure; establishing an adaptive fuzzy double feedback control method comprising one-level fuzzy logic control and two-level adaptive fuzzy logic control, the specific steps comprising: step 4.1, establishing a first first-level fuzzy logic system, setting a deviation e1 between the actual container arrive rate CARATE and the finished container pretreatment requirement FCPR and a deviation change rate ec1 as the inputs of the fisrt first-level fuzzy logic system, further adjusting TFCPR by controlling a change of smoothing coefficient α1, feeding the updated FCPR back to a two-subsystem container logistics supply chain system; step 4.2, establishing a second first-level fuzzy logic system, setting a deviation e2 between the actual container arrive rate CARATE and the unfinished container handling requirement UCHR and a deviation change rate ec2 as the inputs of the second first-level fuzzy logic system, further adjusting TUCHR by controlling the change of smoothing coefficient α2, and feeding the updated UCHR back to the two-subsystem container logistics supply chain system; step 4.3, establishing a second-level adaptive fuzzy logic system; K1
PNG
media_image25.png
21
13
media_image25.png
Greyscale
K2 and K3
PNG
media_image25.png
21
13
media_image25.png
Greyscale
K4 being quantification factors of fuzzy inference inputs of a first second-level fuzzy logic system and a second second-level fuzzy logic system respectively, wherein the error quantification factor and error change rate quantification factor of the first fuzzy logic system being K1, K2 respectively, and the error quantification factor and error change rate quantification factor of the second fuzzy logic system being K3 and K4, respectively; adjusting the quantification factors online through a second-level adaptive fuzzy logic system; when the deviation being large, the main adaptive task being to eliminate the deviation, while when the deviation being small, the supply chain system being close to the steady state and the main adaptive task being to quickly adapt to changes of the external environment; step 4.4, designing the control rules of the first-level fuzzy logic system; for the first first-level fuzzy logic system and the second first-level fuzzy logic system, extracting the deviation e1 and the deviation change rate e1 between the actual container arrive rate CARATE and the finished container pretreatment requirement FCPR at the kth moment of the two-subsystem container logistics supply chain system, as well as the deviation e2 and the deviation change rate ec2 between the actual container arrive rate CARATE at a kth moment and the container port unfinished container handling requirement UCHR, setting e1
PNG
media_image25.png
21
13
media_image25.png
Greyscale
ec1 and e2
PNG
media_image25.png
21
13
media_image25.png
Greyscale
ec2 as the inputs of the first first-level fuzzy logic system and the second first-level fuzzy logic system respectively; defining a fuzzy subsets of the first-level fuzzy logic system as {VS(very small), S(small), RS(relatively small), M(medium), RB(relatively big), B(big), VB(very big)}, and the fuzzy domain as {0, 1}; a membership function of input and output adopting uniformly distributed trigonometric function; according to the input and output requirements, the first-level fuzzy control rules being set as follows:
PNG
media_image28.png
321
551
media_image28.png
Greyscale
wherein e being a deviation and ec being a deviation change rate; when the deviation change rate ec1 and ec2 being relatively large, increasing the smoothing coefficient α2 to alleviate the rapid change of the supply chain system under the influence of adverse events, while when the deviation e1 and e2 being large, reducing the smoothing coefficient α1
PNG
media_image29.png
17
13
media_image29.png
Greyscale
α2 to make the deviation e1 and e2 return to a more ideal state; step 5, designing a control rules of the second-level adaptive fuzzy logic system; setting quantization factors K1, K2, K3 and K4 as control objects; based on an update of smoothing coefficients, further updating a control effect of quantization factors on first-level fuzzy logic system, that is, when the input deviations e1 and e2 of two first-level fuzzy logic systems being large, the main task of adaptive being to increase the error quantization factors K1 and K3 to eliminate the deviation, the input deviation being small and the input deviation change rate ec1 and ec2 being large, the supply chain system being close to the steady state, making the main adaptive task being to increase the error change rate quantization factors K2 and K4 to make the system stable as soon as possible, so as to achieve the purpose of adaptive adjustment by using quantization factors; setting a membership function corresponding to the input of the second-level adaptive fuzzy logic system as uniformly distributed trigonometric functions; setting a fuzzy subset as {NB(negative big), NM(negative middle), NS(negative small), Z(zero), PS(positive small), PM(positive middle), PB(positive big)}; defining a fuzzy subset of the output of adaptive fuzzy logic as {VS(very small), S(small), M(medium), B(big), VB(very big)}, the basic domain being {0, 1}; setting the second-level adaptive fuzzy control rules as:
PNG
media_image30.png
208
544
media_image30.png
Greyscale
PNG
media_image31.png
120
540
media_image31.png
Greyscale
when both the deviation e and the deviation change rate ec being close to zero (Z), the quantization factors K1, K2, K3 and K4 of the two inputs of the control fuzzy system having the same proportion; when the deviation e being close to 0 value and the deviation change rate ec tending to be large or small, the proportion of adjusting e being the smallest and that of ec being the largest; when the deviation rate ec being close to 0 value and the deviation e being large or small, adjusting the proportion of e to the maximum to achieve the purpose of adaptive adjustment.
