DETAILED ACTION
Notice of Pre-AIA or AIA Status
The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA .
Claim Rejections - 35 USC § 102
The text of those sections of Title 35, U.S. Code not included in this action can be found in a prior Office action.
Claims 41, 43, and 45 – 47 are rejected under 35 U.S.C. 102(a)(1) as being anticipated by0 US Patent Application Publication No. 2007/0028769 to Eplee et al. (hereinafter referred to as Eplee).
In regard to claim 41, as shown in figure 2, Eplee discloses an apparatus (100) for producing water. The apparatus includes flow paths for hot dry air (F1, G1), humified hot air (A1), humidified cool air (B1), and cold dry air (C1) in a closed-loop. A desiccant (126) is adapted to adsorb moisture form an external airflow (H1) to yield a first water saturated desiccant. A reactor (124) comprises the desiccant. The reactor (124) allows for flowing hot dry air (F1, G1) through the first water saturated desiccant to desorb water from the first water saturated desiccant into the hot dry air to obtain humidified hot air (A1) or for flowing external airflow (H1) through the desiccant (126) to obtain the water saturated desiccant. As discussed in paragraphs [0090] and [0163], Eplee can use multiple reactors in series. These reactors are sorbent wheels, and both are capable of desorbing water from the desiccant and having the desiccant adsorb moisture. Therefore, in at least one reactor water can be desorbed from the desiccant, and in at least one reactor moisture can be adsorbed by the desiccant. A first heat exchanger (136) can transfer heat from the humidified hot air (A1) to the cold dry air (C1) to obtain humidified cool air (B1) and warm dry air (D1). A second heat exchanger (138) is configured to removed excess heat form the humidified cool air (B1) toward outside of the apparatus to cool the humidified cool air (B1) to its dew point to obtain water and cold dry air (C1). A heater (144) produces the hot dry air (F1, G1) for flowing through the water saturated desiccant.
In regard to claims 43 and 45, as shown in figure 2 and discussed in paragraph [0074], the reactor (124) comprises a desiccant wheel (126) that includes a solid desiccant. As discussed above, multiple desiccant wheels can be used in series in Eplee.
In regard to claims 46 and 47, as discussed in paragraph [0076], the heater can be a non-electric heater, such as a solar heater or a waster heat recovery unit.
Claim Rejections - 35 USC § 103
The text of those sections of Title 35, U.S. Code not included in this action can be found in a prior Office action.
Claim 44 is rejected under 35 U.S.C. 103 as being unpatentable over Eplee in view of FR 2998483 to Haarlemmer (hereinafter referred to as Haarlemmer).
Eplee is discussed above in section 3. Eplee includes a single reactor (124) having a sorption, or desiccant, wheel (126). The desiccant wheel includes a portion that is adsorbing moisture from an outside air stream (H1) and a portion that desorbs moisture to the hot dry air stream (F1, G1). The wheel can be turned to alternate these portions and operate substantially continuously. There is no evidence the reactor needs to be formed with a desiccant wheel as long as it operates equivalently. Haarlemmer also disclose a device having a desiccant. As shown in figure 3, Haarlemmer includes an adsorption reactor (6) and a regeneration, or desorption, reactor. The desiccant is provided as a fluidized bed in each reactor. Devices (8, 10) are provided to transfer the desiccant between the reactors. This similarly allows for substantially continuous operation.
It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify Eplee to substitute the desiccant wheel reactor for multiple fluidized bed reactors as suggested by Haarlemmer as both are equivalently known reactors in the art for allowing substantially continuous operation of a desiccant where it is being used simultaneously for adsorption and desorption.
Response to Arguments
Applicant's arguments filed September 4, 2026 have been fully considered but they are not persuasive.
Firstly, as discussed above, upon further consideration, the examiner respectfully disagrees that Eplee does not disclose multiple reactors. As discussed in paragraphs [0090] and [0163], Eplee can use multiple reactors in series. These reactors are sorbent wheels, and both are capable of desorbing water from the desiccant and having the desiccant adsorb moisture. Therefore, in at least one reactor water can be desorbed from the desiccant, and in at least one reactor moisture can be adsorbed by the desiccant. Further, even if the reactors are required to be in parallel, this would be considered a mere duplication of parts. Sorbent wheels could be provided in parallel in order to provide redundancy in case one needs to be completely taken offline for maintenance and/or to be able to handle different flow needs, for example, an added reactor could be used to handle larger flows.
The examiner also respectfully disagrees with applicant’s arguments in regard to the combination of Eplee and Haarlemmer. Both Eplee and Haarlemmer include reactors having a desiccant that can remove water/moisture. As discussed in MPEP 2141(III), a rationale that can support a conclusion of obviousness includes a simple substitution of one known element for another to obtain predictable results. In this case, both the desiccant wheel reactor in Eplee and the fluidized bed reactors in Haarlemmer are known elements that use a desiccant for water/moisture adsorption. As both the desiccant wheel reactor and the fluidized bed reactors include a desiccant both predictably will achieve the substantially same result of sorbing water/moisture from the air. Similarly, the examiner respectfully disagrees the combination of Haarlemmer with Eplee will render Eplee unsatisfactory for its purpose. Haarlemmer is only used to suggest the substitution of one type of desiccant reactor for another. Otherwise, the system of Eplee remains the same and predictably will function equivalently. Finally, the examiner notes that as Eplee and Haarlemmer disclose a desiccant wheel reactor and fluidized bed reactors, respectively, these are both known in the art. As both include a desiccant as a sorbent and can be used to remove water/moisture from air, one of ordinary skill in the art would reasonably consider them to be equivalently known in the art.
Conclusion
Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a).
A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action.
Any inquiry concerning this communication or earlier communications from the examiner should be directed to Robert Clemente whose telephone number is (571)272-1476. The examiner can normally be reached M-F 9-5.
Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice.
If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Benjamin Lebron can be reached at 571-272-0475. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300.
Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000.
/ROBERT CLEMENTE/Primary Examiner, Art Unit 1773