Prosecution Insights
Last updated: October 25, 2026
Application No. 18/331,984

METHODS AND ASSEMBLIES FOR ELECTRICALLY GROUNDING AND CORROSION-PROTECTING A METALLIC STRUCTURE

Non-Final OA §103
Filed
Jun 09, 2023
Priority
Dec 18, 2019 — provisional 62/949,489 +2 more
Examiner
ANDRISH, SEAN D
Art Unit
3678
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Shore Acres Enterprises Inc.
OA Round
5 (Non-Final)
72%
Grant Probability
Favorable
5-6
OA Rounds
0m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 72% — above average
72%
Career Allowance Rate
816 granted / 1142 resolved
+19.5% vs TC avg
Strong +32% interview lift
Without
With
+32.2%
Interview Lift
resolved cases with interview
Typical timeline
2y 3m
Avg Prosecution
39 currently pending
Career history
1190
Total Applications
across all art units

Statute-Specific Performance

§101
1.0%
-39.0% vs TC avg
§103
42.1%
+2.1% vs TC avg
§102
17.8%
-22.2% vs TC avg
§112
34.3%
-5.7% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1142 resolved cases

Office Action

§103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . DETAILED ACTION Continued Examination Under 37 CFR 1.114 A request for continued examination under 37 CFR 1.114, including the fee set forth in 37 CFR 1.17(e), was filed in this application after final rejection. Since this application is eligible for continued examination under 37 CFR 1.114, and the fee set forth in 37 CFR 1.17(e) has been timely paid, the finality of the previous Office action has been withdrawn pursuant to 37 CFR 1.114. Applicant's submission filed on 23 July 2026 has been entered. Information Disclosure Statement The information disclosure statement (IDS) submitted on 23 July 2026 was filed in compliance with the provisions of 37 CFR 1.97. Accordingly, the information disclosure statement is being considered by the examiner. Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claims 1 and 24 - 26 are rejected under 35 U.S.C. 103 as being unpatentable over Arakawa (JP 09119141) in view of Sirola et al. (US 2016/0163419; hereinafter Sirola '419), Pye et al. (US 6,503,318), and Feng et al. (CN 107310022). Regarding claims 1 and 26, Arakawa discloses an electrically grounded and corrosion-protected assembly, comprising: a structure comprising a utility pole (electric utility pole 3) having a bottom portion that is buried in the earth; a water impermeable cementitious surround (cement 4) applied to at least a section of the portion that is buried in the earth (ground 1), wherein the cementitious surround is in cured state and is in direct contact with the section and is between the section and the earth (Figs. 2 and 4; abstract; paragraph 0008). Arakawa fails to explicitly disclose the structure is metallic; the utility pole comprises a metallic body and a polymeric jacket applied directly to the metallic body, and the polymeric jacket is electrically conductive and water impermeable; the cementitious surround is electrically conductive and has an electrical resistivity of less than or equal to 10,000 ohm cm; and a brace embedded in the cementitious surround and supporting the metallic structure, wherein the brace is non-electrically conductive and non-water permeable and comprises a gravel. Sirola '419 teaches a metallic telephone pole (electrical power transmission tower comprising a steel pylon 300), wherein the utility pole (300) comprises a metallic body (metallic conductor 302) and a polymeric jacket (water impermeable conductive membrane 304 comprising a polymeric material) applied directly to the metallic body, and the polymeric jacket is electrically conductive and water impermeable (Fig. 3B; paragraphs 0023, 0025, 0031, 0032, and 0034). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the pole as disclosed by Arakawa with the metallic material as taught by Sirola '419 as a design consideration within the skill of the art. The selection of a known material based upon its suitability for the intended use is a design consideration within the skill of the art. In re Leshin, 227 F.2d 197, 125 USPQ 416 (CCPA 1960). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the apparatus as disclosed above with the utility pole comprises a metallic body and a polymeric jacket applied directly to the metallic body, and the polymeric jacket is electrically conductive and water impermeable as taught by Sirola '419 to reduce the rate of corrosion of the utility pole. Sirola '419 fails to teach the cementitious surround is electrically conductive and has an electrical resistivity of less than or equal to 10,000 ohm cm; and a brace embedded in the surround and supporting the metallic structure, wherein the brace is non-electrically conductive and non-water impermeable and comprises a gravel. Pye teaches an electrically conductive cementitious material has an electrical resistivity of less than or equal to 10,000 ohm cm (conductive concrete is considered to be concrete having a resistivity of less than about 500 ohm cm; col. 6, lines 60 - 63); and the conductive concrete includes Portland cement and a brace (gravel; col. 7, lines 3 - 14) embedded in the cementitious material, wherein the brace is non-electrically conductive and non water impermeable and comprises a gravel (col. 7, lines 8 - 14) to provide a cementitious material for use in commercial applications, wherein the material conducts energy efficiently into the earth quickly to provide cathodic protection for metallic structures. Arakawa is silent regarding the electrical resistivity of the cementitious material. It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the cementitious material as disclosed by Arakawa with the electrically-conductive cementitious material having an electrical resistivity of less than or equal to 10,000 ohm cm and a brace comprising a gravel as taught by Pye to provide a cementitious material for use in commercial applications, wherein the material conducts energy efficiently into the earth quickly to provide cathodic protection for metallic structures. Pye fails to teach a brace supporting the metallic