Prosecution Insights
Last updated: October 21, 2026
Application No. 18/561,896

HYDROGEN SULFIDE PRODUCING DEVICE AND METHOD FOR PRODUCING HYDROGEN SULFIDE

Non-Final OA §102
Filed
Nov 17, 2023
Priority
May 31, 2021 — JP 2021-091943 +3 more
Examiner
YOUNG, NATASHA E
Art Unit
1738
Tech Center
1700 — Chemical & Materials Engineering
Assignee
Furukawa Co. Ltd.
OA Round
1 (Non-Final)
83%
Grant Probability
Favorable
1-2
OA Rounds
0m
Est. Remaining
92%
With Interview

Examiner Intelligence

Grants 83% — above average
83%
Career Allowance Rate
905 granted / 1090 resolved
+18.0% vs TC avg
Moderate +9% lift
Without
With
+9.1%
Interview Lift
resolved cases with interview
Typical timeline
2y 6m
Avg Prosecution
26 currently pending
Career history
1128
Total Applications
across all art units

Statute-Specific Performance

§101
2.2%
-37.8% vs TC avg
§103
46.6%
+6.6% vs TC avg
§102
18.5%
-21.5% vs TC avg
§112
20.3%
-19.7% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1090 resolved cases

Office Action

§102
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Election/Restrictions Claim 15 is withdrawn from further consideration pursuant to 37 CFR 1.142(b) as being drawn to a nonelected invention, there being no allowable generic or linking claim. Election was made without traverse in the reply filed on June 8, 2026. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claim(s) 1 is/are rejected under 35 U.S.C. 102(a)(1)/(a)(2) as being anticipated by Hasenberg et al. (US 10, 040,584 B2). Regarding claim 1, Hasenberg et al. discloses a hydrogen sulfide producing device for producing hydrogen sulfide by reacting sulfur vapor with hydrogen gas, the hydrogen sulfide producing device comprising: a reactor (reaction vessel, 110) having a liquid sulfur filling part inside; a first heating unit (internal heating system, 180) for heating liquid sulfur to produce the sulfur vapor; and a hydrogen supply member (hydrogen containing gas inlet, 130) connected to the reactor (110) (see Abstract; figure 1; and column 3, line 58 through column 5, line 58). Claim(s) 1 is/are rejected under 35 U.S.C. 102(a)(1)/(a)(2) as being anticipated by Wölfert et al. (US 7,833,509 B2). Regarding claim 1, Wölfert et al. discloses a hydrogen sulfide producing device for producing hydrogen sulfide by reacting sulfur vapor with hydrogen gas, the hydrogen sulfide producing device comprising: a reactor (1) having a liquid sulfur filling part inside; a first heating unit (tube, 21) for heating liquid sulfur to produce the sulfur vapor; and a hydrogen supply member (feed device, 11) connected to the reactor (1) (see Abstract; figure 1; and column 13, line 58 through column 15, line 56). The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claim(s) 1 is/are rejected under 35 U.S.C. 102(a)(1) as being anticipated by JP H03103311 A. Regarding claim 1, JP H03103311 A discloses a hydrogen sulfide producing device for producing hydrogen sulfide by reacting sulfur vapor with hydrogen gas, the hydrogen sulfide producing device comprising: a reactor (1) having a liquid sulfur filling part inside; a first heating unit (heat exchange, 5) for heating liquid sulfur to produce the sulfur vapor; and a hydrogen supply member (pipeline, 4) connected to the reactor (1) (see Abstract; figure 1; and description). Allowable Subject Matter Claims 2-14 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. The closest prior art references are JP H03103311 A and Li et al. (CN 102500285 B) Regarding claim 2, JP H03103311 A discloses a hydrogen sulfide producing device wherein an interior of the reactor (1) includes a heat-insulating member (heat exchanging part, 14); and separately reactor (9) includes a catalyst support member (see Abstract; figure 1; and description). Li et al. discloses a hydrogen sulfide producing device (a sulfureted hydrogen synthesis device) wherein an interior of the reactor includes a catalyst support member (catalyst bed layer) provided above the liquid sulfur filling part, the hydrogen sulfide producing device further comprises a second heating unit (each section catalyst bed layer are provided with at least more than two layers of heat exchange coil (21)) for heating a space formed by the catalyst support member, and an inner wall of the reactor (see Abstract; figures 1-3 and paragraphs 0028-0039). The prior art references fail to disclose or suggest the combination of a hydrogen sulfide producing device wherein an interior of the reactor includes a catalyst support member provided above the liquid sulfur filling part and a heat-insulating