Prosecution Insights
Last updated: October 27, 2026
Application No. 18/346,132

TEMPERATURE CONTROL DEVICE SURROUNDING EQUIPMENT PENETRATING A PRESSURIZED VESSEL

Non-Final OA §112
Filed
Jun 30, 2023
Examiner
WASIL, DANIEL D
Art Unit
3646
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Westinghouse Electric Company LLC
OA Round
2 (Non-Final)
80%
Grant Probability
Favorable
2-3
OA Rounds
0m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 80% — above average
80%
Career Allowance Rate
540 granted / 676 resolved
+27.9% vs TC avg
Strong +25% interview lift
Without
With
+24.8%
Interview Lift
resolved cases with interview
Typical timeline
2y 11m
Avg Prosecution
30 currently pending
Career history
717
Total Applications
across all art units

Statute-Specific Performance

§101
5.9%
-34.1% vs TC avg
§103
36.2%
-3.8% vs TC avg
§102
13.0%
-27.0% vs TC avg
§112
42.3%
+2.3% vs TC avg
Black line = Tech Center average estimate • Based on career data from 676 resolved cases

Office Action

§112
DETAILED ACTION Response to Amendment A Reply was filed 6 July 2026. All amendments therein have been entered. Claims 1-20 are pending, with claims 18-20 being withdrawn. The text of those sections of Title 35, U.S. Code not included in this action can be found in a prior Office action. Claim Rejections - 35 USC § 112(b) Claims 1-17 are rejected under 35 U.S.C. 112(b) being indefinite for failing to particularly point out and distinctly claim the subject matter which an inventor regards as the invention. Claim 1 The phrase “maintain the motor at a temperature equal to or below a predetermined temperature threshold via heat transfer through at least one of the inner wall, outer wall, and end plate” is unclear. It is unclear whether an “endplate” is being positively recited. Regardless, it appears that “endplate” lacks proper antecedent basis. Also, in said phrase the term “threshold” appears to be redundant, and thus not needed. Claim 7 Claim 7 conflicts with claim 1. Claim 1 states “the first internal plate attached to the inner wall and outer wall such that the first internal plate spans the distance between the inner wall and the outer wall” and “the second internal plate attached to the inner wall and the outer wall such that the second internal plate spans the distance between the inner wall and the outer wall”. Thus, there can’t be first and second gaps (claim 7). Claim 8 Because of the above noted claim 7 conflict, the claim 8 phrase “and is not physically attached to either of the first internal plate or second internal plate” is not accurate. Claim 11 The phrase “and the the shaft seal” is unclear. It appears that words are missing between “the the”. Thus, the claim appears to be incomplete. Claim 12 The phrase “in a non-equilibrium state of the nuclear reactor defined by the first pressure being greater than the second pressure, and the shaft seal is configured” is unclear. It appears that either the term “and” is not needed or words are missing in said phrase. Claim 13 The phrase “in a non-equilibrium state of the nuclear reactor defined by the first pressure being less than the second pressure, and the shaft seal is configured” is unclear. It appears that either the term “and” is not needed or words are missing in said phrase. Claim 15 The phrase “predetermined temperature threshold 250° Fahrenheit” is unclear. It appears that at least one word is missing. Also, it appears that “threshold” is unnecessary. It is unclear whether said phrase should be interpreted as “predetermined temperature of 250° Fahrenheit” Review The claims do not allow the public to be sufficiently informed of what would constitute infringement. Any claim not specifically addressed is rejected based upon its dependency. Response to Arguments Applicant’s arguments with respect to the prior rejections are persuasive. Allowable Subject Matter Claims 1-17 would be allowable if rewritten to overcome the rejection(s) under 35 U.S.C. 112(b) set forth in this Office action, and (if necessary) to include all of the limitations of the base claim and any intervening claims. Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. Prosecution on the merits is closed. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Additional Comments The below amended claims 1, 7-8, 11-13, 15, and 18-20 are presented for Applicant’s consideration. Claim 1. (For Consideration) A nuclear reactor, comprising: a canister; a nuclear reactor core housed inside of the canister, the nuclear reactor core comprising: a control drum; and a shaft extending from the control drum and out of the nuclear reactor core; and a controlled temperature housing attached to the canister, configured such that heat generated by the nuclear reactor core is transferred to the controlled temperature housing, and wherein the controlled temperature housing comprises: a proximal end attached to the canister; an inner wall extending distally away from the proximal end; an outer wall extending distally away from the proximal end, the outer wall disposed opposite the inner wall away from the inner wall; a first internal plate spaced from and positioned distal to the proximal end, the first internal plate attached to the inner wall and outer wall such that the first internal plate spans the distance between the inner wall and the outer wall forming a first internal space; a second internal plate spaced from and positioned distal to the first internal plate, the second internal plate attached to the inner wall and the outer wall such that the second internal plate spans the distance between the inner wall and the outer wall; an end plate spaced from and positioned distal to the second internal plate, the end plate attached to the inner wall and the outer wall; and a motor mounted to the second internal plate, wherein the shaft enters the controlled temperature housing through the proximal end and extends to the motor, wherein the motor is operably coupled to the shaft, and wherein the controlled temperature housing is configured to passively maintain the motor at a temperature equal to or below a predetermined temperature [[the end plate. Claim 7. (For Consideration) The nuclear reactor of claim 6, wherein the internal wall and external wall form at least part of an external housing surrounding the first internal plate and the second internal plate Claim 8. (For Consideration) The nuclear reactor of claim 7, wherein the external housing is attachable to the base plate Claim 11. (For Consideration) The nuclear reactor of claim 10, wherein the cannister includes a hole with a shaft seal through which a working fluid may flow, and the [[the]] shaft seal maintains (i) the working fluid at a first pressure in the canister, and (ii) the working fluid at a second pressure in the controlled temperature housing, and wherein in an equilibrium state of the nuclear [[reactor]] reactor, the first pressure is equal to the second pressure. Claim 12. (For Consideration) The nuclear reactor of claim 11, wherein in a non-equilibrium state of the nuclear reactor defined by the first pressure being greater than the second pressure, [[and]] the shaft seal is configured to allow working fluid in the nuclear reactor core to enter the controlled temperature housing until the equilibrium state is reached. Claim 13. (For Consideration) The nuclear reactor of claim 11, wherein in a non-equilibrium state of the nuclear reactor defined by the first pressure being less than the second pressure, [[and]] the shaft seal is configured to allow working fluid in the controlled temperature housing to enter the nuclear reactor core until the equilibrium state is reached. Claim 15. (For Consideration) The nuclear reactor of claim 1, wherein the controlled temperature housing is configured to maintain the motor at a temperature equal to or below a predetermined temperature [[of 250° Fahrenheit. Claims 18-20. (For Consideration - Canceled) Contact Information Examiner Daniel Wasil can be reached at (571) 272-4654, on Monday-Thursday from 10:00-4:00 EST. Supervisor Jack Keith (SPE) can be reached at (571) 272-6878. /DANIEL WASIL/ Examiner, Art Unit 3646 Reg. No. 45,303 /JACK W KEITH/Supervisory Patent Examiner, Art Unit 3646
Read full office action

