Prosecution Insights
Last updated: May 29, 2026
Application No. 18/284,731

METHOD FOR MEASUREMENT GAP PROCESSING

Final Rejection §103
Filed
Sep 28, 2023
Priority
Apr 01, 2021 — nonprovisional of PCTCN2021085132
Examiner
SALAD, ABDULLAHI ELMI
Art Unit
2466
Tech Center
2400 — Computer Networks
Assignee
BEIJING XIAOMI MOBILE SOFTWARE CO., LTD.
OA Round
2 (Final)
85%
Grant Probability
Favorable
3-4
OA Rounds
5m
Est. Remaining
94%
With Interview

Examiner Intelligence

Grants 85% — above average
85%
Career Allowance Rate
825 granted / 974 resolved
+26.7% vs TC avg
Moderate +10% lift
Without
With
+9.6%
Interview Lift
resolved cases with interview
Typical timeline
3y 1m
Avg Prosecution
18 currently pending
Career history
995
Total Applications
across all art units

Statute-Specific Performance

§101
4.3%
-35.7% vs TC avg
§103
68.4%
+28.4% vs TC avg
§102
15.5%
-24.5% vs TC avg
§112
0.9%
-39.1% vs TC avg
Black line = Tech Center average estimate • Based on career data from 974 resolved cases

