Prosecution Insights
Last updated: October 25, 2026
Application No. 18/613,233

POWER STATION HAVING MULTIPLE CHARGING SYSTEMS

Non-Final OA §102§103
Filed
Mar 22, 2024
Priority
Nov 11, 2020 — provisional 63/112,621 +1 more
Examiner
GRANT, ROBERT J
Art Unit
2859
Tech Center
2800 — Semiconductors & Electrical Systems
Assignee
Bollinger Industries Inc.
OA Round
1 (Non-Final)
76%
Grant Probability
Favorable
1-2
OA Rounds
4m
Est. Remaining
94%
With Interview

Examiner Intelligence

Grants 76% — above average
76%
Career Allowance Rate
616 granted / 807 resolved
+8.3% vs TC avg
Strong +18% interview lift
Without
With
+17.5%
Interview Lift
resolved cases with interview
Typical timeline
2y 11m
Avg Prosecution
20 currently pending
Career history
836
Total Applications
across all art units

Statute-Specific Performance

§101
1.3%
-38.7% vs TC avg
§103
64.9%
+24.9% vs TC avg
§102
27.5%
-12.5% vs TC avg
§112
5.4%
-34.6% vs TC avg
Black line = Tech Center average estimate • Based on career data from 807 resolved cases

Office Action

§102 §103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claims 1-10, 12-15, 17, and 22-31 are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Jakins et al. (USPUB 2013/0257346). As to Claim 1, Jakins discloses a power station system comprising: at least one energy collector configured to collect energy from an associated ambient source (Figure 5, element 402); at least one energy generator configured to create energy (Figure 7, Element 420); at least one energy storage device configured to store energy from the at least one energy collector and the at least one energy generator (Figure 3, Element 102); at least one inverter or energy conversion device configured to convert energy from one type or format to another (Element 104); at least one output port configured to provide energy; and a controller configured: to determine input power based on energy collected by the at least one energy collector and energy generated by the at least one energy generator, to determine output power based on the energy provided to the at least one energy output connection and to control the at least one energy generator based on the input power and the output power (Paragraph 44-46). As to Claim 2, Jakins discloses the power station system as in claim 1, wherein, when controlling the at least one energy generator, the controller is further configured to determine whether the at least one energy storage device has a threshold percentage of capacity (Paragraph 47). As to Claim 3, Jakins discloses the power station system as in claim 2, wherein the controller is further configured to turn off the at least one energy generator in response to the at least one energy storage device exceeding the threshold percentage of capacity (Paragraph 45). As to Claim 4, Jakins discloses the power station system as in claim 2, wherein the controller is further configured to turn on the at least one energy generator in response to the at least one energy storage device being less than the threshold percentage of capacity (Paragraph 45). As to Claim 5, Jakins discloses the power station system as in claim 1, wherein the at least one inverter or energy conversion device comprises a plurality of inverter or energy conversion devices configured to work either in parallel or in series with each other (Figure 3). As to Claim 6, Jakins discloses the power station system as in claim 1, wherein the at least one energy storage device comprises a plurality of storage devices configured for one of: simultaneous energy storage, and sequential energy storage where each is sequentially depleted (Paragraph 60). As to Claim 7, Jakins discloses the power station system as in claim 1, wherein, when controlling the at least one energy generator, the controller is further configured to determine whether the input power exceeds the output power (Paragraph 57). As to Claim 8, Jakins discloses the power station system as in claim 7, wherein the controller is further configured to turn off the at least one energy generator in response to the input power exceeding the output power (Paragraph 57). As to Claim 9, Jakins discloses the power station as in claim 1, wherein, when controlling the at least one energy conversion device, the controller is further configured to determine and adjust maximum output so as not to exceed a capacity of the at least one energy storage device (Paragraph 25). As to Claim 10, Jakins discloses the power station system as in claim 1, wherein the at least one energy collector comprises at least one of: a solar panel, a hydro collector, and a wind turbine (Paragraph 25). As to Claim 12, Jakins discloses the power station system as in claim 1, further comprising at least one input port configured to receive energy from an external source, the at least one input port comprising at least on of: an AC connection, a DC connection and a USB connection (Paragraph 9). As to Claim 13, Jakins discloses the power station system as in claim 1, wherein the at least one output port comprises at least on of: an AC connection, a DC connection and a USB connection (Paragraph 25). As to Claim 14, Jakins discloses the power station system as in claim 1, wherein the power station system is configured to simultaneously provide energy and store energy (Paragraph 26). As to Claim 15, Jakins discloses the power station system as in claim 1, wherein the at least one energy storage device comprises at least one lithium-based battery (Paragraph 25). As to Claim 17, Jakins discloses the power station system as in claim 1, wherein the controller is configured to deactivate individual output ports of the at least one output port in order to, at least one of: limit output power; and maintain safe operation within individual port capacity or a capacity of the at least one inverter or energy conversion device (Paragraph 44-45). As to Claim 22, Jakins discloses a controller for a power station system, the power station system having at least one energy collector, at least one energy generator, at least one energy storage device , at least one inverter or energy conversion device and at least one output port, the controller comprising at least one processor; and at least one memory including computer program code, the at least one memory and the computer program code configured to, with the at least one processor, cause the controller to perform at least the following: to determine input power based on energy collected by the at least one energy collector and energy generated by the at least one energy generator, to determine output power based on the energy provided to the at least one energy output connection and to control the at least one energy generator based on the input power and the output power (Figure 3, Elements 102 and 104, Paragraphs 44-46). As to Claim 23, Jakins discloses the controller as in claim 22, wherein, when controlling the at least one energy generator, the controller is further configured to determine whether the at least one energy storage device has a threshold percentage of capacity (Paragraph 47). As to Claim 24, Jakins discloses the controller as in claim 23, wherein the controller is further configured to turn off the at least one energy generator in response to the at least one energy storage device exceeding the threshold percentage of capacity (Paragraph 45). As to Claim 