Prosecution Insights
Last updated: October 25, 2026
Application No. 18/299,381

METHOD, APPARATUS AND STORAGE MEDIUM FOR ADJUSTING SUBSERVICES OF A TARGET APPLICATION

Final Rejection §103
Filed
Apr 12, 2023
Priority
Feb 05, 2021 — CN 2021 10562863.8 +1 more
Examiner
MITCHELL, JASON D
Art Unit
2199
Tech Center
2100 — Computer Architecture & Software
Assignee
Tencent Cloud Computing (Beijing) Co. Ltd.
OA Round
4 (Final)
56%
Grant Probability
Moderate
5-6
OA Rounds
9m
Est. Remaining
88%
With Interview

Examiner Intelligence

Grants 56% of resolved cases
56%
Career Allowance Rate
359 granted / 645 resolved
+0.7% vs TC avg
Strong +32% interview lift
Without
With
+31.8%
Interview Lift
resolved cases with interview
Typical timeline
4y 3m
Avg Prosecution
12 currently pending
Career history
668
Total Applications
across all art units

Statute-Specific Performance

§101
10.5%
-29.5% vs TC avg
§103
52.0%
+12.0% vs TC avg
§102
13.1%
-26.9% vs TC avg
§112
20.0%
-20.0% vs TC avg
Black line = Tech Center average estimate • Based on career data from 645 resolved cases

