Application No. 18/690,990

METHOD FOR CAPTURING CO2 FROM A FLUE GAS FROM A DISTRICT HEATING PLANT

Non-Final OA §112
Filed
Mar 11, 2024
Priority
Sep 14, 2021 — NO 20211107 +1 more
Examiner
HE, QIANPING
Art Unit
1776
Tech Center
1700 — Chemical & Materials Engineering
Assignee
Capsol Technologies Asa
OA Round
1 (Non-Final)
67%
Grant Probability
Favorable
1-2
OA Rounds
4m
Est. Remaining
82%
With Interview

Examiner Intelligence

Grants 67% — above average
67%
Career Allowance Rate
195 granted / 290 resolved
+2.2% vs TC avg
Moderate +15% lift
Without
With
+14.9%
Interview Lift
resolved cases with interview
Typical timeline
2y 12m
Avg Prosecution
51 currently pending
Career history
358
Total Applications
across all art units

Statute-Specific Performance

§101
2.0%
-38.0% vs TC avg
§103
46.3%
+6.3% vs TC avg
§102
19.9%
-20.1% vs TC avg
§112
29.4%
-10.6% vs TC avg
Black line = Tech Center average estimate • Based on career data from 290 resolved cases

Office Action

§112
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Election/Restrictions Applicant’s election of Group II (claims 19–22 and 24–25) in the reply filed on Sep. 2, 2026 is acknowledged. Because applicant did not distinctly and specifically point out the supposed errors in the restriction requirement, the election has been treated as an election without traverse (MPEP § 818.01(a)). Claim Interpretation The following is a quotation of 35 U.S.C. 112(f): (f) Element in Claim for a Combination. – An element in a claim for a combination may be expressed as a means or step for performing a specified function without the recital of structure, material, or acts in support thereof, and such claim shall be construed to cover the corresponding structure, material, or acts described in the specification and equivalents thereof. The following is a quotation of pre-AIA 35 U.S.C. 112, sixth paragraph: An element in a claim for a combination may be expressed as a means or step for performing a specified function without the recital of structure, material, or acts in support thereof, and such claim shall be construed to cover the corresponding structure, material, or acts described in the specification and equivalents thereof. The claims in this application are given their broadest reasonable interpretation using the plain meaning of the claim language in light of the specification as it would be understood by one of ordinary skill in the art. The broadest reasonable interpretation of a claim element (also commonly referred to as a claim limitation) is limited by the description in the specification when 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, is invoked. As explained in MPEP § 2181, subsection I, claim limitations that meet the following three-prong test will be interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph: (A) the claim limitation uses the term “means” or “step” or a term used as a substitute for “means” that is a generic placeholder (also called a nonce term or a non-structural term having no specific structural meaning) for performing the claimed function; (B) the term “means” or “step” or the generic placeholder is modified by functional language, typically, but not always linked by the transition word “for” (e.g., “means for”) or another linking word or phrase, such as “configured to” or “so that”; and (C) the term “means” or “step” or the generic placeholder is not modified by sufficient structure, material, or acts for performing the claimed function. Use of the word “means” (or “step”) in a claim with functional language creates a rebuttable presumption that the claim limitation is to be treated in accordance with 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph. The presumption that the claim limitation is interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, is rebutted when the claim limitation recites sufficient structure, material, or acts to entirely perform the recited function. Absence of the word “means” (or “step”) in a claim creates a rebuttable presumption that the claim limitation is not to be treated in accordance with 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph. The presumption that the claim limitation is not interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, is rebutted when the claim limitation recites function without reciting sufficient structure, material or acts to entirely perform the recited function. Claim limitations in this application that use the word “means” (or “step”) are being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, except as otherwise indicated in an Office action. Conversely, claim limitations in this application that do not use the word “means” (or “step”) are not being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, except as otherwise indicated in an Office action. The limitation of “means are provided to deliver the heat of the cooling water in the CO2 cooler cooling water withdrawal pipe to the district heating plant” in claim 20 invokes 35 U.S.C. 112(f). Applicant’s Spec. discloses “the means for delivering heat to the district heating plant comprises a CO2 cooler heat exchanger (47) where a CO2 cooler incoming heat medium pipe (4) is arranged to deliver a heat medium to the CO2 cooler heat exchanger (47) from the district heating plant and a CO2 cooler heat medium return pipe (4′) is arranged to the CO2 