Prosecution Insights
Last updated: October 25, 2026
Application No. 18/253,660

A nuclear reactor module and a nuclear district heating reactor comprising and method of operating the same

Non-Final OA §103
Filed
May 19, 2023
Priority
Nov 20, 2020 — FI 20206180 +1 more
Examiner
FIX, THOMAS S
Art Unit
3618
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Steady Energy OY
OA Round
3 (Non-Final)
72%
Grant Probability
Favorable
3-4
OA Rounds
0m
Est. Remaining
88%
With Interview

Examiner Intelligence

Grants 72% — above average
72%
Career Allowance Rate
236 granted / 328 resolved
+20.0% vs TC avg
Strong +16% interview lift
Without
With
+16.5%
Interview Lift
resolved cases with interview
Typical timeline
2y 3m
Avg Prosecution
33 currently pending
Career history
368
Total Applications
across all art units

Statute-Specific Performance

§101
1.2%
-38.8% vs TC avg
§103
39.3%
-0.7% vs TC avg
§102
33.2%
-6.8% vs TC avg
§112
24.3%
-15.7% vs TC avg
Black line = Tech Center average estimate • Based on career data from 328 resolved cases

Office Action

§103
DETAILED ACTION The text of those sections of Title 35, U.S. Code not included in this action can be found in a prior Office action. Continued Examination Under 37 CFR 1.114 A request for continued examination under 37 CFR 1.114, including the fee set forth in 37 CFR 1.17(e), was filed in this application after final rejection. Since this application is eligible for continued examination under 37 CFR 1.114, and the fee set forth in 37 CFR 1.17(e) has been timely paid, the finality of the previous Office action has been withdrawn pursuant to 37 CFR 1.114. Applicant's submission filed on 09/08/2026 has been entered. Claim Rejections - 35 USC § 103 Claims 1-7 and 15 are rejected under 35 U.S.C. 103 as being unpatentable over Reyes, JR et al. (US 2009/0129531). The combination is summarized as follows: Reyes discloses various embodiments, including an embodiment described as a dry containment region 44, i.e., between the reactor vessel 52 and the containment vessel 54, that includes gas and/or air (para. 31); an embodiment where there is no release of liquid coolant 100 from the reactor vessel 52 even during an emergency operation (para. 36); and an embodiment described as an emergency state of the system, where coolant 100B is released into the otherwise dry containment region 44 (para. 34) from the reactor vessel 52 via a flow limiter 58 (para. 35), where the coolant 100B provides the benefit of passive decay heat removal (para. 37) via liquid convection and conduction heat transfer from the reactor vessel 52, to the inner surface 55 of the containment vessel 54, to the pool of liquid 16 (para. 36). Plainly, although the prior art explicitly discloses that the containment region 44 is dry (e.g. containing gas or vacuum), the prior art also discloses 1. the system is designed to function with a liquid coolant within region 44, as shown in fig. 3, and that 2. the system is functional even without the flow limiter 58 shown in figs. 2-3 which vents coolant 100B from inside the reactor vessel 52. Therefore, an ordinary practitioner would immediately recognize that the system of the prior art would still function to remove decay heat if the embodiments were combined such that the containment region 44 of figure 2 was filled with the coolant 100B of figure 3, without the shown flow limiter 58. Following from the above discussion, it would have been obvious to one of ordinary skill in the art prior to the time of effective filing to combine the embodiments of Reyes to arrive at the claimed invention, as explicitly mapped below, for the expected benefit of providing passive decay heat removal via liquid convection and conduction heat transfer. Further, even in absence of an express motivation to combine the various embodiments of the prior art, the combination, as mapped below, would have been obvious to an ordinary practitioner since the claimed invention is merely a combination of old elements, and in the combination each element merely would have performed the same function as it did separately, and one of ordinary skill in the art would have recognized that the results of the combination were predictable.1 Regarding the claims, the combined embodiments of the prior art suggests the following: 1. (Currently amended) A nuclear reactor module comprising: a containment vessel (54); a reactor vessel (52) contained in (fig. 2 and/or fig. 3) the containment vessel (54), the reactor vessel (52) comprising a primary circuit with a primary fluid (100A), and a reactor core (6) contained in the reactor vessel (52) and being cooled by the primary fluid (100A), wherein an intermediate volume (44) is formed between the containment vessel (54) and the reactor vessel (52), which intermediate volume (44) is partially filled (fig. 3, as used in the combination, shows coolant 100B within the containment region 44) with an intermediate fluid (100B), which is water (water, para. 36) and which is in direct heat conducting contact with the reactor vessel (54), and wherein the circulation of the primary fluid is permanently separated from the intermediate volume (by para. 36, the embodiment as used in the combination includes no release of liquid coolant 100 from reactor vessel 52 even during an emergency operation). PNG media_image1.png 428 478 media_image1.png Greyscale 2. (Previously presented) The nuclear reactor module according to claim 1, wherein the reactor vessel is configured to prevent all fluid flow between the reactor vessel and the containment vessel (embodiment of para. 36, as combined). 3. (Previously presented) The nuclear reactor module according to claim 1, wherein the reactor vessel is made of steel (steel, para. 26). 4. (Previously presented) The nuclear reactor module according to claim 1, wherein passive removal of decay heat is not reliant on forced circulation of the primary fluid or actuation mechanical components (passive decay heat removal, para. 37). 5. (Previously presented) The nuclear reactor module according to claim 1, wherein the primary fluid (100A, i.e. 100) is water (para. 36). 6. (Currently amended) The nuclear reactor module according to claim 1, wherein the nuclear reactor module comprises a passive decay heat removal system (paras. 36-37) provided by a heat conductive passageway between the reactor core (6) and the asurrounding ambient or heat sink (16), when the intermediate fluid (100B) is brought to its boiling point (conditional limitation which remains true by at least para. 36). 7. (Currently amended) A nuclear district heating reactor comprising a nuclear reactor module, wherein the nuclear reactor module comprises: - a containment vessel; - a reactor vessel contained in the containment vessel, the reactor vessel comprising a primary circuit) with a primary fluid, and - a reactor core contained in the reactor vessel and being cooled by the primary fluid, wherein an intermediate volume is formed between the containment vessel and the reactor vessel, which intermediate volume is partially filled with an intermediate fluid, which is water and which is in direct heat conducting contact with the reactor vessel, and wherein the circulation of the primary fluid is permanently separated from the intermediate volume. 15. (New) The nuclear reactor module according to claim 1, wherein the nuclear reactor module comprises a passive decay heat removal system (paras. 36-37) configured to transfer heat (i.e., via conduction and/or convection) from the primary fluid (100A) to the internediate fluid (100B). Claim 14 is rejected under 35 U.S.C. 103 as being unpatentable over Reyes, JR et al. (US 2009/0129531), in view of Kato et al. (US 5,316,597). Regarding claim 14, Reyes discloses the following: 14. (Previously presented) The nuclear reactor module according to claim 1, wherein the reactor vessel is made of steel (para. 26). Reyes does not disclose austenitic steel. Kato teaches a nuclear reactor vessel made of an austenitic stainless steel (e.g., at least claims 1-2), which provides the expected benefit of higher safety (col. 9, lines 27-52) and/or prolonged lifetime of the equipment (col. 12, lines 12-21). Therefore, it would have been obvious to one of ordinary skill in the art prior to the time of effective filing to use the austenitic steel as taught by Kato for the reactor vessel of Reyes, for the expected advantage of higher safety and/or prolonged lifetime of the equipment. Response to Arguments Applicant’s arguments with respect to the claims have been considered but are moot because the new ground of rejection does not rely on any reference applied in the prior rejection of record for any teaching or matter specifically challenged in the argument. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to T. S. FIX whose telephone number is (571)272-8535. The examiner can normally be reached M-Th 10a-3p. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Minnah Seoh can be reached at 5712707778. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /T. SCOTT FIX/Primary Examiner, Art Unit 3618 1 KSR International Co. v. Teleflex Inc., 82 USPQ2d 1385 (2007)
Read full office action