member provided above the catalyst support member, the hydrogen sulfide producing device further comprises a second heating unit for heating a space formed by the catalyst support member, the heat-insulating member, and an inner wall of the reactor, and an upper space and a lower space of the heat-insulating member communicate with each other in a part of the heat-insulating member or around the heat-insulating member. Claims 3-5 depend on claim 2. Regarding claim 6, JP H03103311 A discloses a hydrogen sulfide producing device wherein an interior of the reactor (1) includes a heat-insulating member (heat exchanging part, 14); and separately reactor (9) includes a catalyst support member (see Abstract; figure 1; and description). Li et al. discloses a hydrogen sulfide producing device (a sulfureted hydrogen synthesis device) wherein an interior of the reactor includes a catalyst support member (catalyst bed layer) provided above the liquid sulfur filling part, the hydrogen sulfide producing device further comprises a second heating unit (each section catalyst bed layer are provided with at least more than two layers of heat exchange coil (21)) for heating the catalyst support member and an upper space of the catalyst support member (see Abstract; figures 1-3 and paragraphs 0028-0039). The prior art references fail to disclose or suggest the combination of a hydrogen sulfide producing device wherein an interior of the reactor includes a catalyst support member provided above the liquid sulfur filling part and a heat-insulating member provided between the catalyst support member and the liquid sulfur filling part, the hydrogen sulfide producing device further comprises a second heating unit for heating the catalyst support member and an upper space of the catalyst support member, and an upper space and a lower space of the heat-insulating member communicate with each other in a part of the heat-insulating member or around the heat-insulating member. Claims 7-9 depend on claim 6. Regarding claim 10, JP H03103311 A discloses a hydrogen sulfide producing device further comprising: a liquid sulfur supply member connected to the liquid sulfur filling part; and separately reactor (9) includes a catalyst support member (see Abstract; figure 1; and description). Li et al. discloses a hydrogen sulfide producing device (a sulfureted hydrogen synthesis device) wherein an interior of the reactor includes a catalyst support member (catalyst bed layer) provided above the liquid sulfur filling part, the hydrogen sulfide producing device further comprises a second heating unit (each section catalyst bed layer are provided with at least more than two layers of heat exchange coil (21)) for heating the catalyst support member and an upper space of the catalyst support member (see Abstract; figures 1-3 and paragraphs 0028-0039). The prior art references fail to disclose or suggest the combination of a hydrogen sulfide producing device JP H03103311 A fails to disclose or suggest a device wherein the hydrogen sulfide producing device further comprises a second heating unit for heating a space formed by the catalyst support member and an inner wall of the reactor. Claims 11-14 depend on claim 10. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to NATASHA E YOUNG whose telephone number is (571)270-3163. The examiner can normally be reached M-F 7:00 am - 6:00 pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Wang Claire can be reached at 571-270-1051. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. NATASHA E. YOUNG Examiner Art Unit 1774 /NATASHA E YOUNG/ Primary Examiner, Art Unit 1774
Read full office action

Prosecution Timeline

Nov 17, 2023
Application Filed
Oct 01, 2026
Non-Final Rejection mailed — §102 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12767734
APPARATUS AND METHOD FOR PREPARING POLY-ALPHA-OLEFIN
4y 0m to grant Granted Oct 20, 2026
Patent 12759876
SYSTEM AND METHOD FOR PRODUCING SULFUR DIOXIDE AND ASSOCIATED SULFURIC ACID PLANT
3y 7m to grant Granted Oct 13, 2026
Patent 12760226
MEMBRANE REACTOR
3y 7m to grant Granted Oct 13, 2026
Patent 12746525
1-METHYLCYCLOPROPENE GENERATION APPARATUS
3y 5m to grant Granted Sep 29, 2026
Patent 12741261
A SHELL-AND-TUBE HEAT EXCHANGER, METHOD OF EXCHANGING HEAT AND USE OF HEAT EXCHANGER
3y 7m to grant Granted Sep 22, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
83%
Grant Probability
92%
With Interview (+9.1%)
2y 6m (~0m remaining)
Median Time to Grant
Low
PTA Risk
Based on 1090 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month