Office Action

§103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Response to Arguments Drawings The applicant’s amendments are sufficient to overcome the previous objection which is consequently withdrawn. Rejections under 35 U.S.C. §103 Applicant’s arguments have been considered but are moot because the new ground of rejection does not rely on any reference applied in the prior rejection of record for any teaching or matter specifically challenged in the argument. Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. Claim(s) 1-20 is/are rejected under 35 U.S.C. 103 as being unpatentable over US 2021/0064360 to Moser (Moser) in view of US 9,766,874 to Rork et al. (Rork) in view of US 2023/0259347 to Von Der Heiden (Von Der Heiden). Claims 1, 9 and 17: Moser discloses a data processing method for an application, performed by a computer device, comprising: obtaining a software installation package of a target application based on an adjustment instruction (par. [0050] “a request for configuration information”, par. [0041] “a set of database tables with each property of the CP”), the target application comprising N subservices, the software installation package comprising N database file sets in a one-to-one correspondence with the N subservices, the N database file sets being in a one-to-one correspondence with the N subservices, and N being a positive integer (see e.g. Fig. 1A); adjusting, according to P database file sets of the N database file sets, P subservices of the N subservices to a version indicated by a target version identifier to obtain information of P adjusted subservices, P being a positive integer less than or equal to N (par. [0051] “when an update [to] the configuration object 320 is performed … provide the update to the configuration object 320”), the adjusting comprising: determining P to-be-adjusted subservices of the N subservices according to a filtering rule that specifies that a subservice having an identifier that is less than the target version identifier is to be adjusted (par. [0036] “The lookup table 200 … includes a name of the object 206 and an activation time 208 … know which version is active by reading activation from times of all versions … a first version ends and a next version begins”, note e.g. the first two rows of Fig. 2B); and storing the information of the P adjusted subservices in a database to obtain an adjusted target application (par. [0051] “provide the update to the configuration object 320 locally stored on the application 310”). Moser does not disclose: an adjustment instruction carrying a target version identifier for the target application. Rork teaches: an adjustment instruction carrying a target version identifier for the target application (col. 11, lines 46-47 “retrieves a next incremental software update”). It would have been obvious at the time of filing to include a target version identifier in an adjustment instruction. Those of ordinary skill in the art would have been motivated to do so as a known means of initiating an update which would have produced only the expected results. Moser and Rork do not teach: file sets being obtained from N images by creating a plurality of containers form the N images, extracting the N database file sets through the plurality of containers, and deleting the plurality of containers after extracting the N database file sets. Van Der Heiden teaches: file sets obtained from N images by creating a plurality of containers (par. [0069] “create … the plurality of second containers 202-1 to 202-n”), extracting the file sets through the plurality of containers (par. [0073] “receive the product configuration information 216”), and deleting the plurality of containers (par. [0014] “the containers may be … deleted upon completion of their respective tasks”). It would have been obvious at the time of filing to obtain the database file sets by creating, and subsequently deleting, a plurality of containers. Those of ordinary skill in the art would have been motivated to do so, e.g., to “reduce a size of the footprint needed at the target device” (Von Der Heiden par. [0014]). Claim 2, 10 and 18: Moser, Rork and Von Der Heiden teach claims 1, 9 and 17, wherein the adjusting further comprises: determining an adapter matching a database file set corresponding to a target subservice according to a type of a database file in the database file set corresponding to the target subservice, the target subservice being any subservice in the P to-be-adjusted subservices (Moser par. [0049] “database tables are created based on the model 326 … a service 324 which may create, read, update, and delete the data stored based on the model”, par. [0050] “a version of the configuration object”, also see par. [0037]); adjusting the target subservice by using the adapter matching the database file set corresponding to the target subservice to obtain information of the adjusted target subservice (Moser par. [0049] “database tables are created based on the model 326”); and repeating the determining the adapter, and the adjusting the target subservice to adjust the P subservices in the N subservices to the version indicated by the target version identifier (Moser par. [0051] “provide the update to the configuration object 320 locally stored on the application 310”, it would at least have been obvious to repeat the process for multiple of the services). Claims 3, 11 and 19: Moser, Rork and Von Der Heiden teach claims 2, 10 and 18, wherein each of the N images comprises at least one database file, and each of the at least one database file carries an identifier of a corresponding database (par. [0049] “the version information of the configuration object 320”); and the adjusting the target subservice comprises: determining a version identifier interval according to a current version identifier of the target subservice and the target version identifier (e.g. Rork col. 11, lines 29-33 “identify the version of the configuration file … set a desired software version”, col. 11, lines 34-40 “determine whether the version of the configuration file is greater than the installed version”); and calling the adapter matching the database file set corresponding to the target subservice, and executing at least one database file in the database file set corresponding to the target subservice to obtain the information of the adjusted target subservice (Moser par. [0051] “provide the update to the configuration object 320 locally stored on the application 310”), [and] a version identifier of the at least one database file belonging to the version identifier interval (Moser par. [0049] “version information … stored int the lookup table 314”). Claims 4, 12 and 20: Moser, Rork and Von Der Heiden teach claims 3, 11 and 19, wherein the database file set corresponding to the target subservice comprises a plurality of database files belonging to the version identifier interval (Moser par. [0049] “version information of the configuration object 320”, Rork col. 11, lines 46-47 “retrieves a next incremental software update”, also see col. 9, line 41-59); and the calling comprises: calling the adapter matching the database file set corresponding to the target subservice, and sequentially executing to-be-executed database files in a target order, to obtain the information of the adjusted target subservice (Moser par. [0051] “when an update [to] the configuration object 320 is performed … provide the update to the configuration object 320”, Rork col. 11, lines 46-47 “a next incremental software update”); the to-be-executed database files comprising database files belonging to the version identifier interval in the database file set corresponding to the target subservice (Moser par. [0051] “provide the update to the configuration object 320 locally stored on the application 310”, Rork col. 11, line 53 “installs the software update”); and the target order being determined according to an adjustment policy of the target subservice, and the adjustment policy of the target subservice being determined according to the current version identifier of the target subservice and the target version identifier (Rork col. 11, lines 46-47 “retrieves a next incremental software update”). Claims 5 and 13: Moser, Rork and Von Der Heiden teach claims 4 and 12, wherein the identifier of each database file of the plurality of database files carries an adjustment type field (e.g. Moser par. [0053] “version field 401”; and the data processing method further comprises: determining the adjustment policy according to the current version identifier of the target subservice and the target version identifier (Moser par. [0057] “identifying a currently active version of the configuration object”); and sifting out the to-be-executed database file from the database file set corresponding to the target subservice according to the adjustment policy, the adjustment type field of the to-be-executed database file matching the adjustment policy (Rork col. 9, line 41-col. 10, line 51). Claims 6 and 14: Moser, Rork and Von Der Heiden teach claims 1 and 9, wherein information of each of the P subservices carries a current version identifier (Moser par. [0055] “reading version information of a configuration object”); and the data processing method further comprises: based on successful adjustment of the P subservices, replacing each of current version identifiers of the P subservices with the target version identifier (Moser par. [0049] “version information … stored in the lookup table 314”). Claims 7 and 15: Moser, Rork and Von Der Heiden teach claims 1 and 9, further comprising one of: obtaining a target image corresponding to a target subservice in the N subservices (Von Der Heiden par. [0068] “receive a plurality of images 206-1 to 206-m”); creating a target container based on the target image (Von Der Heiden par. [0069] “create … a plurality of second containers 202-1 to 202-n”), and extracting a database file from the target image through the target container to obtain a database file set of the target subservice (Moser par. [0041] “a set of database tables with each property of the CP”, Von Der Heiden par. [0071] “receive, at the plurality of second containers … configuration information 212”), the database file set of the target subservice comprising: database files of different versions under the target subservice (Rork Fig. 4A-B), the database file in the database file set of the target subservice being named according to a version identifier to which the database file belongs (Moser par. [0049] “version information”); and generating the software installation package of the target application according to the database file set of the target subservice (Moser par. [0051] “when an update [to] the configuration object 320 is performed … provide the update to the configuration object 320”); and receiving the software installation package from a target computer device (Moser par. [0049] “the lookup table 314 of the application”); the target computer device being configured to obtain the target image corresponding to the target subservice in the N subservices (Von Der Heiden par. [0071] “receive, at the plurality of second containers … configuration information 212”); creating the target container based on the target image (Klob par. [0066] “all applications/services are created as docker containers”), and extracting the database file from the target image through the target container, to obtain the database file set of the target subservice (Moser par. [0041] “a set of database tables with each property of the CP”, Von Der Heiden par. [0070] “execute the generate functions 214”), the database file set of the target subservice comprising: the database files of different versions under the target subservice, the database file in the database file set of the target subservice being named according to the version identifier to which the database file belongs (Rork Fig. 4A-B, Moser col. [0036] “a name of the object 206”); and generating the software installation package of the target application according to the database file set of the target subservice (Moser par. [0051] “when an update [to] the configuration object 320 is performed … provide the update to the configuration object 320”). Claims 8 and 16: Moser, Rork and Von Der Heiden teach claims 7 and 15, wherein the N subservices belong to M service types, M is a positive integer less than or equal to N (Moser par. [0026] “the different services 111-118 perform different/unique functions”); and the software installation package of the target application is obtained by classifying and packaging the N database file sets according to the M service types (Moser par. [0049] “database tables are created based on the model 326”). Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to JASON D MITCHELL whose telephone number is (571)272-3728. The examiner can normally be reached Monday through Thursday 7:00am - 4:30pm and alternate Fridays 7:00am 3:30pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Lewis Bullock can be reached at (571)272-3759. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /Jason D Mitchell/ Primary Examiner, Art Unit 2199
Read full office action