The claim as a whole recites mathematical concepts and a certain method of organizing human activity. The limitations recited above (of simulation of container logistics supply chain resilience to a resilience-enhanced simulation method of the container logistics supply chain based on adaptive fuzzy double feedback) under broadest reasonable interpretation, recite the abstract idea of mathematical concepts (e.g., mathematical relationships, mathematical formulas or equations, mathematical calculations) and a certain method of organizing human activity (e.g., fundamental economic practices). Therefore, the claim recites an abstract idea.
The mere recitation of additional elements (as interpreted above): a container arrival pretreatment unit, an expected pretreatment time unit, an adjustment time unit, an allocation delay strategy unit; a container handling requirement forecasting unit, a desired delay time unit, a first adjustment time unit, a second adjustment time unit, a container handling delay strategy unit, integral unit, first integral unit, and second integral unit, does not take the claims out of the certain methods of organizing human activity grouping and mathematical concept. Thus, the claim recites an abstract idea.
Step 2A, Prong Two
The judicial exception is not integrated into a practical application. Claims 1 and 9 as a whole: merely recite the words “apply it” (or an equivalent) with the judicial exception, or merely include instructions to implement an abstract idea on a computer, or merely use a computer as a tool to perform an abstract idea.
The claim recites the additional elements (as interpreted above) of: a container arrival pretreatment unit, an expected pretreatment time unit, an adjustment time unit, an allocation delay strategy unit; a container handling requirement forecasting unit, a desired delay time unit, a first adjustment time unit, a second adjustment time unit, a container handling delay strategy unit, integral unit, first integral unit, and second integral unit.
The additional elements listed above are recited at a high-level of generality, such that, when viewed individually and as whole/ordered combination, the additional elements amount to: merely reciting “apply it” (or an equivalent) with the judicial exception, or merely including instructions to implement an abstract idea on a computer, or merely using a computer as a tool to perform an abstract idea, (See MPEP 2106.05(f)).
Accordingly, these additional elements, when viewed individually and as a whole/ordered combination, do not integrate the abstract idea into a practical application because they do not impose any meaningful limits on practicing the abstract idea. Thus, the claim is directed to an abstract idea.
Step 2B
As discussed above with respect to Step 2A Prong Two, the additional elements amount to no more than: merely reciting “apply it” (or an equivalent) with the judicial exception, or merely including instructions to implement an abstract idea on a computer, or merely using a computer as a tool to perform an abstract idea. The same analysis applies here in 2B, i.e., merely reciting “apply it” (or an equivalent) with the judicial exception, or merely including instructions to implement an abstract idea on a computer, or merely using a computer as a tool to perform an abstract idea, does not integrate the abstract idea into a practical application at Step 2A or provide an inventive concept at Step 2B.
Therefore, the additional elements do not integrate the abstract idea into a practical application at Step 2A or provide an inventive concept at Step 2B. Thus, even when viewed individually and as a whole/ordered combination, nothing in the claim adds significantly more (i.e., an inventive concept) to the abstract idea. Thus, the claim is ineligible.
Dependent claim 2 merely recites details that narrow the previously recited abstract idea limitations. For these reasons, as described above with respect to claim 1, these judicial exceptions are not meaningfully integrated into a practical application or significantly more than the abstract idea. Thus, claim 2 is also ineligible.
Allowable Over Prior Art
The claims are allowable over the prior art, but subject to the above objections and rejections under 35 U.S.C. 112 (a), 35 U.S.C. 112 (b), and 35 U.S.C. 101. The prior art fails to teach or suggest claim 1 in its entirety as a whole/ordered combination. The closest prior art includes:
U.S. Patent Application Publication No. 2015/0347941 to Yund et al. (hereinafter “Yund”). Yund discloses determining a pre-optimization validation of a supply chain optimization model. The supply chain optimization model is created using a linear optimization technique when the pre-optimization validation indicates a valid supply chain optimization model where creating comprises executing an optimization algorithm.