cooler heat exchanger (47) to deliver heated heat medium back to the district heating plant, and the CO2 cooler return pipe (47) is arranged to deliver hot cooling water to the CO2 cooler heat exchanger (47) and the CO2 cooler cooling water pipe (44) is arranged to deliver cooling water cooled in the heat exchanger to the top of the CO2 cooler (43)”. And the limitation in claim 20 is interpreted accordingly. If applicant does not intend to have this/these limitation(s) interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph, applicant may: (1) amend the claim limitation(s) to avoid it/them being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph (e.g., by reciting sufficient structure to perform the claimed function); or (2) present a sufficient showing that the claim limitation(s) recite(s) sufficient structure to perform the claimed function so as to avoid it/them being interpreted under 35 U.S.C. 112(f) or pre-AIA 35 U.S.C. 112, sixth paragraph. Claim Objections Claims 19–22, 24–25 are objected to because of the following informalities: The current status of all of the claims in the application, including any previously canceled or withdrawn claims, must be given. Status is indicated in a parenthetical expression following the claim number by one of the following status identifiers: (original), (currently amended), (previously presented), (canceled), (withdrawn), (new), or (not entered). MPEP 714(II)(C)(A). Claim 19 is objected because of “the used cooling water” and “used cooling water”. Appropriate correction is required. Claim Rejections - 35 USC § 112(b) The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. Claims 19–22 and 24–25 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. Claim 19 is indefinite because the limitation of “the cooling water heat exchanger” lacks antecedent basis. It is also unclear if the cooling water heat exchanger is the same as the heat exchange unit recited earlier. Claim 19 is also indefinite because it is unclear if the second recited “and a lean absorbent pipe” is the same as that recited earlier. The applicant labels the claimed lean absorbent pipe in the instant disclosure (hereinafter “Spec.”) to “18”, Spec. [0023]. The same interpretation is used for the purpose of examination. Applicant is encouraged to clarify this in the response. Claim 19 is also indefinite because the limitation of “the top” of “the packed section”, “the absorbent column”, “the packed stripper section” and “the desorber column” lacks antecedent basis. Multiple location could be regarded as a top of those devices, and therefore, it is unclear which part is the claimed “the top”. Claims 20–22 and 24–25 are indefinite because they depend on claim 19. Claim 21 is indefinite because the term “hot cooling water” is not defined in the Spec., and it is unclear what standard used for the term “hot”. Claim 22 is indefinite because the term “the cooling fluid” lacks antecedent basis. The limitation of “the CO2 cooler incoming heat medium pipe” lacks antecedent basis. The limitation of “the CO2 cooler heat medium return pipe” lacks antecedent basis. Claim 24 is indefinite because it is unclear if the limitation of “withdrawn lean absorbent” is the same as part of the lean absorbent in the lean absorbent pipe. If it is referring to the same term, it should be “the withdrawn lean absorbent”. Allowable Subject Matter Claims 19–22 and 24–25 would be allowable if rewritten or amended to overcome the rejection(s) under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), 2nd paragraph, set forth in this Office action. The following is a statement of reasons for the indication of allowable subject matter: Hamrin et al., US 2018/0243688 A1 (“Hamrin”) in view of Mak, US 2008/0184887 A1 (“Mak”) is the closest prior art. Regarding claim 19: Hamrin discloses a plant for capturing CO2 from a flue gas from a district heating plant fired on a carbonaceous fuel (Hamrin Fig. 1, [0002]) comprising a flue gas pipe (Hamrin’s exhaust intake line 1, Hamrin Fig. 1, [0020]) for introduction of the flue gas into a flue gas compressor (Hamrin’s compressor 10, Fig. 1, [0023]) operated by a driver (Harmin discloses its compressor 10 is operated by a motor 11, which is the claimed “driver”, Harmin [0023]), a compressed flue gas pipe (Harmin’s compressed exhaust gas pipe 12, Fig. 1, [0023]) for introducing the compressed flue gas into a heat exchange unit (Harmin’s heat exchanger 13, 15 and 22, Fig. 1, [0024] and [0026]–[0027]) wherein the compressed flue gas is cooled against a CO2 lean flue gas (Harmin’s CO2 depleted exhaust gas in pipe 31, Fig. 1, [0029]), a cooled flue gas pipe (Harmin’s cooled exhaust gas pipe 23, Fig. 1, [0028]) for withdrawing the cooled flue gas and introduction thereof into absorber column (Harmin’s absorber 30, Fig. 1, [0028]) below packed section (Harmin discloses its absorber 30 comprising a packing to increase the contact surface and contact time between the absorbent and exhaust gas, [0028], and Harmin discloses its cooling incoming exhaust gas 23 is introduced close to the bottom of the absorber, [0028]; It would have been obvious for one ordinary skill in the art at the time of filing to understand that Harmin’s pipe 23 should be introduced below the packing to make full use of the packing contact area), a lean absorbent pipe (Harmin’s flash lean absorbent pipe 