25, Jakins discloses the controller as in claim 23, wherein the controller is further configured to turn on the at least one energy generator in response to the at least one energy storage device being less than the threshold percentage of capacity (Paragraph 45). As to Claim 26, Jakins discloses the controller as in claim 22, wherein, when controlling the at least one energy generator, the controller is further configured to determine whether the input power exceeds the output power (Paragraph 57). As to Claim 27, Jakins discloses the controller as in claim 26, wherein the controller is further configured to turn off the at least one energy generator in response to the input power exceeding the output power (Paragraph 57). As to Claim 28, Jakins discloses the controller as in claim 22, wherein the controller is embodied in an integrated circuit (Paragraph 43). As to Claim 29, Jakins discloses the controller as in claim 22, wherein the at least one energy storage device comprises a plurality of storage devices configured for one of: simultaneous energy storage, and sequential energy storage where each is sequentially depleted (Paragraph 60). As to Claim 30, Jakins discloses the controller as in claim 1, wherein, when controlling the at least one energy conversion device, the controller is further configured to determine and adjust maximum output so as not to exceed a capacity of the at least one energy storage device (Paragraph 25). As to Claim 31, Jakins discloses the controller as in claim 22, wherein the controller is configured to deactivate individual output ports of the at least one output port in order to, at least one of: limit output power; and maintain safe operation within individual port capacity or a capacity of the at least one inverter or energy conversion device (Paragraph 57). Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claims 11, 20, and 32 are rejected under 35 U.S.C. 103 as being unpatentable over Jakins et al in view of Sherry (US 10,389,121). As to Claim 11, Jakins discloses the power station system as in claim 1, but does not expressly disclose wherein the at least one energy generator comprises at least one propane generator. Sherry discloses at least one energy generator comprises at least one propane generator (Column 6, lines 11-27). It would have been obvious to one having ordinary skill in the art at the time of this invention to use a propane generator as disclosed by Sherry as a power generation device for the system of Jakins, as propane is a readily available and transportable fuel source. As to Claim 20, Jakins discloses the power station system as in claim 1, but does not expressly disclose further comprising a wireless communication element configured to enable remote operation and monitoring of the controller. Sherry discloses a wireless communication element configured to enable remote operation and monitoring of the controller (Column 13, line 4-7). It would have been obvious to one having ordinary skill in the art at the time of this invention to use a wireless communication device as taught by Sherry with the system of Jakins, in order to allow for remote monitoring of the system. As to Claim 32, Jakins discloses the controller as in claim 22, but does not expressly disclose wherein the controller is configured to communicate with a wireless interface to enable remote operation and monitoring of the controller. Sherry discloses a wireless communication element configured to enable remote operation and monitoring of the controller (Column 13, line 4-7). It would have been obvious to one having ordinary skill in the art at the time of this invention to use a wireless communication device as taught by Sherry with the system of Jakins, in order to allow for remote monitoring of the system. Claims 16, and 18-19 are rejected under 35 U.S.C. 103 as being unpatentable over Jakins et al. in view of Chang et al. (US 7,839,019). As to Claim 16, Jakins discloses the power station system as in claim 1, but does not expressly disclose wherein the power station system is one of: a modular power station system and a stand-alone power station system. Chang discloses wherein the power station system is one of: a modular power station system and a stand-alone power station system (Figure 2). It would have been obvious to one having ordinary skill in the art at the time of this invention to use a modular power station as taught by Chang and add it to the system of Jakins in order to allow for battery expansion. As to Claim 18, Jakins discloses the power station system as in claim 1, but does not expressly disclose further comprising at least one connector configured to enable modular connection and interconnection of the power station system, without respect to the assembly order and without user intervention to enable safe and proper operation. Chang discloses wherein the power station system is one of: a modular power station system and a stand-alone power station system (Figure 2). It would have been obvious to one having ordinary skill in the art at the time of this invention to use a modular power station as taught by Chang and add it to the system of Jakins in order to allow for battery expansion. As to Claim 19, Jakins discloses the power station system as in claim 1, but does not expressly disclose further comprising: an integrated voltage conversion circuit configured to convert energy stored in the at least one energy storage device in order to power a 12 V port to charge or jump start a 12V vehicle; appropriate safety circuitry for the integrated voltage conversion circuit; and a connector having clamps to connect to the vehicle. Chang discloses an integrated voltage conversion circuit configured to convert energy stored in the at least one energy storage device in order to power a 12 V port to charge or jump start a 12V vehicle; appropriate safety circuitry for the integrated voltage conversion circuit; and a connector having clamps to connect to the vehicle (Column 4, lines 24-38 and Claim 12). It would have been obvious to one having ordinary skill in the art at the time of this invention to add a jump start feature to the device of Jakins, as taught by Chang, in order to allow for the system to jump start a vehicle. Claim 21 is rejected under 35 U.S.C. 103 as being unpatentable over Jakins et al. in view of Parra Ortiz et al. (USPUB 2016/0023562). As to Claim 21, Jakins discloses the power station system as in claim 1, but does not expressly disclose further comprising a fast-charging interface enabling operation and communication with electric vehicle (EV) chargers. Parra Ortiz discloses a fast-charging interface enabling operation and communication with electric vehicle (EV) chargers (Figure 2). It would have been obvious to one having ordinary skill in the art at the time of this invention to take the teachings of Parra Ortiz’s EV charging, and add that to the device of Jakins in order to allow for an electric vehicle to be charged. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to ROBERT J GRANT whose telephone number is (571)270-5820. The examiner can normally be reached Monday - Friday 9am - 5:30pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Drew Dunn can be reached at (571)272-2312. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /ROBERT GRANT/Primary Examiner, Art Unit 2859
Read full office action

