Prosecution Insights
Last updated: November 04, 2026
Application No. 18/381,729

DUAL FAUCET WITH STERILE WATER AND REGULAR WATER SUPPLY FUNCTION

Final Rejection §103§112
Filed
Oct 19, 2023
Priority
Oct 27, 2022 — RE 10-2022-0140470
Examiner
WITTENBERG, STEFANIE S
Art Unit
1795
Tech Center
1700 — Chemical & Materials Engineering
Assignee
Cebien Co. Ltd.
OA Round
2 (Final)
55%
Grant Probability
Moderate
3-4
OA Rounds
0m
Est. Remaining
72%
With Interview

Examiner Intelligence

Grants 55% of resolved cases
55%
Career Allowance Rate
383 granted / 700 resolved
-10.3% vs TC avg
Strong +18% interview lift
Without
With
+17.6%
Interview Lift
resolved cases with interview
Typical timeline
3y 1m
Avg Prosecution
44 currently pending
Career history
769
Total Applications
across all art units

Statute-Specific Performance

§101
0.1%
-39.9% vs TC avg
§103
52.3%
+12.3% vs TC avg
§102
14.4%
-25.6% vs TC avg
§112
31.0%
-9.0% vs TC avg
Black line = Tech Center average estimate • Based on career data from 700 resolved cases