structure. Feng teaches a brace (gravel) embedded in the surround (cement) and supporting the pole (foundation pile 1), wherein the brace is non-electrically conductive and non-water impermeable and comprises a gravel (Figs. 2 - 4; abstract; pages 1, 2, and 4 of the previously submitted translation of the description) to provide lateral support for the foundation pile. It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the cement as disclosed by above with the brace comprising gravel that is embedded in the surround as taught by Feng (gravel mixed with cement to form concrete) to provide lateral support for the metallic structure. Feng was only relied upon to teach a brace comprising gravel embedded in cementitious material can be used to support a support pole. Regarding claim 24, Arakawa fails to disclose the polymeric jacket comprises a polymeric matrix and a particulate carbonaceous material dispersed in the polymeric matrix. Sirola '419 teaches the polymeric jacket comprises a polymeric matrix (elastomeric polymers) and a particulate carbonaceous material dispersed in the polymeric matrix (paragraph 0029). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the pole as disclosed by Arakawa with the jacket as taught by Sirola '419 to provide the jacket with desired performance characteristics, such as electrical resistivity and tensile strength. Regarding claim 25, Arakawa fails to disclose a polymeric jacket comprises an epoxy matrix and a particulate carbonaceous material dispersed in the epoxy matrix. Sirola ‘419 teaches a polymeric jacket comprises an epoxy matrix and a particulate carbonaceous material dispersed in the epoxy matrix (paragraphs 0029 and 0049). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the pole as disclosed by Arakawa with the jacket as taught by Sirola '419 to provide the jacket with desired performance characteristics, such as electrical resistivity and tensile strength. Claims 7 - 11 are rejected under 35 U.S.C. 103 as being unpatentable over Arakawa in view of Sirola '419, Pye et al., and Feng et al. as applied to claim 1 above, and further in view of Sirola et al. (US 2005/0194576; hereinafter Sirola '576). Regarding claims 7 - 9, Arakawa in view of Sirola '419, Pye, and Feng discloses all of the claim limitation(s) except the cementitious surround comprises a cementitious matrix comprising Portland cement and a particulate carbonaceous material comprising calcined petroleum coke dispersed in the cementitious matrix. Sirola '576 teaches the cementitious surround comprises a cementitious matrix comprising Portland cement and a particulate carbonaceous material comprising calcined petroleum coke dispersed in the Portland cement (paragraph 0044 and 0056). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the surround as disclosed above with the cementitious matrix comprising Portland cement and the particulate carbonaceous material comprising calcined petroleum coke as taught by Sirola '576 to provide the surround with desired properties, such as a particular viscosity. Regarding claim 10, Arakawa in view of Sirola '419, Pye, and Feng discloses all of the claim limitation(s) except the cementitious surround comprises between 5 wt% and 70 wt% Portland cement, and between 30 wt% and 90 wt% calcined petroleum coke. Sirola '576 teaches the cementitious surround comprises between 5 wt% and 70 wt% Portland cement (50%; paragraph 0056), and between 30 wt% and 90 wt% calcined petroleum coke (45% - 55%) (paragraphs 0044 and 0056). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the surround as disclosed above with the cementitious surround comprising between 5 wt% and 70 wt% Portland cement and between 30 wt% and 90 wt% calcined petroleum coke as taught by Sirola '576 to provide the surround with desired properties, such as a particular viscosity. Regarding claim 11, Arakawa in view of Sirola '419, Pye, and Feng discloses all of the claim limitations except the cementitious surround comprises up to 50% slag. Sirola '576 teaches a cementitious surround (carbonaceous concrete conductive sheathing) comprising up to 50% Portland cement (paragraphs 0044 and 0056) and the cementitious surround can be composed of Portland cement or slag (abstract; paragraphs 0011 and 0044). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the cementitious binder as disclosed above with the slag as taught by Sirola '576 as a design consideration within the skill of the art. The substitution of one known element (cementitious binder comprising Portland cement) for another (cement binder) would have yielded predictable results to one of ordinary skill in the art prior to the effective filing date of the invention. KSR International Co. V. Teleflex Inc., 550 U.S. 82 USPQ2d 1385 (2007). Examiner takes the position that it would have been obvious to have substituted 50% slag for 50% Portland cement to maintain the same relative proportions of carbon material and cementitious material in the slurry. Claims 12, 13, and 20 are rejected under 35 U.S.C. 103 as being unpatentable over Arakawa in view of Sirola '419, Sun et al. (US 2018/0002885), Slagle (US 3340929), and Pye et al. Regarding claims 12 and 20, Arakawa discloses a method for electrically grounding and corrosion-protecting a metallic structure that has been lowered into a hole in the earth, comprising: a bottom portion of the structure that has been lowered into a hole in the earth (1), wherein a gap is between the bottom portion and the earth; applying a cementitious slurry (cement 4) to the gap between the bottom portion and the earth; and curing the cementitious slurry to form a water impermeable cementitious surround on the bottom portion (Figs. 2 and 4; abstract; paragraph 0008). Arakawa fails to disclose the structure is metallic; the utility pole comprises a metallic body and a polymeric jacket applied directly to the metallic body, and the polymeric jacket is electrically conductive and water impermeable; at least partially filling a gap with a non-electrically-conductive and non-water-impermeable