Prosecution Insights
Last updated: October 26, 2026
Application No. 18/438,447

COMPUTING SESSION RELEASE METHOD AND DEVICE AND READABLE STORAGE MEDIUM

Final Rejection §103
Filed
Feb 10, 2024
Priority
Aug 10, 2021 — CN 202110915775.1 +1 more
Examiner
DIVECHA, KAMAL B
Art Unit
2453
Tech Center
2400 — Computer Networks
Assignee
Vivo Mobile Communication Co., Ltd.
OA Round
4 (Final)
25%
Grant Probability
At Risk
5-6
OA Rounds
2y 2m
Est. Remaining
70%
With Interview

Examiner Intelligence

Grants only 25% of cases
25%
Career Allowance Rate
44 granted / 174 resolved
-32.7% vs TC avg
Strong +44% interview lift
Without
With
+44.5%
Interview Lift
resolved cases with interview
Typical timeline
4y 11m
Avg Prosecution
16 currently pending
Career history
203
Total Applications
across all art units

Statute-Specific Performance

§101
14.2%
-25.8% vs TC avg
§103
52.9%
+12.9% vs TC avg
§102
15.2%
-24.8% vs TC avg
§112
13.6%
-26.4% vs TC avg
Black line = Tech Center average estimate • Based on career data from 174 resolved cases