U.S. Patent Application Publication No. 2023/0117297 to Butterfoss et al. (hereinafter “Butterfoss”). Butterfoss discloses obtaining supply chain data of a supply chain, generating a supply chain network graph that represents relationships between locations indicated by the supply chain data, determining classifications of the locations indicated by the supply chain data, determining agent rule models based on the supply chain data, and generating a supply chain simulation based on the supply chain network graph, the classifications of the locations, and the agent rule models.
U.S. Patent Application Publication No. 2025/0005611 to Vlasie et al. (hereinafter “Vlasie”). Vlasie discloses receiving a modelled supply chain having one or more finished or semi-finished goods at one or more top levels and, for each of the one or more finished or semi-finished goods, a complementary set of component products at one or more bottom levels, performing, by the processor, a top-down heuristic operation on the modelled supply chain to determine demands at the one or more bottom levels, formulating, by the processor, optimized model for the one or more bottom levels based on the determined demands, and solving, by the processor, the optimized model to generate optimized results.
“Viable supply chain model: integrating agility, resilience and sustainability perspectives—lessons from and thinking beyond the COVID-19 pandemic” by Dmitry Ivanov, dated May 22, 2020 (hereinafter “Ivanov”). Ivanov discloses that viability is considered as an underlying supply chain property spanning three perspectives, i.e., agility, resilience, and sustainability. The principal ideas of the viability supply chain (VSC) model are adaptable structural supply chain designs for supply–demand allocations and, most importantly, establishment and control of adaptive mechanisms for transitions between the structural designs. Ivanoov further discloses the relations between resilience and viability. The VSC model can be of value for decision-makers to design supply chains that can react adaptively to both positive changes (i.e., the agility angle) and be able to absorb negative disturbances, recover and survive during short-term disruptions and longterm, global shocks with societal and economical transformations (i.e., the resilience and sustainability angles). “
Reliable container supply chain under disruption” by Jeong et al., dated November 7, 2022 (hereinafter “Jeong”). Jeong discloses a reliable container network flow model (RCNF). The RCNF model minimizes normal operation costs, including reusing, returning, storage, shortage, and expected transportation costs.
“A quantitative analysis of container vessel arrival planning strategies” by Lang et al., dated December 5, 2009, (hereinafter “Lang”). Lang discloses quantitative arrival scheduling simulation to analyze contrasting arrival planning strategies.
“Is the Global Food Supply Chain during the COVID-19 Pandemic Resilient? A Review Paper” by Nasereldin et al., dated January 8, 2021 (hereinafter “Nasereldin’). Nasereldin discloses the main challenges faced by the resilience of the global food supply chain.
“Integrating sustainability and resilience in the supply chain: A systematic literature review and a research agenda” by Negri et al., dated 2021 (hereinafter “Negri”). Negri discloses the concept of sustainable supply chains is more established, and general agreement on its theoretical foundations exists. Supply chain resilience is relatively less mature. The nexus and relationships between the two topics are often incoherent: there is confusion on sustainable and resilient supply chains establishment; there is no clarity on what practices could jointly advance both areas. A major conflict exists since sustainability generally focuses on efficiency, while resilience seeks effectiveness. We recommend studies to analyze implementation relationships and impact.
“A decision support system for demand forecasting with artificial neural networks and neuro-fuzzy models: A comparative analysis” by Efendigil et al., dated 2009, hereinafter “Efendigil”). Efendigil discloses comparative forecasting methodology regarding to uncertain customer demands in a multi-level supply chain (SC) structure via neural techniques. A forecasting mechanism is modeled by artificial intelligence approaches including the comparison of both artificial neural networks and adaptive network-based fuzzy inference system techniques to manage the fuzzy demand with incomplete information.
Prior Art
The following prior art, made of record and not relied upon, is considered pertinent to Applicant’s disclosure:
“Risk management of supply chain disruptions: An epidemic modeling approach” by Berger et al., dated May 16, 2022 (hereinafter “Berger”). Berger discloses that Quality issues in supply networks can adversely affect the performance of suppliers and their downstream customers. A modeling framework is developed, drawing on epidemiology, to demonstrate how network structure impacts the propagation of quality issues.
Conclusion
Any inquiry concerning this communication or earlier communications from the examiner should be directed to Rupangini Singh whose telephone number is 571-270-0192. The examiner can normally be reached on Monday – Friday, 9:30 AM – 6:30 PM.
Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice.
If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Shannon Campbell can be reached on Monday – Friday at (571) 272-5587. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300.
Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000.
/RUPANGINI SINGH/
Primary Examiner, Art Unit 3628