gravel to form a brace around a bottom portion of a metallic structure that has been lowered into a hole in the earth, and wherein the brace is positioned around the metallic structure to support the metallic structure; combining a cementitious powder with water to form a cementitious slurry, wherein the cementitious slurry comprises a cementitious matrix and a particulate carbonaceous material dispersed in the matrix, and wherein the cementitious powder is combined with water in a ratio of between 4 US gallons of water and 5 US gallons of water per 55 lb of cementitious powder; and enveloping the brace in the cementitious slurry by applying the cementitious slurry to the gravel and flowing the cementitious slurry through the gravel to fill spaces in the gravel; and curing the cementitious slurry with the brace embedded therein such that the cementitious surround encapsulates the polymeric jacket, wherein the cementitious surround is electrically conductive. Sirola '419 teaches a metallic telephone pole (electrical power transmission tower comprising a steel pylon 300), wherein the utility pole (300) comprises a metallic body (metallic conductor 302) and a polymeric jacket (water impermeable conductive membrane 304 comprising a polymeric material) applied directly to the metallic body, and the polymeric jacket is electrically conductive and water impermeable (Fig. 3B; paragraphs 0023, 0025, 0031, 0032, and 0034). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the pole as disclosed by Arakawa with the metallic material as taught by Sirola '419 as a design consideration within the skill of the art. The selection of a known material based upon its suitability for the intended use is a design consideration within the skill of the art. In re Leshin, 227 F.2d 197, 125 USPQ 416 (CCPA 1960). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the apparatus as disclosed above with the utility pole comprises a metallic body and a polymeric jacket applied directly to the metallic body, and the polymeric jacket is electrically conductive and water impermeable as taught by Sirola '419 to reduce the rate of corrosion of the utility pole. Sirola '419 fails to teach at least partially filling a gap with a non- electrically- conductive and non-water-impermeable gravel to form a brace around a bottom portion of a metallic structure that has been lowered into a hole in the earth, and wherein the brace is positioned around the metallic structure to support the metallic structure; combining a cementitious powder with water to form a cementitious slurry, wherein the cementitious slurry comprises a cementitious matrix and a particulate carbonaceous material dispersed in the matrix, and wherein the cementitious powder is combined with water in a ratio of between 4 US gallons of water and 5 US gallons of water per 55 lb of cementitious powder; and enveloping the brace in a cementitious slurry by applying the cementitious slurry to the gravel and flowing the cementitious slurry through the gravel to fill spaces in the gravel, wherein the cementitious slurry comprises a cementitious matrix and a particulate carbonaceous material dispersed in the matrix; and curing the cementitious slurry with the brace embedded therein such that the cementitious surround encapsulates the polymeric jacket, wherein the cementitious surround is electrically conductive. Sun teaches at least partially filling a gap with a non-electrically-conductive and non-water-permeable gravel (gravel layer 9) to form a brace in a gap around a bottom portion of a structure (anchor rod 101) that has been lowered into a hole (drill hole 7) in the earth, and wherein the brace (9) is positioned around the structure to support the structure; and enveloping the brace (9) in a cementitious slurry (mortar anchorage body 8) by applying the cementitious slurry to the gravel and flowing the cementitious slurry through the gravel to fill spaces in the gravel, wherein the cementitious slurry comprises a cementitious matrix and a particulate carbonaceous material dispersed in the matrix (paragraph 0027); and curing the cementitious slurry with the brace embedded therein (paragraph 0027) (Fig. 2; paragraphs 0021 - 0027). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the method as disclosed above with the steps of at least partially filling a gap with a non-electrically-conductive and non-water- permeable gravel to form a brace in a gap around a bottom portion of a structure and enveloping the brace in a cementitious slurry as taught by Sun to improve the structural strength of the cementitious material and provide additional lateral support for the metallic structure. Examiner takes the position that the flowable cementitious slurry as taught by Arakawa is composed of water mixed with sand and since sand is smaller than gravel at least a small amount of the flowable cementitious slurry would obviously flow through the voids within the gravel. Sun fails to teach the cementitious powder is combined with water in a ratio of between 4 US gallons of water and 5 US gallons of water per 55 lb of cementitious powder; and the cementitious surround encapsulates the polymeric jacket, wherein the cementitious surround is electrically conductive. Slagle teaches the cementitious powder is combined with water in a ratio of between 4 US gallons of water and 5 US gallons of water (claimed range is between 4:55 = 0.07 gal/lb and 0.09 gal/lb; Slagle teaches between 0.03 gal/lb and 0.08 gal/lb) (see col. 5, lines 29 - 30 of Slagle teaches a water cement ratio of between 0.03 and 0.08) to improve the bonding strength between a pipe and the cement. It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the cementitious slurry with the ratio of gallons of water to pounds of cement as taught by Slagle to improve the bonding strength between the metallic structure and the cement. Slagle fails to teach such the cementitious surround encapsulates the polymeric jacket, wherein the cementitious surround is electrically conductive. Examiner takes the position that since