Prosecution Insights
Last updated: November 22, 2026
Application No. 18/651,820

Method and System for Power Limiting in Buildings

Non-Final OA §103
Filed
May 01, 2024
Examiner
BARNES-BULLOCK, CRYSTAL JOY
Art Unit
2117
Tech Center
2100 — Computer Architecture & Software
Assignee
ABB Schweiz AG
OA Round
2 (Non-Final)
86%
Grant Probability
Favorable
2-3
OA Rounds
2m
Est. Remaining
73%
With Interview

Examiner Intelligence

Grants 86% — above average
86%
Career Allowance Rate
588 granted / 686 resolved
+30.7% vs TC avg
Minimal -13% lift
Without
With
+-13.1%
Interview Lift
resolved cases with interview
Typical timeline
2y 9m
Avg Prosecution
11 currently pending
Career history
697
Total Applications
across all art units

Statute-Specific Performance

§101
11.0%
-29.0% vs TC avg
§103
28.0%
-12.0% vs TC avg
§102
32.0%
-8.0% vs TC avg
§112
16.9%
-23.1% vs TC avg
Black line = Tech Center average estimate • Based on career data from 686 resolved cases

Office Action

§103
DETAILED ACTION The following is a Non-Final Office Action in response to the Amendment received on 14 September 2026. Claims 1, 3, 12 and 18 have been amended. Claims 2, 13 and 19 have been cancelled. Claims 1, 3-12, 14-18 and 20 remain pending in this application. Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claim(s) 1, 3-7, 12, and 14 is/are rejected under 35 U.S.C. 103 as being unpatentable over US 2017/0167742 A1 (USPN 10,101,050 B2) to Radovanovic et al. in view of US 2023/0291206 A1 to WINTER et al. As per claim 1, the Radovanovic et al. reference discloses a computer-implemented method for limiting power consumption comprising: receiving a power limit (see [0084], “maximum energy supply limits”) associated with a power limit mode (see 0106], “capacity events”); obtaining power consumption (see [0083], “energy consumption”) from one or more devices (see [0034], “each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) of a building (“residences 150A-150N”), each device (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) of the one or more devices (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) associated with a current sensor (see [0031], “one or more sensors”) for providing a current load (see [0111], “electrical load”) for the device (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”); obtaining a status (see [0033], “room-occupancy states, dim state, power state”) for each device (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) and historical consumption data (see [0123], “available historic data”) associated with each device (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”); determining a set of devices (see [0079], “subset of residences”) of the one or more devices (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) to disconnect (see [0117], “shed”) based at least in part on the power consumption (“energy consumption”) being greater than the power limit (“maximum energy supply limits”), the set of devices (“subset of residences”) determined based on an algorithm (see [0117], “DR events”) that uses the status (“room-occupancy states, dim state, power state”), the historical consumption data (“available historic data”), and the power limit (“maximum energy supply limits”) to calculate an anticipated power reduction (see [0117], “estimating an optimal amount of load capacity”) from disconnecting (“shed”) a particular combination (“subset of residences”) of the one or more devices (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) that reduces the power consumption (“energy consumption”) to less than or equal (see [0101], “quantify the amount of demand reduction”) to the power limit (“maximum energy supply limits”); wherein the set of devices is further determined based on generating a list of different combinations of devices of the set of devices using a priority of devices to be disconnected included in user preferences for each device of the set of devices, the particular combination included in the list of different combinations; and transmitting a signal (see [0084], “energy management system 830”), sequentially, for actuating an actuator (“control mechanism”) for a device (“electronic devices”) of the set of devices (“subset of residences”) to disconnect (“shed”) from a power source (see [0076], power source”) of the building (“residences 150A-150N”) while the power consumption (“energy consumption”) is greater than (see [0111], “greater than”) the power limit (“maximum energy supply limits”). The Radovanovic et al. reference does not expressly disclose the further limitations taught by the WINTER et al. reference, namely: the set of devices (see [0027], “N electrical loads L1, L2, L3, . . . , LN”) is further determined based on generating a list of different combinations of devices (see [0042], “prioritized ranking”) of the set of devices (“N electrical loads L1, L2, L3, . . . , LN”) using a priority of devices (see [0034], “load priority”) to be disconnected (“disconnect loads”) included in user preferences (“user interface 14”) for each device of the set of devices (“N electrical loads L1, L2, L3, . . . , LN”), the particular combination (see [0072], “user-defined sub-set”) included in the list of different combinations (“prioritized ranking”). Before the invention was filed, it would have been obvious to a person of ordinary skill in the art to modify the Model Predictive Control (MPC) scheduler taught by the Radovanovic et al. reference with the learning-based artificial intelligence taught by the WINTER et al. reference. One of ordinary skill in the art would have been motivated to modify the Model Predictive Control (MPC) scheduler with the learning-based artificial intelligence to the prioritized disconnection or shedding and/or reconnection of individual electrical loads to meet pre-defined energy-related