DETAILED ACTION
Notice of Pre-AIA or AIA Status
The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA .
In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status.
Election/Restrictions
Applicant’s election without traverse of Group I, claims 1-19, in the reply filed on 10 July 2026 is acknowledged.
Claims 20-21 are withdrawn from further consideration pursuant to 37 CFR 1.142(b) as being drawn to a nonelected invention, there being no allowable generic or linking claim. Election was made without traverse in the reply filed 10 July 2026.
Amendments
Applicant’s amendments to the claims and specification filed on 10 July 2026 have been received and considered for this action.
Information Disclosure Statement
The Information Disclosure Statement filed on 27 December 2023 has been received and considered by the Examiner.
Claim Interpretation
Claim 1 recites the limitation “adding hydrogen peroxide, phosphoric acid, an ammonium dihydrogen phosphate solution and ammonia water.” Claims 9 and 11 then recite the limitations of “sequentially adding hydrogen peroxide, phosphoric acid, an ammonium dihydrogen phosphate solution and ammonia water” and “sequentially adding phosphoric acid, an ammonium dihydrogen phosphate solution, hydrogen peroxide and ammonia water into the ferrous sulfate solution” (emphasis added), respectively. Claims 9 and 11 are therefore interpreted as requiring the addition of the reagent to be added one after another in the order listed.
Likewise, claim 18 uses the term “sequentially” along with a series of steps, which is also interpreted as requiring that the steps be performed one after another in the order listed.
Drawings
Replacement drawings were received on 10 July 2026. However, these drawings do not remedy all of the deficiencies noted in the prior Office action.
In particular, the drawings are objected to as failing to comply with 37 CFR 1.84(p)(4) because reference characters “S3” and “S6” have been used to designate steps that are not identical in Fig. 1, 3, 5, and 7-8. Corrected drawing sheets in compliance with 37 CFR 1.121(d) are required in reply to the Office action to avoid abandonment of the application. Any amended replacement drawing sheet should include all of the figures appearing on the immediate prior version of the sheet, even if only one figure is being amended. Each drawing sheet submitted after the filing date of an application must be labeled in the top margin as either “Replacement Sheet” or “New Sheet” pursuant to 37 CFR 1.121(d). If the changes are not accepted by the examiner, the applicant will be notified and informed of any required corrective action in the next Office action. The objection to the drawings will not be held in abeyance.
Claim Rejections - 35 USC § 112
The following is a quotation of 35 U.S.C. 112(b):
(b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention.
The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph:
The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention.
Claims 1-19 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention.
Regarding claim 1, step S1 recites “ferrous sulfate, a by-product of titanium dioxide”. It is unclear if this phrase requires that the ferrous sulfate be obtained as a by-product of a titanium-dioxide production process, or if it is just reciting a property of all ferrous sulfate. Even if the claim were attempting to limit the source of the ferrous sulfate, as recited it appears to be only a product-by-process limitation as no method steps are associated with the process of obtaining the ferrous sulfate. Because it is unclear how ferrous sulfate obtained as a by-product of titanium dioxide would be distinguishable from any other ferrous sulfate, any ferrous sulfate may be considered as meeting this limitation.
Step S6 of claim 1, as well as claims 3, 7, 9, 11, 13, 16, and 17, each recite “the ferric phosphate with a high iron-phosphorus ratio” and “the ferric phosphate with a low iron-phosphorus ratio.” There is insufficient antecedent basis for these limitations in the claims.
It is further noted that the recitation in step S3 of claim 1 appears to imply that performing the step a single time and collecting different fractions of precipitate will yield the ferric phosphate with a high iron-phosphorus ratio and the ferric phosphate with a low iron-phosphorus ratio. However, the recitation of claim 3, which depends upon claim 1, appears to instead imply that different feeding ratios are required to generate the ferric phosphate with low and high iron-phosphorus ratios. However, claim 3 does not actually require that the different feeding ratios be used, only that doing so would be able to generate products with different iron-phosphorus ratios (“can be formed”).
The term “high temperature” in Step S4 of claim 1 is a relative term which renders the claim indefinite. The term “high temperature” is not defined by the claim, the specification does not provide a standard for ascertaining the requisite degree, and one of ordinary skill in the art would not be reasonably apprised of the scope of the invention. It is therefore unclear what temperatures are encompassed by the claim and the claim is indefinite.
The phrase "and the like" in step S9 further renders the claim indefinite because the claim includes elements not actually disclosed (those encompassed by "and the like"), thereby rendering the scope of the claim unascertainable. See MPEP § 2173.05(d).
Claims 2-19 depend upon claim 1 without resolving the indefiniteness and are likewise rejected.
Claims 5, 10, 14, and 17 each recite the limitation “the oxidized ferrous sulfate solution.” There is insufficient antecedent basis for these limitations in the claims.