Office Action

§103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Detailed Action This action is in response to communication filed 07/16/2026. Claims 1-4, 6-9, 11-20 are pending and presented for examination. Response to Arguments Applicant’s arguments with respect to claim(s) have been considered but are moot because the new ground of rejection does not rely on any reference applied in the prior rejection of record for any teaching or matter specifically challenged in the argument. Double Patenting The nonstatutory double patenting rejection has been withdrawn in light of Terminal Disclaimer filed on 07/16/2026 which was approved on 07/28/2026. Specification The specification is objected to as failing to provide proper antecedent basis for the claimed subject matter. See 37 CFR 1.75(d)(1) and MPEP § 608.01(o). Correction of the following is required: “computing resources comprise a processing resource…” The specification describes computing power resources include computing resources and storage resources, e.g. [0018], [0245], [0319, 0345, 0355], etc. Failure to provide proper support and/or explanation may result in a new matter rejection. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. This application currently names joint inventors. In considering patentability of the claims the examiner presumes that the subject matter of the various claims was commonly owned as of the effective filing date of the claimed invention(s) absent any evidence to the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to point out the inventor and effective filing dates of each claim that was not commonly owned as of the effective filing date of the later invention in order for the examiner to consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2) prior art against the later invention. Claim(s) 1-4, 15, and 18 is/are rejected under 35 U.S.C. 103 as being unpatentable over DAO et al. (US 2018/0199398 A1) in view of Zhu et al. (hereinafter Zhu, US 2020/0351985 A1) further in view of Puente Pestana et al. (hereinafter Puente, US 11,196,803 B2). As per claim 1, DAO discloses a computing session release method [Fig. 15], comprising: obtaining, by a session management function (SMF) [fig. 15 item #220], a first message, wherein the first message is configured to request release of computing resources of a computing session, wherein the computing resources comprise communication resources [fig. 15, item #1510a, [0182-183]: UE sends to the SMF a UE session release request message 1510a [thus releasing computing resources such as DRB resources], which is obtained by SMF]; sending, by the SMF, a third message to a computing management function [Fig. 15 item #204 or item #202] based on the first message, wherein the third message is configured to requesting release of the computing resources [fig. 15 item #1510d: SMF decides to release a session, fig. 15 item #1540, [0184]: SMF sends to the AN 204, via AMF, a SMF-AN session release request message 1540 for releasing the session and resources associated with the session]; wherein the computing management function is a network element configured to managing computing resources on computing and storage resource nodes [fig. 15 item #204: AN is a network element that is added and manages computing resources on both AN and UE, [0184]. The AN manages the computing resources by requesting release of DRB or radio resources and session context from UE and releases AN DRB resources and PDU context. [236]: Shows how AN manages the radio resource allocation for PDU session]. Note: Broadest Reasonable Interpretation (BRI) is applied to the term “computing management function”. However, DAO does not teach wherein the computing resources comprise a processing resource and a storage resource and wherein the computing management function is a network element dedicated to managing computing resources. Zhu, from the same field of endeavor explicitly teaches a computing management function which is a network element dedicated to manage computing resources (fig. 9 item #90, fig. 7B, fig. 8B, fig. 12B: Intermediate management function is dedicated specifically for managing session including management of resources), obtaining by SMF a first message, wherein the first message is configured to request release of computing resources of a computing session, wherein the computing resources comprise a storage resource and sending by the SMF a third message to computing management function to request release of the computing resources ([0014], [0027], [0230-0235]: requesting release of computing resources including storage resources and sending release response). Therefore, it would have been obvious to a person of ordinary skilled in the art before the effective filing date of the claimed invention to modify Dao in view of Zhu in order to request release of computing resources such as storage resources. One of ordinary skilled in the art would have been motivated in order avoid waste of storage resources [Zhu: [0014, 0027]]. However, DAO-Zhu does not teach wherein the computing resources comprise a processing resource. Puente, from the same field of endeavor, teaches virtualization infrastructure manager, which is responsible for resource level functions such as allocation, managing and releasing virtualized, e.g. computing, storage and networking resources, wherein the computing resources comprise a processing resource (fig. 3-4, col. 1 L60-67). Therefore, it would have been obvious to a person of ordinary skilled in the art before the effective filing date of the claimed invention to modify Dao-Zhu in view of Puente in order to request release of computing resources such as processing/computing resources. One of ordinary skilled in the art would have been motivated in order avoid waste of computing resources and free them up for future sessions. As per claim 2, DAO discloses the method according to claim 1, wherein the first message is triggered in any one of the following manners: triggered by a terminal via a mobility management function (AMF) [Fig. 15: item #1510a, [0182]]; triggered by an application function (AF) via the PCF; triggered by the PCF; triggered by a unified data management (UDM) device; triggered by the SMF [[0182]]; triggered by the computing management function [Fig. 15 item #1510b, [0182]]; triggered by the AMF; and triggered by an access network (AN) via the AMF [Fig. 15 item #1510b, [0182]]. As per claim 3, DAO-Zhu discloses the method according to claim 1, wherein the method further comprises: receiving, by the SMF, a fifth message from the computing management function, wherein the fifth message is used to indicate completion of release of computing resources [Dao: fig. 15, [0183-0184]: the AN removes the UE’s PDU context and release DRM resources and then sends to the SMF 220 a SMF-AN session release response message 1550 to confirm the release of AN resources for the released PDU session; ZHU: [234-235]: release response message]; or, wherein the method further comprises: sending, by the SMF, a sixth message, wherein the sixth message is used to respond to the first message. As per claim 4, DAO discloses the method according to claim 3, wherein the first message, the third message, the fifth message, and/or the sixth message comprises one or more of the following: UE identifier [[0182]: UE sends a session release message 1510a to the SMF, wherein the message includes UE ID, session ID and SM-NSSAI]; computing session identifier [[0182]: UE sends a session release message 1510a to the SMF, wherein the message includes UE ID, session ID and SM-NSSAI]; protocol data unit (PDU) session identifier [[0182]: UE sends a session release message 1510a to the SMF, wherein the message includes UE ID, session ID and SM-NSSAI]; bearer identifier; and quality of service (QoS) flow identifier. As per claims 15 and 18, they do not teach or further define over the limitations in claim 1. Therefore, claim 15 and 18 are rejected for the same reasons as set forth in claim 1. Claim(s) 6-9, 11-14, 16-17 and 19-20 is/are rejected under 35 U.S.C. 103 as being unpatentable over DAO et al. (US 2018/0199398 A1) in view of DAO et al. (hereinafter DAO II, US 2019/0261260 A1) in view of Zhu et al. (hereinafter Zhu, US 2020/0351985 A1) further in view of Puente Pestana et al. (hereinafter Puente, US 11,196,803 B2). As per claim 6, DAO discloses a computing session release method [fig. 