Prosecution Timeline

May 19, 2023
Application Filed
Oct 23, 2025
Non-Final Rejection mailed — §103
Feb 10, 2026
Response Filed
Jun 05, 2026
Final Rejection mailed — §103
Sep 08, 2026
Request for Continued Examination
Sep 09, 2026
Response after Non-Final Action
Sep 25, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12759849
FLEXIBLE FORM FACTOR BELT DRIVEN BLOCK AND TACKLE
2y 11m to grant Granted Oct 13, 2026
Patent 12752888
FLOATING STRUCTURE
2y 1m to grant Granted Oct 06, 2026
Patent 12747013
CYCLOROTORS
2y 6m to grant Granted Sep 29, 2026
Patent 12742489
DEVICE FOR PRESSING A RACK AGAINST A PINION, STEERING DEVICE HAVING SUCH A DEVICE, AND METHOD FOR PRODUCING SUCH A DEVICE AND/OR STEERING DEVICE
3y 2m to grant Granted Sep 22, 2026
Patent 12741388
COMPLIANCE DEVICE AND WORKING ROBOT INCLUDING THE SAME
2y 9m to grant Granted Sep 22, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
72%
Grant Probability
88%
With Interview (+16.5%)
2y 3m (~0m remaining)
Median Time to Grant
High
PTA Risk
Based on 328 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month