Claim 6 recites the limitation “the particle size” and “the mixer”. There is insufficient antecedent basis for these limitations in the claim.
Claim 7 uses the both the terms “iron-phosphorus ratio” and “iron-phosphorus molar ratio.” It is unclear if the both these ratios refer to the same quantity of if the former refers to a ratio calculated on basis other than molar amounts.
Claim 8 recites the limitation “the air inlet temperature,” “the air outlet temperature,” and “the air blast frequency”. There is insufficient antecedent basis for these limitations in the claim.
Claim 19, which depends from claim 16 and ultimately claim 1, recites multiple instances of the limitation “the iron oxide” as well as the limitations “the secondary carbon source” and “the final product.” There is insufficient antecedent basis for these limitation because none of claims 19, 16 or 1 recite an iron oxide, a secondary carbon source, or a final product.
Pertinent Prior Art
The following prior art made of record and not relied upon is considered pertinent to applicant's disclosure:
CN 111333047 A (Wang ‘047): Wang ‘047 teaches a method for preparing iron phosphate as a precursor to lithium iron phosphate (p. 3, ¶ 11) comprising:
step S1: combining ferrous sulfate that is a by-product of titanium dioxide production, a phosphorus source (phosphoric acid) and a precipitant for purification (ammonia water), so as to obtain a ferrous sulfate solution after purification through filtration (p. 2, steps (1)-(3));
step S2: adding an appropriate amount of phosphoric acid into the ferrous sulfate solution to reduce a pH value of the ferrous sulfate solution (adding phosphoric acid into the purified solution, step (4), the first portion of which will also reduce the pH value of the solution);
step S3: adding phosphoric acid (step (4)), hydrogen peroxide, and ammonia water into the ferrous sulfate solution, then reacting for a period of time to form a mixed slurry, holding the mixed slurry at a temperature for a period of time
and then washing with water and subjecting to press filtration (step (4)-(5));
step S4: subjecting the iron phosphate precursors to drying and sintering at high temperature for a certain period of time to obtain finished products of ferric hydroxyphosphate precursor (drying temperature: 80-200 ℃, material moisture: less than or equal to 15 percent; dehydration, temperature: 550 ℃ and 700 ℃, and the dehydration time is 2-7 hours; p. 3, ¶ 2);
CN 112142025 A (Li): Li teaches a method of preparing iron phosphate using ferrous sulfate as the iron source, phosphoric acid as the phosphorus source, hydrogen peroxide as the oxidant, and diammonium hydrogen phosphate as the buffer ([0010]).
Li further teaches reacting for a period of time to form a mixed slurry, and then washing with water and subjecting to press filtration for several times to form ferric hydroxyphosphate precursors with different iron-phosphorus ratios and sintering these samples to obtain finished products with different iron-phosphorus ratios (p. 3, Example 2). Li also links the iron-phosphorus surface ratio to the surface area (p. 2, ¶ 3).
Li additionally teaches mixing the iron phosphate products obtained from the first filter cake (high iron-phosphorus ratio) with those obtained in the second filter cake (low-iron phosphorus ratio) so that the iron phosphate with the iron-phosphorus ratio of any ratio between 0.969 and 1.02 can be obtained (p. 3, ¶ 9).
CN 112678792 A (Wang ‘792): Wang ‘792 also teaches a largely similar preparation of iron phosphate and further teaches proportioning with a lithium and adding a certain amount of carbon source to form a mixed material ([0062]). Wang further teaches subjecting the aforementioned mixed material to sanding to obtain a sanded slurry; and spray-drying the sanded slurry to obtain a sprayed material ([0062]) and putting the aforementioned sprayed material in a tube furnace for sintering to obtain a sintered material ([0063]).
Allowable Subject Matter
Claims 1-19 would be allowable if rewritten or amended to overcome the rejection(s) under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), 2nd paragraph, set forth in this Office action.
The following is a statement of reasons for the indication of allowable subject matter:
The prior art of Wang ‘047, Li, and Wang ‘092 each teach various aspects of the claimed process, as described above. However, the instant claims combine these features with additional limitations, such as limitations on the specific filtering, milling, mixing, and drying processes to be employed in the process. Many of these additional limitations may be found individually in the prior art, but a motivation to combine them precisely as instantly claimed is lacking. Accordingly, the method of claim 1 and its dependent claims is found novel and non-obvious over the prior art.
Conclusion
Any inquiry concerning this communication or earlier communications from the examiner should be directed to Nicholas A Piro whose telephone number is (571)272-6344. The examiner can normally be reached Mon-Fri, 8:00 am-5:00 pm.
Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice.
If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Sally Merkling can be reached at (571) 272-6297. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300.
Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000.
/NICHOLAS A. PIRO/Assistant Examiner, Art Unit 1738
/PAUL A WARTALOWICZ/Primary Examiner, Art Unit 1735