Office Action

§103
Response to Amendment Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . The amendment dated 12/23/25 has been received and e of record. Applicant’s arguments with respect to claims 1, 10 and 35 has been fully considered but are moot in view of new ground of rejection. For example, applicant the cited art fails to disclose the newly added claim limitation of “wherein the capability indication information is configured to indicate the configuration of the measurement gap supported by the UE through: a type of the configuration of the measurement gap indicating a type of the measurement gap supported by the UE; wherein the type of the configuration of the measurement gap comprises: the measurement gap supported by the UE being a network control small gap (NCSG) measurement gap”. In response , Examiner asserts newly cited reference Yiu discloses wherein the capability indication information is configured to indicate the configuration of the measurement gap supported by the UE through: a type of the configuration of the measurement gap indicating a type of the measurement gap supported by the UE(see par. 0147-0149, wherein the UE capability information 908 can include one or more fields indicating (e.g., to the gNB 904) that the UE supports indicating per UE NCSG configuration); wherein the type of the configuration of the measurement gap comprises: the measurement gap supported by the UE being a network control small gap (NCSG) measurement gap(see fig. 9 and pars. 0147-0149). Hence, by encoding the capability information that can be configured to indicate that the UE 101 supports per UE network controlled small gap (NCSG) operation. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. Claims 1-17, 35, and 37-38 are rejected under 35 U.S.C. 103 as being unpatentable over Cui et al. U.S. Patent No. 11,558,790 [herein after Cui] in view of Yiu et al. U.S. Patent Application Publication No. 2020/0084677[hereinafter Yiu]. As per claim 1, 10 and 35 Cui disclose a method for measurement gap processing, performed by a base station, comprising: receiving capability indication information reported by a user equipment (UE), wherein the capability indication information indicates a configuration of a measurement gap supported by the UE( see the abstract and col. 8, lines 51-65, col. 13, lines 36-50, where network receives the capability information, that the UE supports multiple measurement gap patterns, where the measurement gap patterns are at least partially in parallel with each other). Cui does not explicitly disclose wherein the capability indication information is configured to indicate the configuration of the measurement gap supported by the UE through: a type of the configuration of the measurement gap indicating a type of the measurement gap supported by the UE; wherein the type of the configuration of the measurement gap comprises: the measurement gap supported by the UE being a network control small gap (NCSG) measurement gap. Yiu discloses wherein the capability indication information is configured to indicate the configuration of the measurement gap supported by the UE through: a type of the configuration of the measurement gap indicating a type of the measurement gap supported by the UE(see par. 0147-0149, wherein the UE capability information 908 can include one or more fields indicating (e.g., to the gNB 904) that the UE supports indicating per UE NCSG configuration); wherein the type of the configuration of the measurement gap comprises: the measurement gap supported by the UE being a network control small gap (NCSG) measurement gap(see fig. 9 and pars. 0147-0149). Therefore, it would have been obvious to one having ordinary skill in the art prior to effective filing date of the claimed invention to incorporate the teachings of Yiu into the system of Cui, thus when capability information (e.g., 908) can be encoded by the UE 101 for transmission within a serving cell of an evolved Node-B (eNB) 111. The capability information that can be configured to indicate that the UE 101 supports per UE network controlled small gap (NCSG) operation. as per claim 2, 11 and 27 Cui discloses the method of claim 1, wherein the capability indication information further indicates the configuration of the measurement gap supported by the UE through as per claim 3, 12, and 38Cui discloses the method of claim 2, wherein the number of configurations of the measurement gap comprises one of: a number of configurations of the measurement gap supported by the UE in one frequency range .(see col. 8, lines 51-65).; and a number of configurations of the measurement gap supported by the UE in multiple frequency ranges.(see col. 8, lines 51-65). As per claim 4, and 14 the method of claim 2, wherein the type of the configuration of the measurement gap comprises at least one of: the measurement gap supported by the UE being a network control small gap (NCSG) measurement gap; the measurement gap supported by the UE being a pre-configured measurement gap; and the measurement gap supported by the UE being a concurrent measurement gap(see col. 13, lines 37-50). as per claim 5, and 15 Cui discloses the method of claim 4, wherein receiving the capability indication information reported by the UE comprises one of: receiving a measurement and mobility parameter information unit (IE MeasAndMobParameters) signaling reported by the UE, wherein the IE MeasAndMobParameters signaling carries the capability indication information(see col. 13, lines 51-64, col; and col. 14, lines 54-65); receiving a measurement and mobility parameter information unit (IE MeasAndMobParametersMRDC) signaling of multiple wireless system dual connectivities reported by the UE, wherein the IE MeasAndMobParametersMRDC signaling carries the capability indication information (see col. 13, lines 51-64, col; and col. 14, lines 54-65). as per claim 6, and 16 Cui discloses the method of claim 5, wherein the capability indication information comprises at least one of: indication information for a NCSG measurement gap capability indication information configured to indicate a configuration where the UE supports an NCSG measurement gap (see col. 13, lines 37-50); indication information for a pre-configured measurement gap capability indication information configured to indicate a configuration where the UE supports the pre-configured measurement gap; and indication information for a concurrent measurement gap capability indication information configured to indicate a configuration where the UE supports the concurrent measurement gap (see col. 13, lines 51-64, col; and col. 14, lines 54-65) as per claim 7 and 17 Cui discloses the method of claim 6, wherein the indication information for the concurrent measurement gap capability indication information is configured to indicate at least one of: a number of configurations of the concurrent measurement gap supported by the UE in one frequency range; and a number of configurations of the concurrent measurement gap supported by the UE in each frequency range of multiple frequency ranges.(see col. 8, lines 51-65). as per claim 8 Cui discloses the method of claim 7, further comprising: determining a measurement gap configuration based on a configuration where the UE supports the measurement gap determined based on the capability indication information (see col. 13, lines 51-64, col; and col. 14, lines 54-65) as per claim 9 Cui discloses the method of claim 8, wherein determining the measurement gap configuration based on the configuration where the UE supports the measurement gap determined based on the capability indication information comprises one of: determining the measurement gap configuration where the UE supports the NCSG measurement gap based on the configuration where the UE supports the NCSG measurement gap determined based on the capability indication information(see col. 13, lines 51-64, col; and col. 14, lines 54-65); determining the measurement gap configuration where the UE supports the pre-configured measurement gap based on the configuration where the UE supports the pre-configured measurement gap determined based on the capability indication information(see col. 13, lines 51-64, col; and col. 14, lines 54-65); and determining the measurement gap configuration where the UE supports the concurrent measurement gap based on the configuration where the UE supports the concurrent measurement gap determined based on the capability indication information. (see col. 13, lines 51-64, col; and col. 14, lines 54-65). Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to ABDULLAHI ELMI SALAD whose telephone number is (571)272-4009. The examiner can normally be reached 9:30AM-6:PM. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Faruk Hamza can be reached at 571-272-7969. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /ABDULLAHI E SALAD/Primary Examiner, Art Unit 2466
Read full office action

Prosecution Timeline

Sep 28, 2023
Application Filed
Sep 24, 2025
Non-Final Rejection mailed — §103
Dec 23, 2025
Response Filed
Apr 03, 2026
Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12641036
MANAGING CLOSED CONTROL LOOPS
2y 7m to grant Granted May 26, 2026
Patent 12634946
TRANSMISSION POWER CONTROL VIA SERVING AND NON-SERVING CELLS
4y 0m to grant Granted May 19, 2026
Patent 12634777
SECONDARY CELL GROUP ACTIVATION STATE CONFIGURATION IN MULTIPLE SECONDARY CELL GROUP CONFIGURATIONS
3y 11m to grant Granted May 19, 2026
Patent 12634981
RESOURCE ALLOCATION FOR LOW-LATENCY TRANSMISSION
3y 7m to grant Granted May 19, 2026
Patent 12634718
Wireless Resource Utilization Rate Determination Method and Apparatus, Electronic Device and Storage Medium
2y 3m to grant Granted May 19, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
85%
Grant Probability
94%
With Interview (+9.6%)
3y 1m (~5m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 974 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month