15], comprising: receiving, by a computing management function [fig. 15: AN 204], a third message from an SMF [fig. 15, [0183]: SMF 220 sends to AN 204 a SMF-AN session release request message 1540]; and wherein the third message is sent by the SMF based on a first message [fig. 15, [0182]: release procedure is triggered by the UE, when the UE sends to the SMF 220 a UE session release request message 1510a and SMF sends release request message 1540 to AN], wherein the first message is used for requesting release of computing resources of a computing session [fig. 15, item #1510a, [0182-183]: UE sends to the SMF a UE session release request message 1510a [requesting release of PDU session and releasing computing resources such as DRB resources], which is obtained by SMF]; wherein the computing management function is a network element added for managing computing resources on computing and storage resource nodes [fig. 15 item #204: AN is a network element that is added and manages computing resources on both AN and UE, [0184]. The AN manages the computing resources by requesting release of DRB or radio resources and session context from UE and releases AN DRB resources and PDU context. [236]: Shows how AN manages the radio resource allocation for PDU session]. However, DAO does not teach sending, by the computing management function, a seventh message to a PCF based on the third message, wherein the seventh message is used for requesting deletion of a computing management policy [i.e. DAO does not teach sending policy delete request to the PCF after receiving session release request from SMF], wherein the computing resources comprise a processing resource and a storage resource and wherein the computing management function is a network element dedicated to managing computing resources. DAO II explicitly teaches the network management function sending a message to a PCF, wherein the message is used for requesting deletion of computing management policy [fig. 5: Network management 508 sends message delete request 511 to UDM which then sends delete request 514 to PCF, [0073-0076]: policy deletion request]. Therefore, it would have been obvious to a person of ordinary skilled in the art before the effective filing date of the claimed invention to modify Dao in view of Dao II in order to send a seventh message to the PCF based on the third message requesting deletion of computing management policy for the released session. One of ordinary skilled in the art would have been motivated in order to remove UE’s stored session policies from policy database of the PCF due to released connection. However, DAO-DAO II does not teach wherein the computing resources comprise a processing resource and a storage resource and wherein the computing management function is a network element dedicated to managing computing resources. Zhu, from the same field of endeavor explicitly teaches a computing management function which is a network element dedicated to manage computing resources (fig. 9 item #90, fig. 7B, fig. 8B, fig. 12B), obtaining by SMF a first message, wherein the first message is configured to request release of computing resources of a computing session, wherein the computing resources comprise a storage resource and sending by the SMF a third message to computing management function to request release of the computing resources ([0014], [0027], [0230-0235]). Therefore, it would have been obvious to a person of ordinary skilled in the art before the effective filing date of the claimed invention to modify Dao-Dao II in view of Zhu in order to request release of computing resources such as storage resources. One of ordinary skilled in the art would have been motivated in order avoid waste of storage resources [Zhu: [0014, 0027]]. However, DAO-Dao II-Zhu does not teach wherein the computing resources comprise a processing resource. Puente, from the same field of endeavor, teaches virtualization infrastructure manager, which is responsible for resource level functions such as allocation, managing and releasing virtualized, e.g. computing, storage and networking resources, wherein the computing resources comprise a processing resource (fig. 3-4, col. 1 L60-67). Therefore, it would have been obvious to a person of ordinary skilled in the art before the effective filing date of the claimed invention to modify Dao-Dao II-Zhu in view of Puente in order to request release of computing resources such as processing/computing resources. One of ordinary skilled in the art would have been motivated in order avoid waste of computing resources and free them up for future sessions. As per claim 7, DAO discloses the method according to claim 6, wherein the first message is triggered in any one of the following manners: triggered by a terminal via a mobility management function (AMF) [Fig. 15: item #1510a, [0182]]; triggered by an application function (AF) via the PCF; triggered by the PCF; triggered by a unified data management (UDM) device; triggered by the SMF [[0182]]; triggered by the computing management function [Fig. 15 item #1510b, [0182]]; triggered by the AMF; and triggered by an access network (AN) via the AMF [Fig. 15 item #1510b, [0182]]. As per claim 8, DAO-DAO II discloses the method according to claim 6, wherein the method further comprises: Receiving, by DAO II: fig. 5 item #519 in response to message 518 or item #512 in response to item 511]; Releasing, by the computing management function, computing resources of a computing node based on the eighth message [DAO: [0183]: AN releases the DRB resources]; and Sending, by the computing management function, a fifth message to the SMF, wherein the fifth message is configured to indicate completion of release of computing resources [DAO: [0183]: After deleting resources, AN sends to the SMF a SMF-AN session release response message to confirm the release of AN resources for the released PDU session]. However, DAO-DAO II does not teach receiving by the computing management function an eight message from the PCF used to respond to seventh message. But, it would have been obvious to a person of ordinary skilled in the art before the effective date of the claimed invention to modify DAO-DAO II in order to receive by the computing management function a response to the policy delete request. One of ordinary skilled in the art would have been motivated in order acknowledge and confirm the received policy deletion request. As per claim 9, DAO discloses the method according to claim 8, wherein the first message, the third message, the fifth message, and/or the sixth message comprises one or more of the following: UE identifier [[0182]: UE sends a session release message 1510a to the SMF, wherein the message includes UE ID, session ID and SM-NSSAI]; computing session identifier [[0182]: UE sends a session release message 1510a to the SMF, wherein the message includes UE ID, session ID and SM-NSSAI]; protocol data unit (PDU) session identifier [[0182]: UE sends a session release message 1510a to the SMF, wherein the message includes UE ID, session ID and SM-NSSAI]; bearer identifier; and quality of service (QoS) flow identifier. As per claims 11-14, 16-17 and 19-20, they do not teach or further define over the limitations in claims 6-9. Therefore, claims 11-14, 16-17 and 19-20 are rejected for the same reasons as set forth in claims 6-9. Relevant Prior Arts The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Huawei International Ltd., WO 2019017836A1, published 2019-01-24: Session processing method and device: Discloses Session Release Procedure for releasing the session and based on releasing the session, releasing the resources occupied by the session [218-220]. SON et al., US 2020/0053816 A1: Managing PDU session connection: Discloses connection release method Song et al., US 12,574,985 B2: Methods and Apparatus for Policy Control Qiao et al., US 2019/0109823 A1: Discloses Policy delete request sent to PCF. Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to KAMAL B DIVECHA whose telephone number is 571-272-5863. The examiner can normally be reached IFP Normal Hours M-F: 8am-4.30pm EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Colleen Fauz can be reached at 5712721667. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. KAMAL B. DIVECHA Primary Patent Examiner Art Unit 2453 /KAMAL B DIVECHA/Supervisory Patent Examiner, Art Unit 2453
Read full office action