Prosecution Timeline

Mar 22, 2024
Application Filed
Oct 02, 2026
Non-Final Rejection mailed — §102, §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12771148
CHARGE/DISCHARGE POWER CONTROL DEVICE, ENERGY STORAGE SYSTEM, AND OPERATION METHOD OF ENERGY STORAGE SYSTEM
3y 7m to grant Granted Oct 20, 2026
Patent 12766996
BATTERY SWAP CONTROL METHOD AND SYSTEM, MEDIUM, APPARATUS, AND BATTERY CHARGING AND SWAP STATION
3y 6m to grant Granted Oct 20, 2026
Patent 12768891
INTELLIGENT RISK PREVENTION MODE FOR ABNORMAL BATTERY TEMPERATURE PREDICTION
3y 6m to grant Granted Oct 20, 2026
Patent 12765612
BATTERY ASSEMBLY FOR ELECTRONIC VAPORIZATION DEVICE AND ELECTRONIC VAPORIZATION DEVICE
3y 5m to grant Granted Oct 20, 2026
Patent 12763592
CHARGING CIRCUIT, CHARGING CONTROL METHOD, AND ELECTRONIC DEVICE
3y 6m to grant Granted Oct 13, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
76%
Grant Probability
94%
With Interview (+17.5%)
2y 11m (~4m remaining)
Median Time to Grant
Low
PTA Risk
Based on 807 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month