Application No. 18/676,863

Electrolyzer Systems and Methods of Operation for Supporting Stability of a Power Grid

Non-Final OA §102
Filed
May 29, 2024
Priority
Dec 08, 2021 — DK PA 2021 01164 +1 more
Examiner
D'ANIELLO, NICHOLAS P
Art Unit
1725
Tech Center
1700 — Chemical & Materials Engineering
Assignee
Stiesdal Hydrogen A/S
OA Round
1 (Non-Final)
68%
Grant Probability
Favorable
1-2
OA Rounds
9m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 68% — above average
68%
Career Allowance Rate
606 granted / 888 resolved
+3.2% vs TC avg
Strong +41% interview lift
Without
With
+41.4%
Interview Lift
resolved cases with interview
Typical timeline
3y 2m
Avg Prosecution
49 currently pending
Career history
951
Total Applications
across all art units

Statute-Specific Performance

§101
0.1%
-39.9% vs TC avg
§103
59.8%
+19.8% vs TC avg
§102
18.7%
-21.3% vs TC avg
§112
12.4%
-27.6% vs TC avg
Black line = Tech Center average estimate • Based on career data from 888 resolved cases

Office Action

§102
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Election/Restrictions Applicant’s election without traverse of Group I, claims 1-5 in the reply filed on 18 September 2026 is acknowledged. Upon allowance of the apparatus claims, rejoinder of the method claims will be considered. Relevant MPEP Sections MPEP 2114 relating to Apparatus and Article claims – Functional Language: While features of an apparatus may be recited either structurally or functionally, claims directed to an apparatus must be distinguished from the prior art in terms of structure rather than function. >In re Schreiber, 128 F.3d 1473, 1477-78, 44 USPQ2d 1429, 1431-32 (Fed. Cir. 1997) MPEP 2115: "Expressions relating the apparatus to contents thereof during an intended operation are of no significance in determining patentability of the apparatus claim." Ex parte Thibault, 164 USPQ 666, 667 (Bd. App. 1969). Furthermore, "[i]nclusion of material or article worked upon by a structure being claimed does not impart patentability to the claims." In re Young, 75 F.2d *>996<, 25 USPQ 69 (CCPA 1935) (as restated in In re Otto, 312 F.2d 937, 136 USPQ 458, 459 (CCPA 1963)). Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claims 1-5 are rejected under 35 U.S.C. 102(a)(1 or 2) as being anticipated by Xing et al. (“Time-Varying Model Predictive Control of a Reversible-SOC Energy-Storage Plant Based on the Linear Parameter-Varying Method” cited in IDS). In regard to claim 1, Xing et al. teach an electrolyzer system comprising: a stack of electrolyzer modules (reversible solid oxide cells - rSOCs stack, figure 1 below) for producing hydrogen gas from water, each module comprising a pair of electrodes sandwiching a membrane therebetween (The SOC stack splits H2O using electricity (electrolysis mode) or oxidizes H2 to generate power (fuel cell mode) – page 1949 I. Introduction); an inverter system (“Converter” in figure 1 below) that is electrically connected to the stack of electrolyzer modules and electrically connected to an electrical power grid (Pgrid in figure 1 below); a control system (time varying Model predictive control (MPC)) that is functionally connected to the inverter system for controlling the inverter system (“A time-varying MPC formulation is proposed to optimize the coordination of BoP components during the transient process (such as mode switching) to ensure security and to improve the full-time performance of the plant for energy storage dispatch” page 1590, second column) wherein the electrolyzer system is configured for electrically supporting stability of the power grid by three different support modes during power deviations from a predetermined operation state of the power grid for counteracting the power deviations (“Balance of Plant (BoP) Submodel: As shown in Fig. 1, the BoP components make up an energy-flow interface between the SOC stack and the power grid and serve as necessary actuators to control the stack operation”); wherein the electrolyzer system in a first support mode A is configured for varying import of electrical energy from the power grid in response to the power deviations (BoP operation); wherein the electrolyzer system in a second support mode B is configured for capacitor function (“The DC-side capacitor Cdc is used to attenuate the voltage ripple on the stack of the electrolyzer modules in the stack” page 1950), wherein the electrolyzer modules switch from an electrically charged operational state to a discharged state, wherein the electrical power from discharging is exported through the inverter into the power grid for stabilizing unwanted short-term variations of the power in the power grid (“C. Long-Term Optimization: Scenarios B and C A steady OP is never reached in Scenario A because 4s is far too small for T to stabilize. Therefore, we simulated 1200 s after the rSOC plant steps to a new power load in Scenarios B and C to observe the long-term transient process to the new OP. The process is depicted in Fig. 7 