Prosecution Insights
Last updated: November 12, 2026
Application No. 18/380,329

METHOD OF MODIFYING ALUMINUM BODY RAILCARS, MODIFIED RAILCARS FORMED THEREBY AND ALUMINUM TOP CORD SPLICE COUPLING USED THEREIN

Final Rejection §112
Filed
Oct 16, 2023
Priority
Apr 14, 2021 — provisional 63/175,046 +2 more
Examiner
BUFFINGTON, HEAVEN RICHELLE
Art Unit
3615
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Jac Operations Inc.
OA Round
2 (Final)
83%
Grant Probability
Favorable
3-4
OA Rounds
96%
With Interview

Examiner Intelligence

Grants 83% — above average
83%
Career Allowance Rate
95 granted / 114 resolved
+31.3% vs TC avg
Moderate +13% lift
Without
With
+13.1%
Interview Lift
resolved cases with interview
Typical timeline
Avg Prosecution
25 currently pending
Career history
144
Total Applications
across all art units

Office Action

§112
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Detailed Action Claims 1-20 are currently pending. Claims 1-5, 7-11, 13-16 and 18-20 are allowed. Claims 6, 12 and 17 remain rejected despite Applicant’s arguments filed 06/12/2026. Amendment necessitated new grounds of rejection presented within this Office action. Drawing objections remain after Applicant’s amendment. Claims contain outstanding 112(b) rejections. Response to Applicant arguments can be found at the end of this Office action. This Office action is final. Drawings Figures 3, 7A, 7B and 7C should be designated by a legend such as --Prior Art-- because only that which is old is illustrated. Examiner notes that Applicant Remarks filed 06/12/2026 state, “Please replace the original set of figures with the replacement set filed herewith in which figures 3, 7A, 7B and 7C have been listed as PRIOR ART in accordance with the request of the examiner.” However, no replacement set was included in the filing. See MPEP § 608.02(g). Corrected drawings in compliance with 37 CFR 1.121(d) are required in reply to the Office action to avoid abandonment of the application. The replacement sheet(s) should be labeled “Replacement Sheet” in the page header (as per 37 CFR 1.84(c)) so as not to obstruct any portion of the drawing figures. If the changes are not accepted by the examiner, the applicant will be notified and informed of any required corrective action in the next Office action. The objection to the drawings will not be held in abeyance. Claim Objections Claim 20 is objected to because of the following informalities: Claim 20 contains an additional period at the end of the claim. Appropriate correction is required. Claim Rejections - 35 USC § 112 The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. Claims 6, 12 and 17 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. Claims 6, 12 and 17 recite the limitation “the remaining portions of the side chord” within lines 2-3, after reciting “portions of a side sill” within previous claims. This makes the limitation unclear as to which component is claimed. Examiner recommends amending “the side chord” to “the side sill”. Allowable Subject Matter Claims 1-5, 7-11, 13-16 and 18-20 are allowed. Claims 6, 12 and 17 would be allowable if rewritten to overcome the rejection(s) under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), 2nd paragraph, set forth in this Office action and to include all of the limitations of the base claim and any intervening claims. The following is a statement of reasons for the indication of allowable subject matter: The prior art fails to teach the combination of limitations recited in claims 1-5, 7-11, 13-16 and 18-20. More specifically, the prior art fails to teach wherein the removed floor construction includes removing either, a) all of the plurality of hopper discharge gates, and the outside hopper sheets, lower hopper floor and the partition floors forming the hopper chutes between the end walls of the hopper style donor railcar, or b) all of the floor sheets and pair of tubs between end walls of the gondola style donor railcar cars as claimed within claim 1. Examiner agrees with Applicant that the prior art teaches away from these limitations (see Remarks filed 06/12/2026, pgs.4-5) since the method within Miller (US 6502518 B1) teaches coupling the ends of the retained floor sections including the hopper components together and only removing the central section adjacent to the removed side sections. Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to HEAVEN BUFFINGTON whose telephone number is (703)756-1546. The examiner can normally be reached Monday-Friday 9:00am to 5:00pm ET. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Samuel (Joe) Morano can be reached at (571)272-8300. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /HEAVEN R BUFFINGTON/Examiner, Art Unit 3615 /S. Joseph Morano/Supervisory Patent Examiner, Art Unit 3615
Read full office action

Prosecution Timeline

Oct 16, 2023
Application Filed
Mar 12, 2026
Non-Final Rejection mailed — §112
Jun 12, 2026
Response Filed
Sep 02, 2026
Final Rejection mailed — §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12786273
VEHICLE CONTROL SYSTEM
3y 4m to grant Granted Nov 03, 2026
Patent 12780268
RAIL VEHICLE COMPRISING A POWERPACK WITH A FUEL CELL AND A FUEL TANK
3y 2m to grant Granted Nov 03, 2026
Patent 12780270
RAIL VEHICLE HAVING CENTRAL BUFFER COUPLING
3y 0m to grant Granted Nov 03, 2026
Patent 12758887
SYSTEMS AND METHODS FOR STORING PLAYER STATE CACHES LOCALLY ON RIDE VEHICLES
3y 6m to grant Granted Oct 13, 2026
Patent 12759596
PACKAGE TRANSPORT DEVICE AND CONTROL METHOD
3y 4m to grant Granted Oct 13, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
83%
Grant Probability
96%
With Interview (+13.1%)
Moderate
PTA Risk
Based on 114 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.