Prosecution Timeline

Show 2 earlier events
Jun 25, 2025
Response Filed
Oct 08, 2025
Final Rejection mailed — §103
Dec 08, 2025
Response after Non-Final Action
Feb 16, 2026
Request for Continued Examination
Feb 26, 2026
Response after Non-Final Action
Apr 16, 2026
Non-Final Rejection mailed — §103
Jul 16, 2026
Response Filed
Oct 02, 2026
Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12764013
SYSTEMS AND METHODS FOR DETERMINING CAUSAL RELATIONSHIPS AMONG NETWORK ALARMS
2y 9m to grant Granted Oct 13, 2026
Patent 12045741
SESSION MONITORING FOR SELECTIVE INTERVENTION
3y 8m to grant Granted Jul 23, 2024
Patent 9558146
IWARP RDMA READ EXTENSIONS
3y 6m to grant Granted Jan 31, 2017
Patent 8375134
DETERMINING AN EFFICIENT KEEP-ALIVE INTERVAL FOR A NETWORK CONNECTION
3y 8m to grant Granted Feb 12, 2013
Patent 8356113
UPNP AV DEMUX
3y 9m to grant Granted Jan 15, 2013
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

5-6
Expected OA Rounds
25%
Grant Probability
70%
With Interview (+44.5%)
4y 11m (~2y 2m remaining)
Median Time to Grant
High
PTA Risk
Based on 174 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month