METAL TO METAL ENCAPSULATED ELECTRICAL POWER CABLE SYSTEM FOR ESP AND OTHER APPLICATIONS

Non-Final OA §102§103
Filed
Mar 01, 2024
Priority
Sep 06, 2021 — GB 2112628.9 +1 more
Examiner
ALHAWAMDEH, NADER J
Art Unit
2831
Tech Center
2800 — Semiconductors & Electrical Systems
Assignee
Bim2M-Esp Limited [Gb]
OA Round
1 (Non-Final)
92%
Grant Probability
Favorable
1-2
OA Rounds
0m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 92% — above average
92%
Career Allowance Rate
589 granted / 644 resolved
+23.5% vs TC avg
Moderate +10% lift
Without
With
+10.2%
Interview Lift
resolved cases with interview
Fast prosecutor
1y 11m
Avg Prosecution
22 currently pending
Career history
654
Total Applications
across all art units

Statute-Specific Performance

§101
0.6%
-39.4% vs TC avg
§103
39.9%
-0.1% vs TC avg
§102
51.6%
+11.6% vs TC avg
§112
2.7%
-37.3% vs TC avg
Black line = Tech Center average estimate • Based on career data from 644 resolved cases

Office Action

§102 §103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Objections Claims 1-14 and 16-24 objected to because of the following informalities: In regards to claim 1, line recites “A pre-assembled cable assembly”, it should be –A cable assembly--. In regard to claims 2-14, line 1, recites “An assembly”, it should be –The cable assembly--. In regard to claims 16-24, line 1, recites “An assembly”, it should be –The cable assembly--. Appropriate correction is required. Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claims 1-2, 4-7, 9, 14-15, 17-18, and 24-26 are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Frey (US. 2012/0100737 A1). In Regards to Claim 1: Frey teaches a pre-assembled cable assembly (Fig. 3) for a penetrator body or pothead (22), comprising: at least one cable (39) located in a volume seal disc (51) is considered a volume in the penetrator body (22) and one that surrounds the cable (39) of the penetrator body or pothead (22); the volume around the cable (39) being encapsulated in a low temperature alloy. (Paragraph 15, The cylindrical shaped portion of the first insulator includes a plurality of integral annular boot seal retaining and support rings extending into the first bore to provide sufficient support to the boot seal during low-temperature operations in which the boot seal has not expanded into a portion of a volume of the boot seal cavity between adjacent rings of the plurality of annular rings) In Regards to Claim 2: Frey teaches an assembly according to claim 1, wherein the at least one cable (39) includes a spliced electrical connection located a volume of the penetrator body or pothead (22) the volume around the spliced electrical connection being encapsulated in a low temperature alloy. (Paragraph 15, The cylindrical shaped portion of the first insulator includes a plurality of integral annular boot seal retaining and support rings extending into the first bore to provide sufficient support to the boot seal during low-temperature operations in which the boot seal has not expanded into a portion of a volume of the boot seal cavity between adjacent rings of the plurality of annular rings) In Regards to Claim 4: Frey teaches an assembly according to claim 1, wherein penetrator is a motor penetrator (16). (Paragraph 4, an electrical cable to an electrical submersible pump electric motor) In Regards to Claim 5: Frey teaches an assembly according to claim 1, wherein penetrator is a wellhead or packer penetrator. (Paragraph 4, an electrical cable to an electrical submersible pump electric motor) In Regards to Claim 6: Frey teaches an assembly according to claim 1, wherein there is included a tube (69) surrounding the cable (39), and end fittings which seal the tube (69) and seal around the cable (39). In Regards to Claim 7: Frey teaches an assembly according to claim 1, wherein lead rings (121) are included for metal-to-metal seals at tool and cable (39) junctions. In Regards to Claim 9: Frey teaches an assembly according to claim 1, wherein the volume is defined by a void space for a wellhead or packer penetrator (16). In Regards to Claim 14: Frey teaches an assembly according to claim 1, wherein the low temperature alloy is selected based on the desired melting point depending on the anticipated well bore (10) temperature. (Paragraph 33, operation at lower temperatures and/or before extensive well fluid contact. The desired volume of cavity 60 in relation to the volume of e.g. rubber or other sealing material forming the boot seals 51) In Regards to Claim 15: Frey teaches a cable assembly (Fig. 3) for at least one cable (39) includes a spliced electrical connection, comprising; at least one spliced cable (40); and a splice tube (69) surrounding the at least one spliced cable (40), defining a volume between the cable (39) and the splice tube (69); the volume being encapsulated in a low temperature alloy. (Paragraph 15, The cylindrical shaped portion of the first insulator includes a plurality of integral annular boot seal retaining and support rings extending into the first bore to provide sufficient support to the boot seal during low-temperature operations in which the boot seal has not expanded into a portion of a volume of the boot seal cavity between adjacent rings of the plurality of annular rings) In Regards to Claim 17: Frey teaches an assembly according to claim 15, wherein there is included end fittings which seal the tube (69) and seal around the cable (39). In Regards to Claim 18: Frey teaches an assembly according to claim 15, wherein lead rings (121) are included for metal-to-metal seals at tool and cable (39) junctions. In Regards to Claim 24: Frey teaches an assembly according to claim 15, wherein the low temperature alloy is selected based on the desired melting point depending on the anticipated well bore (10) temperature. (Paragraph 33, operation at lower temperatures and/or before extensive well fluid contact. The desired volume of cavity 60 in relation to the volume of e.g. rubber or other sealing material forming the boot seals 51) In Regards to Claim 25: Frey teaches a method of disassembling a pre-assembled cable assembly (Fig. 3) for a penetrator body or pothead (22), the assembly having at least one cable (39) located in a volume of the penetrator body or pothead (22) and the volume around the cable (39) being encapsulated in a low temperature alloy, the method comprising remelting the low temperature alloy. (Paragraph 15, The cylindrical shaped portion of the first insulator includes a plurality of integral annular boot seal retaining and support rings extending into the first bore to provide sufficient support to the boot seal during low-temperature operations in which the boot seal has not expanded into a portion of a volume of the boot seal cavity between adjacent rings of the plurality of annular rings) In Regards to Claim 26: Frey teaches a method of assembling a cable assembly (Fig. 3) for a penetrator body or pothead (22), the assembly (Fig. 3) having at least one cable (39) located in a volume of the penetrator body or pothead (22) and the volume around the cable (39) being encapsulated in a low temperature alloy, the method comprising enclosing the assembly and applying pressurized fluid to the assembly via a pressure test port to confirm the integrity of seal. (Paragraph 15, The cylindrical shaped portion of the first insulator includes a plurality of integral annular boot seal retaining and support rings extending into the first bore to provide sufficient support to the boot seal during low-temperature operations in which the boot seal has not expanded into a portion of a volume of the boot seal cavity between adjacent rings of the plurality of annular rings) Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claims 3, 12-13, 16, and 22-23 are rejected under 35 U.S.C. 103 as being unpatentable over Frey (US. 2012/0100737 A1). In Regards to Claim 3: All claim limitations are discussed with respect to Claim 1, Frey does not teach wherein cable is metal clad. However, it would have been obvious to one have ordinary skill in the art before the effective filing date of the invention to have cable is metal clad, since it has been held to be with the general skill of worker in the art to select a known material on the basis of its suitability for the intended use as a matter of obvious design choice. In re Leshin, 125 USPQ 416. To provide a method and pothead assembly for forming a seal around each one of a set of conductors extending down a well bore and into a motor housing of an electrical submersible pump. (Frey, Paragraph 11) In Regards to Claim 12: All claim limitations are discussed with respect to Claim 1, Frey does not teach wherein the low temperature alloy is bismuth or a bismuth alloy. However, it would have been obvious to one have ordinary skill in the art before the effective filing date of the invention to have low temperature alloy is bismuth or a bismuth alloy, since it has been held to be with the general skill of worker in the art to select a known material on the basis of its suitability for the intended use as a matter of obvious design choice. In re Leshin, 125 USPQ 416. To