Prosecution Insights
Last updated: October 23, 2026
Application No. 18/653,686

INFORMATION DETERMINING METHOD AND APPARATUS, TERMINAL, AND READABLE STORAGE MEDIUM

Final Rejection §103
Filed
May 02, 2024
Priority
Nov 05, 2021 — CN 202111306433.6 +1 more
Examiner
CHOWDHURY, MAHBUBUL BAR
Art Unit
2475
Tech Center
2400 — Computer Networks
Assignee
Vivo Mobile Communication Co., Ltd.
OA Round
2 (Final)
84%
Grant Probability
Favorable
3-4
OA Rounds
0m
Est. Remaining
98%
With Interview

Examiner Intelligence

Grants 84% — above average
84%
Career Allowance Rate
266 granted / 318 resolved
+25.6% vs TC avg
Moderate +15% lift
Without
With
+14.9%
Interview Lift
resolved cases with interview
Typical timeline
2y 4m
Avg Prosecution
33 currently pending
Career history
355
Total Applications
across all art units

Statute-Specific Performance

§101
1.8%
-38.2% vs TC avg
§103
52.0%
+12.0% vs TC avg
§102
19.4%
-20.6% vs TC avg
§112
22.7%
-17.3% vs TC avg
Black line = Tech Center average estimate • Based on career data from 318 resolved cases

