Prosecution Insights
Last updated: October 25, 2026
Application No. 18/379,739

REINFORCEMENT OF WALL STRUCTURES USING SOLIDIFIABLE MATERIAL

Final Rejection §102
Filed
Oct 13, 2023
Priority
Oct 13, 2022 — provisional 63/379,314
Examiner
BUCKLE JR, JAMES J
Art Unit
3633
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Icon Technology Inc.
OA Round
2 (Final)
66%
Grant Probability
Favorable
3-4
OA Rounds
0m
Est. Remaining
80%
With Interview

Examiner Intelligence

Grants 66% — above average
66%
Career Allowance Rate
641 granted / 977 resolved
+13.6% vs TC avg
Moderate +15% lift
Without
With
+14.9%
Interview Lift
resolved cases with interview
Typical timeline
2y 4m
Avg Prosecution
34 currently pending
Career history
1005
Total Applications
across all art units

Statute-Specific Performance

§101
0.5%
-39.5% vs TC avg
§103
43.7%
+3.7% vs TC avg
§102
31.3%
-8.7% vs TC avg
§112
20.1%
-19.9% vs TC avg
Black line = Tech Center average estimate • Based on career data from 977 resolved cases

Office Action

§102
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Election/Restrictions Applicant’s election without traverse of Invention II in the reply filed on 1/26/2026 is acknowledged. Claims 7-19 are pending and examined below. Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claim(s) 7-19 is/are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Mayer (US. Publication No. 2024/0139996). Regarding claim 7, Mayer discloses a method of forming a building structure (Figs. 1-5), comprising forming, using a three-dimensional (3D) printing system (Para [0021], a first wythe (1’) comprising a first plurality of stacked elongated beads (2) of an extrudable building material; forming, using the three-dimensional (3D) printing system, a second wythe (1’) that comprises a second plurality of stacked elongated beads (2) of the extrudable building material; and positioning a porous layer (5) between the first wythe and the second wythe (Figs. 1-4). Regarding claim 8, Mayer discloses embedding the porous layer in one or more of the first and second wythes. Regarding claim 9, Mayer discloses choosing a size of the porous layer based on the three-dimensional (3D) printing system. Regarding claim 10, Mayer discloses embedding the porous layer in one or more of the first and second wythes, a size of the porous layer being determined using the three- dimensional (3D) printing system. Regarding claim 11, Mayer discloses positioning the porous layer (5) comprises reinforcing the porous layer by coupling the first wythe and the second wythe using embedded reinforcement (7, Figs. 1-2). Regarding claim 12, Mayer discloses comprising coupling the porous layer (5) to a support member (4) disposed adjacent to the end of a print path, the print path being used by the three- dimensional (3D) printing system to form the building structure. Regarding claim 13, Mayer discloses the porous layer (5) comprises suspending a carbon fiber mesh from a support member (Para [0049]). Regarding claim 14, Mayer discloses coupling the porous layer (5) to a support member (4) disposed adjacent to the end of a print path, the print path being used by the three-dimensional (3D) printing system to form the building structure and filling a space between the support member and one or more of the first and second wythes with a building material (Para [0039]). Regarding claim 15, Mayer discloses positioning the porous layer (5) comprises suspending a carbon fiber mesh from a support member (Para [0049]) and filling a space between the support member and one or more of the first and second wythes with a building material (Para [0039]). Regarding claim 16, Mayer discloses the first wythe (1’) and the second wythe (1’) comprises overlapping a first elongated bead of the first plurality of stacked elongated beads with a second elongated bead of the second plurality of stacked elongated beads (Para [0047]). Regarding claim 17, Mayer discloses comprising positioning a different porous layer between the first wythe and second wythe when the first and second wythes reach a height of the porous layer (Para [0050]). Regarding claim 18, Mayer discloses comprising positioning a different porous layer between the first wythe and second wythe when the first and second wythes reach a height of the porous layer further and coupling the different porous layer to the support member (Para [0050]). Regarding claim 19, Mayer discloses comprising positioning a different porous layer between the first wythe and second wythe when the first and second wythes reach a height of the porous layer and overlapping an edge of the different porous layer with an edge of the porous layer (Para [0050]). The Examiner considers the different porous layers to be overlapped when tied together. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Any inquiry concerning this communication or earlier communications from the examiner should be directed to JAMES J BUCKLE JR whose telephone number is (571)270-3739. The examiner can normally be reached Monday-Thursday, 8:00 am to 6:30pm EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Brian Glessner can be reached at 5712726754. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /JAMES J BUCKLE JR/Examiner, Art Unit 3633
Read full office action

Prosecution Timeline

Oct 13, 2023
Application Filed
Apr 08, 2026
Non-Final Rejection mailed — §102
Oct 08, 2026
Response Filed
Oct 22, 2026
Final Rejection mailed — §102 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12760937
CLAMPING ARRANGEMENT AND MOUNTING ARRANGEMENT FOR A SOLAR CELL MODULE
2y 7m to grant Granted Oct 13, 2026
Patent 12747573
DECK CONSTRUCTION SYSTEM
1y 12m to grant Granted Sep 29, 2026
Patent 12742331
DECORATIVE SHUTTERS WITH PACKAGING STRUCTURE
2y 2m to grant Granted Sep 22, 2026
Patent 12742323
Framing Assembly
2y 1m to grant Granted Sep 22, 2026
Patent 12735888
WALL FRAMING BRACKET AND ASSEMBLY
2y 11m to grant Granted Sep 15, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
66%
Grant Probability
80%
With Interview (+14.9%)
2y 4m (~0m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 977 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month