Office Action

§103 §112
DETAILED ACTION Status of Claims Claims 1-5 are pending. Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Status of Objections and Rejections The previous objections to claims 1-5 are withdrawn in view of Applicant’s amendment. All other rejections from the previous Office action are withdrawn in view of Applicant’s amendment. New grounds of rejection are necessitated by amendment. Claim Objections Claim 1 is objected to because of the following informalities: the terms “(+)” and “(-)” may be more appropriately written as “positive” and “negative”, respectively. Appropriate correction is required. Claim Rejections - 35 USC § 112 The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. Claims 1-5 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. Claim 1 recites the limitation "the measured internal voltage value" in line 15. There is insufficient antecedent basis for this limitation in the claim. Claim 1 previously states “a voltage value under a load resistance”, however, this is not clearly connected to a measured internal voltage value. Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. This application currently names joint inventors. In considering patentability of the claims the examiner presumes that the subject matter of the various claims was commonly owned as of the effective filing date of the claimed invention(s) absent any evidence to the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to point out the inventor and effective filing dates of each claim that was not commonly owned as of the effective filing date of the later invention in order for the examiner to consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2) prior art against the later invention. Claim(s) 1-5 is/are rejected under 35 U.S.C. 103 as being unpatentable over Murata et al. (US 2017/0328047), in view of Shanahan et al. (US 2014/0106007) and in further view of Matsuyama et al. (US 2018/0222775). Regarding claim 1, Murata discloses a water device (title) comprising a first water discharge part (12) and a second water discharge part (13) [0043] (= a dual faucet with a sterile water and regular water supply function), comprising: A faucet device (1) including a discharge pipe (11) (Figure 2a) [0043] (= a faucet body including a body portion), a second water discharge port (13a) connected to the pipe (11) and through which water that has been electrolyzed comes [0059] (= a sterile water outlet faucet connected to the body portion and through which sterile water comes), and a first water discharge port (12a) supplying normal water and is connected to the discharge pipe (11) and is located near the second water discharge port [0054], [0072] (= and a regular water outlet faucet connected to the body portion near the sterile water outlet faucet and through which raw water supplied from a raw water pipe line comes; Murata discloses tap water which the instant specification indicates is raw water, page 13, lines 10-11); and PNG media_image1.png 404 272 media_image1.png Greyscale PNG media_image2.png 556 424 media_image2.png Greyscale Controlling the current or voltage of the electrolysis tank (37) in relation to concentration with a controller (40) abstract, [0006]-[0010], [0086]-[0087]. Regarding “a sterile water supply unit including a casing, and an electrolytic bath module disposed in the casing and configured to produce sterile water by electrolysis of the raw water supplied from the raw water pipe line and supply the produced sterile water to the sterile water outlet faucet” and “wherein the electrolytic bath module includes a housing having a sterile water production space, a positive electrode and a negative electrode installed in the housing, a power supply unit configured to form a potential difference between the positive electrode and the negative electrode” Murata discloses a second water unit including an electrolysis tank (37) which intrinsically includes a casing or housing and electrolyzes the water supplied to the second water discharge port (13a) from a common water supply piping (21) (abstract, [0054], [0056], [0059], Figure 6). The electrolysis tank of Murata intrinsically includes a positive electrode and negative electrode within the casing or housing to treat the water (abstract, [0061]). Murata discloses a controller (40) for adjusting the concentration, an electrolysis device which is inclusive of current and voltage control and measurement and controlling the electrolysis based on concentration. Murata does not disclose a measurement unit configured to measure a voltage value under a load resistance of the electrolytic bath module. In the same or similar field of water electrolysis [0018] and faucets [0009], Shanahan discloses a control module and sensors such as meters that measure how much voltage or current is being applied to or across electrodes. Shanahan discloses that feedback from the voltmeter may cause a user to vary a setting of the system such as the amperage [0115]. Before the effective filing date of the claimed invention, it would have been obvious to one of ordinary skill in the art to produce a device comprising a voltage measuring device because Shanahan discloses various voltmeter devices for measuring a voltage across or between electrodes and subsequently adjusting settings. It would have been obvious to modify the device of Murata with a voltage measuring measurement unit for adjusting the concentration based on the measured voltage. Murata in view of Shanahan differs from the instant claim in that the combination does not disclose an additional casing or housing for supplying the sterile water. The electrolysis tank (37) of Murata is being interpreted as including a single housing or tank. In the same or similar field of water electrolysis, Matsuyama discloses a device comprising a tank or container (4) (= claimed casing) of electrolyzed water production device (1B) and an electrolytic bath (3) (= electrolytic bath module comprising a housing) (Figure 25). In an additional embodiment, Matsuyama discloses an electrolytic bath (3) within an electrolyzed water production device (1E) (Figure 28). Before the effective filing date of the claimed invention, it would have been obvious to one of ordinary skill in the art to produce a device comprising a sterile water supply unit including a casing, and an electrolytic bath module disposed in the casing and wherein the electrolytic bath module includes a housing because Matsuyama discloses that an electrolytic bath (= electrolytic bath module) with its housing may be positioned within a tank or container that is configured to supply water. Since Murata does not explicitly disclose the electrolysis tank setup or configuration, one of ordinary skill in the art would necessarily look to the art for workable water supply units and arrive at a reference such as Matsuyama which discloses multiple housings or containers for storing water and carrying out electrolysis. Regarding claim 2, the instant claim is directed towards the manner of operating the claimed faucet and does not structurally limit the claimed faucet. The instant claim appears to recite controlling the operation of the electrolysis through current or voltage. Murata discloses controlling the operation of electrolysis [0006]-[0010], [0086]-[0087]. The control of the current or voltage of Murata is in relation to the concentration. Regarding claim 3, the instant claim is directed towards the manner of operating the claimed device and does not further structurally limit the claimed device. Murata discloses controlling the energization (current or voltage) using a controller and discloses starting/stopping the energization to the electrolysis tank (abstract, [0010], [0074]). Regarding claim 4, the instant claim appears to require an operation switch. Since the device of Murata includes controlling the electrolysis to start and stop, there is intrinsically a switch controller. Murata discloses controlling the energization (current or voltage) using a controller and discloses starting/stopping the energization to the electrolysis tank (abstract), [0010], [0074]. Further, Murata discloses a user interface (= external manipulation) in combination with a sensor unit comprising a sensor signal for controlling the electrolysis tank operation [0057], [0093], [0120], Figure 13. Regarding claim 5, the instant claim does not appear to further structurally limit the claimed device. The controller of Murata includes control of the voltage and current and starting/stopping the electrolysis along with a sensor signal as described above. Response to Arguments Applicant's arguments filed 13 August 2026 have been fully considered. The remarks on pages 5-7 are directed towards the previous grounds of rejection which have been withdrawn in view of Applicant’s amendment and therefore will not be specifically addressed at this time. New grounds of rejection are necessitated by amendment. Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to STEFANIE S WITTENBERG whose telephone number is (571)270-7594. The examiner can normally be reached Monday - Friday, 7:00 am -4:00 pm EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Luan Van can be reached at (571) 272-8521. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /Stefanie S Wittenberg/ Primary Examiner, Art Unit 1795
Read full office action

Prosecution Timeline

Oct 19, 2023
Application Filed
Apr 30, 2026
Non-Final Rejection mailed — §103, §112
Aug 13, 2026
Response Filed
Oct 30, 2026
Final Rejection mailed — §103, §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12781370
COPPER ELECTROWINNING PROCESS
5y 1m to grant Granted Nov 03, 2026
Patent 12768069
APPARATUS FOR MANUFACTURING COPPER FOIL
3y 6m to grant Granted Oct 20, 2026
Patent 12759067
SYSTEM AND METHOD FOR FORMING A NOZZLE INLET OF A NOZZLE
3y 11m to grant Granted Oct 13, 2026
Patent 12758681
TITANIUM IMPLANT WITH SURFACE COATING IN CRATER-LIKE POROUS SHAPE AND PREPARATION METHOD THEREOF, AND IMPLANT MATERIAL
3y 9m to grant Granted Oct 13, 2026
Patent 12760439
DEVICE AND METHOD FOR ELECTROLYTIC TREATMENT OF SUBSTRATES
2y 5m to grant Granted Oct 13, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
55%
Grant Probability
72%
With Interview (+17.6%)
3y 1m (~0m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 700 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email