Office Action

§103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Response to Amendment The following is a final office action in response to applicant’s reply, filed on 08/10/2026, to the Non-Final Office Action mailed on 05/08/2026. Claims 1, 4, 6, 9, 12, 15, 18, and 20 are amended. Claims 2 and 13 are canceled. Claims 21 and 22 are added. Claims 1, 3-12, and 14-22 are pending and addressed below. Applicant’s amendment has overcome objections, previously set forth in the non-final office action. Claim Rejections - 35 USC § 103 Claims 1, 3-4, 5-6, 8, 11-12, 14-17 and 19-22 are rejected under 35 U.S.C. 103 as being unpatentable over IDS reference, NPL R1-2109685, NTT DOCOMO, INC., Discussion on reduced maximum UE bandwidth for RedCap, 3GPP TSG RAN WG1 #106bis-e e-Meeting, October 11th - 19th, 2021, hereinafter NPL-N, in view of Matsumura; Yuki et al US 20240397510 A1, hereinafter Matsumura. Regarding claims 1, 12 and 20, NPL-N teaches, an information determining method, comprising: determining, by a terminal, a physical uplink control channel (PUCCH) resource configured for the terminal on a first initial uplink bandwidth part (BWP); and determining, by the terminal, a physical resource block (PRB) index of the PUCCH resource based on a first PRB offset in a case that frequency hopping of the PUCCH resource is disabled (NPL-N Section 2.2 and proposal 2 “When intra-slot PUCCH frequency hopping within the separate initial UL BWP in the PUCCH resource for HARQ feedback for Msg4/MsgB for RedCap UEs is disabled, UE determines the PRB index of the PUCCH transmission as PNG media_image1.png 112 602 media_image1.png Greyscale ”, teaches determination of PUCCH resource along with its PRB index, when hopping is disabled within a separate initial UL BWP, and PRB index is based on (P)RB offset). NPL-N does not expressly teach, however, in the same field of endeavor, Matsumura teaches, wherein the first PRB offset comprises: an additional PRB offset configured by a network-side device through higher- layer signaling (“additional PRB offset” is interpreted, in line with the Spec. e.g., para [48], as a separate or different PRB offset. Matsumura [102] “in a case where the frequency hopping is indicated to be disabled by an upper layer …, as illustrated in FIG. 21, the UE … may apply the UE-specific PRB offset in the upward direction from a lower end of the separate UL-initial BWP supported by the RedCap UE by using a value indicating the UE-specific PRB offset, in a case where the hopping direction is 0, and may apply the UE-specific PRB offset in the downward direction from an upper end of the separate UL-initial BWP supported by the RedCap UE in a case where the hopping direction is 1.”, teaching a “UE-specific PRB offset”, which is a different PRB offset, in case of RedCap BW and disbabled frequency hopping; [69] “… a predetermined PRB offset may be added for a UE … . The predetermined value … may be configured by an upper layer (RRC. SIB, or the like).”, teaches PRB offset is configured by a higher layer). Therefore, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the invention of NPL-N to include the features as taught by Matsumura above to enable efficient coexistence between function-reduced terminals and normal terminals in the wireless communication system (Matsumura [0006]). With respect to claim 12, claim recites the identical features of claim 1 for a corresponding terminal. Therefore, it is subjected to the same rejection. UE of NPL-N inherently comprises a processor, a memory. With respect to claim 20, claim recites the identical features of claim 1 for a corresponding non-transitory readable storage medium. Therefore, it is subjected to the same rejection. Regarding claims 3 and 14, NPL-N, in view of Matsumura, teaches the method/terminal, as outlined in the rejection of claims 1 and 12. Matsumura further teaches, wherein the first PRB offset is: an offset relative to a starting position of the first initial uplink BWP; or an offset relative to an ending position of the first initial uplink BWP (see Matsumura Figs. 20-22; [51] “A resource in which a PRB offset and a UE-specific PRB offset is added at the lower end of an initial active UL-BWP (Bandwidth Part) and a resource in which the PRB offset and the UE-specific offset are reduced at the upper end are used as the PUCCH resource.”). Regarding claims 4, 15 and 21, NPL-N, in view of Matsumura, teaches the method/terminal, as outlined in the rejection of claims 3, 14 and 20. Matsumura further teaches, wherein the first PRB offset being an offset relative to a starting position of the first initial uplink BWP; or being an offset relative to an ending position of the first initial uplink BWP is configured by the network-side device (Implied in Matsumura [69]). Regarding claims 5, 16 and 22, NPL-N, in view of Matsumura, teaches the method/terminal, as outlined in the rejection of claims 1, 12 and 20. NPL-N further teaches, wherein the PRB index of the PUCCH PNG media_image2.png 84 946 media_image2.png Greyscale PNG media_image3.png 182 938 media_image3.png Greyscale (See NPL-N Section 2.2, page 8, “ PNG media_image1.png 112 602 media_image1.png Greyscale ”). Regarding claim 6, NPL-N, in view of Matsumura, teaches the method, as outlined in the rejection of claim 1. NPL-N further teaches, PNG media_image4.png 460 684 media_image4.png Greyscale (See various equations in NPL-N Section 2.2, page 8. Satisfies “or” criteria of the claim). Regarding claims 8 and 17, NPL-N, in view of Matsumura, teaches the method/terminal, as outlined in the rejection of claims 1 and 12. NPL-N further teaches, wherein the method further comprises: in a case that frequency hopping is enabled for the PUCCH resource, determining, by the terminal based on a second PRB offset, a first PRB index of the PUCCH resource in a first hop and a second PRB index of the PUCCH resource in a second hop; wherein