preferences and/or goals based on inputs and/or measurements with or without further data processing. As per claim 3, the WINTER et al. reference discloses a plurality of devices of the set of devices are of a same priority as specified in the user preferences (see [0034], “assign load priority to each load L1, L2, L3, . . . , LN, or to a group of the loads”), and wherein the power limit is specified in the user preferences (see [0003], “limit its usage”). As per claim 4, the Radovanovic et al. reference discloses determining that thermal control loads (see [0106], “HVAC load”) are on and that a temperature (“temperatures in the range 70°-74° F. under normal circumstances”) for a thermal control load device (“HVAC load”) is different than a conservation temperature (“slightly higher temperatures”), the thermal control load device (“HVAC load”) of the one or more devices (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”); and transmitting another signal (“energy management system 830”) to the thermal control load device (“HVAC load”) to change the temperature (“temperatures”) to the conservation temperature (“slightly higher temperatures”). As per claim 5, the Radovanovic et al. reference discloses determining the set of devices (“subset of residences”) to disconnect (“shed”) based at least in part on the power consumption (“energy consumption”) being greater than the power limit (“maximum energy supply limits”) occurs subsequent (see [0112], “each subsequent time interval”) to determining that thermal control loads (“HVAC load”) are on and that the temperature (“temperatures in the range 70°-74° F. under normal circumstances”) for a thermal control load device (“HVAC load”) is different than a conservation temperature (“slightly higher temperatures”). As per claim 6, the Radovanovic et al. reference discloses determining the set of devices (“subset of residences”) to disconnect (“shed”) based at least in part on the power consumption (“energy consumption”) being greater than the power limit (“maximum energy supply limits”) occurs upon expiration of a certain time period (see [0112], “each subsequent time interval expires”) after transmitting the another signal (“energy management system 830”) to the thermal control load device (“HVAC load”) to change the temperature (“temperatures”) to the conservation temperature (“slightly higher temperatures”). As per claim 7, the Radovanovic et al. reference discloses obtaining a voltage (see [0069], “voltage Vcc”) of the building (“residences 150A-150N”) from a voltage sensor (“powering circuitry 710”), and wherein the algorithm (“DR events”) further uses the voltage (“voltage Vcc”) to determine the set of devices (“subset of residences”). As per claim 12, the Radovanovic et al. reference discloses a computer system for limiting power consumption, the computer system comprising one or more hardware processors (see [0129], “processing units”) which, alone or in combination, are configured to provide for execution (“perform the functions”) of the following steps: receiving a power limit (see [0084], “maximum energy supply limits”) associated with a power limit mode (see 0106], “capacity events”); obtaining power consumption (see [0083], “energy consumption”) from one or more devices (see [0034], “each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) of a building (“residences 150A-150N”), each device (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) of the one or more devices (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) associated with a current sensor (see [0031], “one or more sensors”) for providing a current load (see [0111], “electrical load”) for the device (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”); obtaining a status (see [0033], “room-occupancy states, dim state, power state”) for each device (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) and historical consumption data (see [0123], “available historic data”) associated with each device (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”); determining a set of devices (see [0079], “subset of residences”) of the one or more devices (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) to disconnect (see [0117], “shed”) based at least in part on the power consumption (“energy consumption”) being greater than the power limit (“maximum energy supply limits”), the set of devices (“subset of residences”) determined based on an algorithm (see [0117], “DR events”) that uses the status (“room-occupancy states, dim state, power state”), the historical consumption data (“available historic data”), and the power limit (“maximum energy supply limits”) to calculate an anticipated power reduction (see [0117], “estimating an optimal amount of load capacity”) from disconnecting (“shed”) a particular combination (“subset of residences”) of the one or more devices (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”) that reduces the power consumption (“energy consumption”) to less than or equal (see [0101], “quantify the amount of demand reduction”) to the power limit (“maximum energy supply limits”); wherein the set of devices is further determined based on generating a list of different combinations of devices of the set of devices using a priority of devices to be disconnected included in user preferences for each device of the set of devices, the particular combination included in the list of different combinations; and transmitting a signal (see [0084], “energy management system 830”), sequentially, for actuating an actuator (“control mechanism”) for a device (“electronic devices”) of the set of devices (“subset of residences”) to disconnect (“shed”) from a power source (see [0076], power source”) of the building (“residences 150A-150N”) while the power consumption (“energy consumption”) is greater