Sirola '419 teaches a metallic body and a polymeric jacket applied directly thereto and Sun teaches at least partially filling a gap with a non-electrically-conductive and non-water-permeable gravel to form a brace in a gap around a bottom portion of a structure that has been lowered into a hole in the earth, the apparatus as disclosed above would obviously result in the cementitious surround encapsulating the metallic body and the jacket that is directly attached to the metallic body. Slagle fails to teach the cementitious surround is electrically conductive. Pye teaches an electrically conductive cementitious material (a cementitious material including carbon fiber to make the cementitious material conductive; col. 2, lines 47 - 63; col. 4, lines 25 - 28); and the conductive concrete includes Portland cement and a brace (gravel; col. 7, lines 3 - 14) embedded in the cementitious material, wherein the brace is non-electrically conductive and non water impermeable and comprises a gravel (col. 7, lines 8 - 14) to provide a cementitious material for use in commercial applications, wherein the material conducts energy efficiently into the earth quickly to provide cathodic protection for metallic structures. It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the cementitious material as disclosed above with the electrically-conductive cementitious material including carbon fiber as taught by Pye to provide a cementitious material for use in commercial applications, wherein the material conducts energy efficiently into the earth quickly to provide cathodic protection for metallic structures. Given the apparatus as disclosed above, the method of claim 20 would have been considered obvious to one of ordinary skill in the art. Regarding claim 13, Arakawa discloses all of the claim limitation(s) except filling the gap with the gravel. Sun teaches filling the gap with the gravel (paragraphs 0022 and 0025). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the method as disclosed above with the step of filling the gap with the gravel as taught by Sun to improve the structural strength of the cementitious material and provide additional lateral support for the metallic structure. Claim 15 is rejected under 35 U.S.C. 103 as being unpatentable over Arakawa in view of Sirola '419, Sun et al., Slagle, and Pye et al. as applied to claim 12 above, and further in view of White et al. (US 6,142,712). Arakawa in view of Sirola '419, Sun, Slagle, and Pye discloses all of the claim limitation(s) except step a. further comprises compacting the gravel. White teaches compacting gravel (19) to support a post (Fig. 2; col. 3, lines 34 - 39). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the method as disclosed above with the step of compacting the gravel as taught by White to improve the structural strength of the brace in which the metallic structure is supported. Claim 18 is rejected under 35 U.S.C. 103 as being unpatentable over Arakawa in view of Sirola '419, Sun et al., Slagle, and Pye et al. as applied to claim 12 above, and further in view of Sirola '576. Arakawa in view of Sirola '419, Sun, Slagle, and Pye discloses all of the claim limitation(s) except the cementitious surround comprises between 5 wt% and 70 wt% Portland cement, and between 30 wt% and 90 wt% calcined petroleum coke. Sirola '576 teaches the cementitious surround comprises between 5 wt% and 70 wt% Portland cement (50%; paragraph 0056), and between 30 wt% and 90 wt% calcined petroleum coke (45% - 55%) (paragraphs 0044 and 0056). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the surround as disclosed above with the cementitious surround comprising between 5 wt% and 70 wt% Portland cement and between 30 wt% and 90 wt% calcined petroleum coke as taught by Sirola '576 to provide the surround with desired properties, such as a particular viscosity. Claim 19 is rejected under 35 U.S.C. 103 as being unpatentable over Arakawa in view of Sirola '419, Sun et al., Slagle, and Pye et al. as applied to claim 12 above, and further in view of Li et al. (CN 112145180). Arakawa in view of Sirola '419, Sun, Slagle, and Pye discloses all of the claim limitation(s) except there is a delay of at least one day between steps a. and b. Li teaches allowing at least one day (120 - 240 hours) for gravel to dry and settle naturally (abstract). It would have been considered obvious to one of ordinary skill in the art, prior to the effective filing date of the invention, to have modified the method as disclosed above with the step of including a delay of at least one day as taught by Li between steps a. and b. to allow the gravel to settle naturally, thereby increasing the amount of structural support the brace provides for the metallic structure. Response to Arguments Applicant’s arguments with respect to claims 1, 7 - 13, 15, 18 - 20, 24, and 25 have been considered but are moot in view of new grounds of rejection. Applicant's arguments filed 23 July 2026 have been fully considered but they are not persuasive. Applicant argues that Pye (US 6,503,318) teaches conventional concrete is a good electrical insulator (col. 1, lines 13 - 15), not an electrical conductor. Examiner replies that the passage cited by Applicant describes a conventional concrete. Examiner notes that Pye teaches including carbon fiber in the cementitious material to produce an electrically-conductive cementitious material (col. 2, lines 47 - 63; col. 4, lines 25 - 28) to provide a cementitious material for use in commercial applications, wherein the material conducts energy efficiently into the earth quickly to provide cathodic protection for metallic structures. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to SEAN D ANDRISH whose telephone number is (571)270-3098. The examiner can normally be reached Mon-Fri: 6:30 AM - 4:00 PM. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Amber Anderson can be reached at 571-270-5281. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /SEAN D ANDRISH/Primary Examiner, Art Unit 3678 SA 9/17/2026
Read full office action