PNG media_image5.png 366 952 media_image5.png Greyscale (NPL-N Section 2.2, page 7 “According to Clause 9.2.1 in TS38.213 as below, hopping direction is indicated via rpucch (0<=rpucch<=15)”, page 8, lines 1-12, teaches equations for PRB index, in case of frequency hopping). Regarding claims 11 and 19, NPL-N, in view of Matsumura, teaches the method/terminal, as outlined in the rejection of claims 1 and 12. NPL-N further teaches, wherein the terminal is a reduced capability RedCap terminal, and the first initial uplink BWP is a separate initial uplink BWP configured for the RedCap terminal (see NPL-N Section 2.1 “Separate initial DU/UL BWPs for RedCap UEs”, teaching the UE is RedCap (=Reduced Capability) UE, and is configure with a separate initial UL BWP). Claim Rejections - 35 USC § 103 Claims 7, 9-10, and 18 are rejected under 35 U.S.C. 103 as being unpatentable over NPL-N, as applied to claims 1 and 12 rejections above, in view of Okano; Mayuko et al US 20240334435 A1, hereinafter Okano. Regarding claim 7, NPL-N, in view of Matsumura, teaches the method, as outlined in the rejection of claim 6. NPL-N and Matsumura do not expressly teach, however, in the same field of endeavor, Okano teaches, PNG media_image6.png 26 362 media_image6.png Greyscale PNG media_image7.png 136 654 media_image7.png Greyscale (“X” is interpreted, in line with Spec para [54] as number of PRB offsets. Okano [122] teaches PRB offset is configured by the base station i.e., by the network-side device. Satisfies “or” criteria of the claim). Therefore, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the invention of NPL-N to include the features as taught by Okano above in order to provide a technique that enables a terminal to perform transmission on an uplink control channel using RBs the number of which is larger than one (Okano [9]). Regarding claims 9 and 18, NPL-N, in view of Matsumura, teaches the method/terminal, as outlined in the rejection of claims 8 and 17. Matsumura further teaches, a PRB offset configured by the network-side device through higher-layer signaling (see Matsumura [69]). NPL-N and Matsumura do not expressly teach, however, in the same field of endeavor, Okano teaches, wherein the second PRB offset comprises: a PRB offset corresponding to a PUCCH resource set index indicated by a network-side device, wherein the PUCCH resource set index is used to indicate a common PUCCH resource set configured for the terminal (Okano [76] teaches PUCCH resource set including PRB offset is configured by base station with pucch_ResourceCommon); or a PRB offset configured by the network-side device through higher-layer signaling. Therefore, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the invention of NPL-N to include the features as taught by Okano above in order to provide a technique that enables a terminal to perform transmission on an uplink control channel using RBs the number of which is larger than one (Okano [9]). Regarding claim 10, NPL-N, in view of Matsumura, teaches the method, as outlined in the rejection of claim 8. NPL-N and Matsumura do not expressly teach, however, in the same field of endeavor, Okano teaches, wherein the second PRB offset is: an offset relative to a starting position of the first initial uplink BWP; or an offset relative to an ending position of the first initial uplink BWP (Okano [152] teaches PRB offset is from left or right end of the UL BWP i.e., starting and ending position of UL BWP). Therefore, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the invention of NPL-N to include the features as taught by Okano above in order to provide a technique that enables a terminal to perform transmission on an uplink control channel using RBs the number of which is larger than one (Okano [9]). Response to Arguments Applicant’s arguments with respect to claim 1 have been considered but are moot because the new ground of rejection does not rely on any reference applied in the prior rejection of record for any teaching or matter specifically challenged in the argument. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. FEI; Yongqiang, US 20240049205 A1 - CHANNEL TRANSMISSION METHOD AND APPARATUS, TERMINAL DEVICE, NETWORK DEVICE, AND STORAGE MEDIUM; reads on the amended claim 1. IDS Reference, KUNDU; Lopamudra US 20220086824 A1 - RESOURCE ALLOCATION FOR PHYSICAL UPLINK CONTROL CHANNEL DURING INITIAL ACCESS IN NR-UNLICENSED. Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any extension fee pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to MAHBUBUL BAR CHOWDHURY whose telephone number is (571)272-0232. The examiner can normally be reached on Monday-Thursday 9AM-5PM EST; Friday variable. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Khaled Kassim can be reached on 571-270-3770. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /MAHBUBUL BAR CHOWDHURY/Primary Examiner, Art Unit 2475
Read full office action

Prosecution Timeline

May 02, 2024
Application Filed
May 08, 2026
Non-Final Rejection mailed — §103
Aug 10, 2026
Response Filed
Oct 08, 2026
Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12771511
DETAILS FOR 8 PORTS SRS MAPPING TO MULTIPLE OFDM SYMBOLS
2y 10m to grant Granted Oct 20, 2026
Patent 12756504
METHOD AND DEVICE FOR SUPPORTING SIDELINK DRX ON BASIS OF MODE 1 CG RESOURCE IN NR V2X
3y 5m to grant Granted Oct 06, 2026
Patent 12745059
Reference Signal Configuration for Location Estimation of Reduced Capacity Devices
4y 1m to grant Granted Sep 22, 2026
Patent 12732323
TERMINAL AND COMMUNICATION METHOD
2y 11m to grant Granted Sep 08, 2026
Patent 12713367
METHODS FOR COMMUNICATING SYNCHRONIZATION SIGNALS USING CYCLIC SHIFTS
3y 2m to grant Granted Aug 18, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
84%
Grant Probability
98%
With Interview (+14.9%)
2y 4m (~0m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 318 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month