than (see [0111], “greater than”) the power limit (“maximum energy supply limits”). The Radovanovic et al. reference does not expressly disclose the further limitations taught by the WINTER et al. reference, namely: the set of devices (see [0027], “N electrical loads L1, L2, L3, . . . , LN”) is further determined based on generating a list of different combinations of devices (see [0042], “prioritized ranking”) of the set of devices (“N electrical loads L1, L2, L3, . . . , LN”) using a priority of devices (see [0034], “load priority”) to be disconnected (“disconnect loads”) included in user preferences (“user interface 14”) for each device of the set of devices (“N electrical loads L1, L2, L3, . . . , LN”), the particular combination (see [0072], “user-defined sub-set”) included in the list of different combinations (“prioritized ranking”). Before the invention was filed, it would have been obvious to a person of ordinary skill in the art to modify the Model Predictive Control (MPC) scheduler taught by the Radovanovic et al. reference with the learning-based artificial intelligence taught by the WINTER et al. reference. One of ordinary skill in the art would have been motivated to modify the Model Predictive Control (MPC) scheduler with the learning-based artificial intelligence to the prioritized disconnection or shedding and/or reconnection of individual electrical loads to meet pre-defined energy-related preferences and/or goals based on inputs and/or measurements with or without further data processing. As per claim 14, the Radovanovic et al. reference discloses determining that thermal control loads (see [0106], “HVAC load”) are on and that a temperature (“temperatures in the range 70°-74° F. under normal circumstances”) for a thermal control load device (“HVAC load”) is different than a conservation temperature (“slightly higher temperatures”), the thermal control load device (“HVAC load”) of the one or more devices (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”); and transmitting another signal (“energy management system 830”) to the thermal control load device (“HVAC load”) to change the temperature (“temperatures”) to the conservation temperature (“slightly higher temperatures”). Claim(s) 18 is/are rejected under 35 U.S.C. 103 as being unpatentable over US 2025/0132590 A1 to Shaton et al. in view of US 2023/0291206 A1 to WINTER et al. As per claim 18, the Shaton et al. reference discloses a computer-implemented method for limiting power consumption comprising: obtaining a signal (see [0057], “control signals”) that corresponds to a power outage mode (see [0058], “storage operational mode”) for a building (see [0052], “premises 118”); obtaining maximum power limit (see [0204], “maximum discharge power”) for a battery (“energy storage device(s) 104”) of the building (“premises 118”) and a state of charge (see [0062], “charge or discharge”) for the battery (“energy storage device(s) 104”); obtaining power consumption (see [0196], “power consumption level”) from one or more devices (“one or more load devices”) of the building (“premises 118”) which are utilizing power (“power”) from the battery (“energy storage device(s) 104”); determining a set of devices (see [0062], “one or more loads”) of the one or more devices (“one or more load devices”) that are not currently (“power source 102”) utilizing the power (“power”) from the battery (“energy storage device(s) 104”) to connect (see [0061], “storage interface 106”) to the battery (“energy storage device(s) 104”) based at least in part on the power consumption (“power consumption level”) being less than (see [0204], “lower than”) the maximum power limit (“maximum discharge power”), the set of devices (“one or more loads”) determined based on an algorithm (see [0064], “predictions generator 120”) that uses historical consumption data (“historical data”) from the set of devices (“one or more of 118-1 through 118-4”), user preferences (see [0066], “optimization objective selection 143, total savings 150”), and the maximum power limit (“maximum discharge power”) to calculate an anticipated power usage (see [0102], “energy consumption prediction”) from connecting a particular combination (“one or more of 118-1 through 118-4”) of the one or more devices (“one or more load devices”) that maintains the power consumption (“power consumption level”) to less than (“lower than”) the maximum power limit (“maximum discharge power”); wherein the set of devices is further determined based on generating a list of different combinations of devices of the set of devices using a priority of devices to be reconnected included in the user preferences for each device of the set of devices and that a state of charge for the battery is greater than a minimum percentage state of charge for the battery, the particular combination included in the list of different combinations; and transmitting a signal (“predicted peak demand”), sequentially, for actuating an actuator (“controller 110”) for a device of the set of devices (“one or more of 118-1 through 118-4”) to connect to the battery (“energy storage device(s) 104”) while the power consumption (“power consumption level”) is less than (“lower than”) the maximum power limit (“maximum discharge power”). The Shaton et al. reference does not expressly disclose the further limitations taught by the WINTER et al. reference, namely: the set of devices (see [0027], “N electrical loads L1, L2, L3, . . . , LN”) is further determined based on generating a list of different combinations of devices (see [0042], “prioritized ranking”) of the set of devices (“N electrical loads L1, L2, L3, . . . , LN”) using a priority of devices (see [0034], “load priority”) to be reconnected (see [0069], “reconnect any of the managed loads L1, L2, L3, . . . , LN”) included in