Prosecution Timeline

Show 8 earlier events
Apr 28, 2026
Response Filed
May 21, 2026
Final Rejection mailed — §103
Jun 18, 2026
Interview Requested
Jul 02, 2026
Applicant Interview (Telephonic)
Jul 02, 2026
Examiner Interview Summary
Jul 23, 2026
Request for Continued Examination
Jul 29, 2026
Response after Non-Final Action
Sep 23, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12768121
TEMPORARY HOLDING SYSTEM FOR TEMPORARILY HOLDING, DURING DRIVING OPERATIONS, A FOUNDATION PILE INTENDED TO RECEIVE THE MAST OF AN OFF-SHORE WIND TURBINE
3y 5m to grant Granted Oct 20, 2026
Patent 12760489
CIVIL ENGINEERING STRUCTURE FOR GUIDING A LINE
2y 7m to grant Granted Oct 13, 2026
Patent 12760649
ROCK BOLT INSTALLATION
2y 0m to grant Granted Oct 13, 2026
Patent 12747808
DIRECT TIE-IN OF A PIPELINE
3y 4m to grant Granted Sep 29, 2026
Patent 12747640
RETROFIT VORTEX-INDUCED-VIBRATION (VIV) SUPPRESSION DEVICE
2y 2m to grant Granted Sep 29, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

5-6
Expected OA Rounds
72%
Grant Probability
99%
With Interview (+32.2%)
2y 3m (~0m remaining)
Median Time to Grant
High
PTA Risk
Based on 1142 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month