Prosecution Timeline

Show 6 earlier events
Mar 09, 2026
Response after Non-Final Action
May 11, 2026
Request for Continued Examination
May 15, 2026
Response after Non-Final Action
May 21, 2026
Non-Final Rejection mailed — §103
Jul 21, 2026
Applicant Interview (Telephonic)
Jul 21, 2026
Examiner Interview Summary
Aug 19, 2026
Response Filed
Oct 09, 2026
Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12769519
GENERATING CROSS-PLATFORM APPLICATIONS
2y 8m to grant Granted Oct 20, 2026
Patent 12748987
SYSTEMS AND METHODS FOR RULE-BASED MACHINE LEARNING MODEL PROMOTION
4y 7m to grant Granted Sep 29, 2026
Patent 12748586
ORCHESTRATION OF SOFTWARE RELEASES ON A CLOUD PLATFORM ACROSS STAGGER GROUPS
3y 5m to grant Granted Sep 29, 2026
Patent 12748575
METHOD AND SYSTEM FOR PROVIDING AN AUTOMATED APPLICATION GENERATOR
3y 2m to grant Granted Sep 29, 2026
Patent 12730613
APPLICATION PROGRAM DEVELOPMENT ENVIRONMENT FOR DATA SERIALIZATION AND DESERIALIZATION
3y 2m to grant Granted Sep 08, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

5-6
Expected OA Rounds
56%
Grant Probability
88%
With Interview (+31.8%)
4y 3m (~9m remaining)
Median Time to Grant
High
PTA Risk
Based on 645 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month