Prosecution Insights
Last updated: October 02, 2026
Application No. 18/620,018

HYDRAULIC BUMP STOP

Non-Final OA §102
Filed
Mar 28, 2024
Examiner
IRVIN, THOMAS W
Art Unit
4100
Tech Center
4100
Assignee
Fox Factory Inc.
OA Round
1 (Non-Final)
77%
Grant Probability
Favorable
1-2
OA Rounds
4m
Est. Remaining
92%
With Interview

Examiner Intelligence

Grants 77% — above average
77%
Career Allowance Rate
934 granted / 1207 resolved
+17.4% vs TC avg
Moderate +14% lift
Without
With
+14.5%
Interview Lift
resolved cases with interview
Typical timeline
2y 10m
Avg Prosecution
25 currently pending
Career history
1224
Total Applications
across all art units

Statute-Specific Performance

§101
0.7%
-39.3% vs TC avg
§103
41.8%
+1.8% vs TC avg
§102
35.8%
-4.2% vs TC avg
§112
20.2%
-19.8% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1207 resolved cases

Office Action

§102
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Election/Restrictions Applicants’ election without traverse of Species A (figs. 1 and 2) and Sub-Species 1(fig. 4A) in the reply filed on 07 July 2026 is acknowledged. Claims 3, 10, 12, 13, and 16 are hereby withdrawn from further consideration pursuant to 37 CFR 1.142(b) as being drawn to a nonelected embodiment, there being no allowable generic or linking claim. Applicants appear to have incorrectly indicated several claims as “withdrawn” in the response filed 07 July 2026. For clarification, the examiner notes that claims 8, 9, 11, and 19 are not withdrawn. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claims 1, 2, 4-7, and 11 are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Ericksen et al. (US 2025/0075769). In Re claim 1, Ericksen et al. disclose a hydraulic bump stop, comprising: a bump stop body (200) comprising a chamber (interior of 202); and a shaft (205) telescopically engaged with the bump stop body; a piston (266) slidably disposed with the bump stop body and coupled to a first end of the shaft, the piston comprising an orifice (see end of 210, and adjacent structure) for fluidly connecting the chamber to an interior of the shaft (see 235); and a flow controlling element (201, 301) coupled to the bump stop opposing the orifice and able to enter the orifice during operation, the flow controlling element having a varying width (see tapered end) such that a gap between the orifice and the flow control element varies according to a compression of the shaft, wherein a size of the gap impacts fluid flow through the orifice during operation. In Re claim 2, see tapered end of the flow controlling element (201, 301). In Re claims 4 and 6, see unlabeled shim stack in at least fig. 3. In Re claims 5 and 7, see flow controlling element (201, 301) in at least figs. 2C and 3. In Re claim 11, see bushing (valve 220 and retainer 215). The examiner notes that the intended use is not given patentable weight. Allowable Subject Matter Claims 14, 15, and 17-20 are allowed. Claims 8 and 9 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Any inquiry concerning this communication or earlier communications from the examiner should be directed to THOMAS W IRVIN whose telephone number is (571)270-3095. The examiner can normally be reached Monday - Friday 9am - 5pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Robert Siconolfi can be reached at 571-272-7124. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /THOMAS W IRVIN/ Primary Examiner, Art Unit 3616
Read full office action

Prosecution Timeline

Mar 28, 2024
Application Filed
Sep 01, 2026
Non-Final Rejection mailed — §102 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12746900
CONTROL APPARATUS FOR ELECTRIC BRAKE, ELECTRIC BRAKE APPARATUS, AND METHOD FOR CONTROLLING ELECTRIC BRAKE
3y 0m to grant Granted Sep 29, 2026
Patent 12747769
CONTROLLED DAMPER WITH PROPORTIONAL VALVE AND CROSS-FLOW BYPASS SLEEVE
3y 5m to grant Granted Sep 29, 2026
Patent 12747770
SHOCK ABSORBER
2y 5m to grant Granted Sep 29, 2026
Patent 12742483
BRAKE-WEAR MONITORING SYSTEM
2y 10m to grant Granted Sep 22, 2026
Patent 12735011
FRONT-MOUNTED TYPE RESERVOIR ASSEMBLY OF ELECTRONIC BRAKE SYSTEM
2y 5m to grant Granted Sep 15, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
77%
Grant Probability
92%
With Interview (+14.5%)
2y 10m (~4m remaining)
Median Time to Grant
Low
PTA Risk
Based on 1207 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month