Prosecution Timeline

Jun 30, 2023
Application Filed
Mar 18, 2026
Non-Final Rejection mailed — §112
Jul 06, 2026
Response Filed
Aug 12, 2026
Final Rejection mailed — §112
Oct 12, 2026
Response after Non-Final Action

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12770751
SYSTEM AND METHOD FOR MAKING NUCLEAR FUEL ELEMENTS WITH A CONTROLLED NUMBER OF NUCLEAR PARTICLES
4y 4m to grant Granted Oct 20, 2026
Patent 12770745
IN-SPACE PROPULSION SYSTEM THAT EMPLOYS A NUCLEAR FUSION REACTOR WITH CENTRIFUGAL MIRROR CONFINEMENT
4y 0m to grant Granted Oct 20, 2026
Patent 12763223
Process of Manufacture a Nuclear Component with Metal Substrate by Dlimocvd and Method against Oxidation/Hydriding of Nuclear Component
3y 7m to grant Granted Oct 13, 2026
Patent 12763226
DEVICE FOR USE IN A FUEL ASSEMBLY OF NUCLEAR POWER PLANT, METHOD FOR MANUFACTURING A DEVICE AND METHOD FOR ACTIVATING A MATERIAL IN A NUCLEAR POWER PLANT
3y 4m to grant Granted Oct 13, 2026
Patent 12763225
EMERGENCY CORE COOLING SYSTEM VALVE FOR INTEGRATED-TYPE REACTOR
3y 1m to grant Granted Oct 13, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

2-3
Expected OA Rounds
80%
Grant Probability
99%
With Interview (+24.8%)
2y 11m (~0m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 676 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month