user preferences (“user interface 14”) for each device of the set of devices (“N electrical loads L1, L2, L3, . . . , LN”) and that a state of charge for the battery (see [0035], “maximum energy state or condition”) is greater than a minimum percentage state of charge for the battery (“minimum energy state or condition”), the particular combination (see [0072], “user-defined sub-set”) included in the list of different combinations (“prioritized ranking”). Before the invention was filed, it would have been obvious to a person of ordinary skill in the art to modify the prediction generator taught by the Shaton et al. reference with the learning-based artificial intelligence taught by the WINTER et al. reference. One of ordinary skill in the art would have been motivated to modify the prediction generator with the learning-based artificial intelligence to the prioritized disconnection or shedding and/or reconnection of individual electrical loads to meet pre-defined energy-related preferences and/or goals based on inputs and/or measurements with or without further data processing. Claim(s) 20 is/are rejected under 35 U.S.C. 103 as being unpatentable over US 2025/0132590 A1 to Shaton et al. in view of US 2023/0291206 A1 to WINTER et al., and further in view of US 2017/0167742 A1 (USPN 10,101,050 B2) to Radovanovic et al. As per claim 20, neither the Shaton et al. reference nor WINTER et al. reference does not expressly disclose the limitations taught by the Radovanovic et al. reference, namely: determining that thermal control loads (see [0106], “HVAC load”) are on and that a temperature (“temperatures in the range 70°-74° F. under normal circumstances”) for a thermal control load device (“HVAC load”) is different than a conservation temperature (“slightly higher temperatures”), the thermal control load device (“HVAC load”) of the one or more devices (“each of the devices 102, 104, 106, 108, 110, 112, 114 and 116”); and transmitting another signal (“energy management system 830”) to the thermal control load device (“HVAC load”) to change the temperature (“temperatures”) to the conservation temperature (“slightly higher temperatures”). Before the invention was filed, it would have been obvious to a person of ordinary skill in the art to further modify the premises and households taught by the Shaton et al. and WINTER et al. references with the residences taught by the Radovanovic et al. reference. One of ordinary skill in the art would have been motivated to modify the premises and households with the residences to illustrate additional load devices which may be controlled by controller in the power system. Allowable Subject Matter Claims 8-11 and 15-17 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. The following is a statement of reasons for the indication of allowable subject matter: As per claims 8 and 15, the prior art of record taken alone or in combination fails to teach determining that a particular device of the one or more devices has been manually connected to a power source of the building by a user in response to determining that the power consumption is greater than the power limit; transmitting a notification to a user device of the user identifying the manual connection of the particular device and a status that the power consumption is greater than the power limit; and disconnecting a certain device of the one or more devices based on a priority of devices to be disconnected included in user preferences for each device of the set of devices. As per claims 9 and 16, the prior art of record taken alone or in combination fails to teach determining that the power limit mode has ceased; determining a sequence to reconnect the set of devices that were disconnected based on the power consumption being greater than the power limit, the sequence determined based at least in part on user preferences; and transmitting signals to the set of devices to reconnect each device of the set of devices to the power source of the building according to the sequence. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. The following references are cited to further show the state of the art with respect to dynamic power load management: US 11580610 B2 to Abu-Rejailah; Adel et al. US 7062361 B1 to Lane US 4916328 A to Culp III CN 108287486 A to KARL et al. AU 2011258874 A1 to RALEIGH et al. Any inquiry concerning this communication or earlier communications from the examiner should be directed to Crystal J Barnes-Bullock whose telephone number is (571)272-3679. The examiner can normally be reached Monday - Friday 8 am - 5 pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Robert Fennema can be reached at 571-272-2748. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /CRYSTAL J BARNES-BULLOCK/Primary Examiner, Art Unit 2117 3 November 2026
Read full office action

Prosecution Timeline

May 01, 2024
Application Filed
Jun 23, 2026
Non-Final Rejection mailed — §103
Sep 14, 2026
Response Filed
Nov 04, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12800173
BUILDING SYSTEM WITH MULTI-TIERED MODEL BASED OPTIMIZATION FOR VENTILATION AND SETPOINT CONTROL
3y 5m to grant Granted Nov 17, 2026
Patent 12774825
Building as an Instrumentation for Data-Driven Building Operation
3y 4m to grant Granted Oct 27, 2026
Patent 12766995
INFORMATION PROCESSING METHOD
2y 10m to grant Granted Oct 20, 2026
Patent 12765475
HAND-HELD VAPOR PRESSURE DEFICIT MEASURING AND CONTROLLING DEVICE AND METHOD
2y 6m to grant Granted Oct 20, 2026
Patent 12756225
ELECTRIC POWER MANAGEMENT SYSTEM
2y 3m to grant Granted Oct 06, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

2-3
Expected OA Rounds
86%
Grant Probability
73%
With Interview (-13.1%)
2y 9m (~2m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 686 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month