and Fig. 9.” – long term power stabilization described on page 1596); and wherein the electrolyzer system in a third support mode C is configured for switching instantly from a hydrogen production mode into a fuel cell mode, wherein gas (N2, H2 and O2) at the electrodes of the electrolyzer module is combined through the membrane and converted back into water inside the module (Short-Term Tracking and Switching: Scenario A “In Scenario A, we simulated five AGC periods (20s in total) to observe the short-term transient process when the rSOC plant is tracking the desired Pgrid,ref and occasionally switching between the electrolysis mode and the fuel cell mode.” Page 1595). See figure 1 annotated below, pages 1591-1598 which show predictive MPC control of the system depending on many conditions and results shown in Figure 12. PNG media_image1.png 490 1161 media_image1.png Greyscale The prior art teaches all of the claimed operational characteristics, however in any event, the Examiner notes that the operational characteristics of the system and materials worked upon (i.e. hydrogen, oxygen, electricity) relate to functional limitations and materials worked upon by the system which do not structurally distinguish the claims from the prior art (see MPEP 2114 and 2115 above). In regard to claim 2, Xing et al. teach the electrolyzer system according to claim 1, wherein the three different support modes are carried out one after the other with the first support mode A reducing the power import to zero (I(A) = 0 in figure 12), then reversing power back into the power grid within tens of milliseconds in the second support mode B (“Because the time constant of a built-in current controller is typically tens of milliseconds…” Page 1591, second column), then continuing reverse flow of electricity into the power grid by fuel cell action in the third support mode C, and then, after recovery of the power grid, returning to consumption for the hydrogen gas production (power is being produced again after switching back to electrolysis mode, see conditions shown in Figure 12). In regard to claim 3, Xing et al. teach the electrolyzer system according to claim 1, wherein the electrolyzer system is programmed to trigger a recovery mode for power support of the power grid in dependence of measured parameters, the parameters including frequency of the power grid (“For example, the plant provides frequency regulation service by tracking the automatic generation control (AGC) signal in Scenario A.” page 1595). In regard to claim 4, Xing et al. teach the electrolyzer system according to claim 1, wherein the electrolyzer system is programmed to trigger a recovery mode for power support of the power grid in dependence of measured parameters, the parameters including voltage of the power grid (see Figure 12, note “P,I,U Power, current, voltage or overvoltage” in Nomenclature section, first page). In regard to claim 5, Xing et al. teach the electrolyzer system according to claim 1, wherein the control system (predictive MPC) of the electrolyzer system comprises a data interface (current, voltage and temperature sensors) for receiving external data, the external data comprising information about at least one of an actual state of the power grid and an expected future state of the power grid (see page 1595, predictive modeling described throughout IV.MODEL PREDICTIVE CONTROL FORMULATION, such as predictive model below). PNG media_image2.png 339 786 media_image2.png Greyscale Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Uechi et al. (US Pub 20210143645 newly cited) teaches a similar SOFC/Electrolyzer connected to the power grid and electricity generation control. Any inquiry concerning this communication or earlier communications from the examiner should be directed to NICHOLAS P D'ANIELLO whose telephone number is (571)270-3635. The examiner can normally be reached Monday to Friday 9am to 5pm EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Tong Guo can be reached at 571-272-3066. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /NICHOLAS P D'ANIELLO/Primary Examiner, Art Unit 1723
Read full office action

Prosecution Timeline

May 29, 2024
Application Filed
Oct 21, 2026
Non-Final Rejection mailed — §102 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12782446
BATTERY STATE DETECTION DEVICE AND BATTERY PROTECTION DEVICE
3y 9m to grant Granted Nov 03, 2026
Patent 12776541
ENERGY STORAGE DEVICE
1y 7m to grant Granted Oct 27, 2026
Patent 12768057
URBAN DENSELY PACKED HYDROGEN GENERATION
4y 6m to grant Granted Oct 20, 2026
Patent 12770971
BATTERY PACK, ENERGY STORAGE SYSTEM, AND VEHICLE
3y 8m to grant Granted Oct 20, 2026
Patent 12770993
METHOD FOR PRODUCING BATTERY MODULE
2y 8m to grant Granted Oct 20, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
68%
Grant Probability
99%
With Interview (+41.4%)
3y 2m (~9m remaining)
Median Time to Grant
Low
PTA Risk
Based on 888 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month