provide a method and pothead assembly for forming a seal around each one of a set of conductors extending down a well bore and into a motor housing of an electrical submersible pump. (Frey, Paragraph 11) In Regards to Claim 13: All claim limitations are discussed with respect to Claim 1, Frey does not teach wherein the low temperature alloy is lead. However, it would have been obvious to one have ordinary skill in the art before the effective filing date of the invention to have the low temperature alloy is lead, since it has been held to be with the general skill of worker in the art to select a known material on the basis of its suitability for the intended use as a matter of obvious design choice. In re Leshin, 125 USPQ 416. To provide a method and pothead assembly for forming a seal around each one of a set of conductors extending down a well bore and into a motor housing of an electrical submersible pump. (Frey, Paragraph 11) In Regards to Claim 16: All claim limitations are discussed with respect to Claim 15, Frey does not teach wherein cable is metal clad. However, it would have been obvious to one have ordinary skill in the art before the effective filing date of the invention to have cable is metal clad, since it has been held to be with the general skill of worker in the art to select a known material on the basis of its suitability for the intended use as a matter of obvious design choice. In re Leshin, 125 USPQ 416. To provide a method and pothead assembly for forming a seal around each one of a set of conductors extending down a well bore and into a motor housing of an electrical submersible pump. (Frey, Paragraph 11) In Regards to Claim 22: All claim limitations are discussed with respect to Claim 15, Frey does not teach wherein the low temperature alloy is bismuth or a bismuth alloy. However, it would have been obvious to one have ordinary skill in the art before the effective filing date of the invention to have low temperature alloy is bismuth or a bismuth alloy, since it has been held to be with the general skill of worker in the art to select a known material on the basis of its suitability for the intended use as a matter of obvious design choice. In re Leshin, 125 USPQ 416. To provide a method and pothead assembly for forming a seal around each one of a set of conductors extending down a well bore and into a motor housing of an electrical submersible pump. (Frey, Paragraph 11) In Regards to Claim 23: All claim limitations are discussed with respect to Claim 15, Frey does not teach wherein the low temperature alloy is lead. However, it would have been obvious to one have ordinary skill in the art before the effective filing date of the invention to have the low temperature alloy is lead, since it has been held to be with the general skill of worker in the art to select a known material on the basis of its suitability for the intended use as a matter of obvious design choice. In re Leshin, 125 USPQ 416. To provide a method and pothead assembly for forming a seal around each one of a set of conductors extending down a well bore and into a motor housing of an electrical submersible pump. (Frey, Paragraph 11) Allowable Subject Matter Claims 8, 10-11, and 19-21 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to NADER J ALHAWAMDEH whose telephone number is (571)270-0571. The examiner can normally be reached Monday-Friday 9Am - 6Pm EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Abdullah A Riyami can be reached at (571)270-3119. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /NADER J ALHAWAMDEH/Patent Examiner, Art Unit 2831 /ABDULLAH A RIYAMI/Supervisory Patent Examiner, Art Unit 2831
Read full office action

Prosecution Timeline

Mar 01, 2024
Application Filed
Aug 20, 2026
Non-Final Rejection mailed — §102, §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12738679
ELECTRICAL CONNECTION PROTECTION SYSTEM, ELECTRICAL PROTECTION CONNECTING HEAD, ELECTRICAL DEVICE AND POWER SUPPLY APPARATUS
3y 4m to grant Granted Sep 15, 2026
Patent 12738691
CONNECTOR MODULE AND ELECTRONIC DEVICE
2y 8m to grant Granted Sep 15, 2026
Patent 12738687
HOUSING AND CONNECTOR
2y 4m to grant Granted Sep 15, 2026
Patent 12731947
SOCKET INTERCONNECT STRUCTURES AND RELATED METHODS
3y 11m to grant Granted Sep 08, 2026
Patent 12731928
ELECTRONIC DEVICE
3y 0m to grant Granted Sep 08, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
92%
Grant Probability
99%
With Interview (+10.2%)
1y 11m (~0m remaining)
Median Time to Grant
Low
PTA Risk
Based on 644 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month