49, Fig. 1, [0034]) for introduction of lean absorbent at the top of the packed section (see Harmin’s Fig. 1), a lean flue gas pipe (Harmin’s depleted exhaust gas 31, Fig. 1, [0029]) connected to the top of the absorbent column (30 of Harmin) for leading the lean flue gas from the absorber column to the heat exchange unit (22 of Harmin) to be heated against the compressed flue gas (12 entering heat exchanger 22, Harmin Fig. 1, [0027]), a heated lean flue gas pipe (Harmin’s heated lean exhaust gas 33, Fig. 1, [0029]) for leading the heated lean flue gas from the heat exchange unit into a lean flue gas expander (Harmin’s expander 34, Fig. 1, [0030]), an expanded lean flue gas pipe (Harmin’s expanded exhaust gas line 36, Fig. 1, [0029]) for releasing the lean flue gas into the surroundings (Harmin’s power plant interface 2, which is not part of the co2 capture plant, and therefore read on the term “the surroundings”, Fig. 1, [0020]), a rich absorbent pipe (Harmin’s rich absorbent line 37, Fig. 1, [0031]) for leading rich absorbent collected at the bottom of the absorber (30 of Harmin, Fig. 1) and introduction thereof into a desorber column (Harmin’s regenerator 40, Fig. 1, [0033]) at the top of packed stripper section (Harmin discloses line 37 is introduced on top of its regenerator 40, Harmin does not explicitly teach that the stripper is packed, however, Harmin discloses packing could increase contact surface and contact time, Harmin [0027], It would therefore have been obvious for one ordinary skill in the art at the time of filing to include packing in Harmin’s regenerator 40 for the same purpose of increase contact area and time), steam pipes (Harmin’s flash steam pipe 48 and compressed flash pipe 83, Fig. 1, [0032] and [0037]) for introduction of steam into the desorber column (40 of Harmin) below the packed stripper section (as discussed above, It would have been obvious for one ordinary skill in the art at the time of filing for the steam pipes to be below the packing for a full use of the packing area), a CO2 withdrawal pipe (Harmin’s CO2 export pipe 73, Fig. 1, [0035]) arranged to withdraw CO2 from the top of the desorber column (40 of Harmin) for further treatment and disposal, and a lean absorbent pipe (Harmin’s lean absorbent pipe 49) for leading lean absorbent collected at the bottom of the desorber column (40 of Harmin Fig. 1) and introduction thereof into the absorber column (30 of Harmin Fig. 1). Harmin does not disclose wherein a side draw pipe is arranged to withdraw a part of the lean absorbent in the lean absorbent pipe, introduce the withdrawn absorbent into the cooling water heat exchanger for cooling thereof against heat medium received from the district heating plant in a heat medium pipe, where a heat medium return pipe is arranged to return the thus heated heat medium to the district heating plant, and a cooling medium introduction pipe for leading the cooled lean absorbent from the heat exchanger and introduction thereof at the top of a cooler packing at the top of the absorber. In the analogous art of carbon dioxide removal in flue gas streams, Mak discloses a lean solvent stream 20 comprising a side draw pipe (Mak’s first portion 21, Fig. 2,[0035]) that is arranged to withdraw a part of the lean absorbent in the lean absorbent pipe (20 of Mak, Fig. 2, [0035]), introduce the withdrawn absorbent into the cooling water heat exchanger (Mak’s cooler 68, Mak Fig. 2, [0035] for cooing thereof. However, Mak does not teach the cooling is against heat medium received from the district heating plant in a heat medium pipe, where a heat medium return pipe is arranged to return the thus heated heat medium to the district heating plant. It would not have been obvious for one ordinary skill in the art at the time of filing to modify Hamrin in view of Mak for such limitation, because none of the prior art teaches or shows such limitation. Additionally, Harmin’s flue gas 1 pass through a cooler 6, and it is thus understood that Harmin’s flue gas 1 is hot. It therefore teaches away from Harmin to further heat Harmin’s flue gas 1. Additionally, neither Harmin or Mak teaches a cooling pack at the top of the absorber. Claims 20–22 and 24–25 would be allowable because they depend on claim 19. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to QIANPING HE whose telephone number is (571)272-8385. The examiner can normally be reached on 7:30-5:00 M-F. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Jennifer Dieterle can be reached on (571) 270-7872. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see https://ppair-my.uspto.gov/pair/PrivatePair. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /Qianping He/Primary Examiner, Art Unit 1776
Read full office action

Prosecution Timeline

Mar 11, 2024
Application Filed
Oct 29, 2026
Non-Final Rejection mailed — §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12752251
GAS-LIQUID CONTACTOR WITH PACKING FOR CAPTURING CARBON DIOXIDE
4y 4m to grant Granted Oct 06, 2026
Patent 12752226
PHOTOCATALYTIC AIR CONDITIONING FILTER MODULE WITH ANTIVIRAL PERFORMANCE
4y 0m to grant Granted Oct 06, 2026
Patent 12747684
CRANKCASE VENTILATION ELEMENT
3y 4m to grant Granted Sep 29, 2026
Patent 12745598
WAFER STORAGE DEVICE WITH PARTICLE-ATTRACTION OBJECT
3y 5m to grant Granted Sep 22, 2026
Patent 12741246
MIXED GAS SEPARATION METHOD AND MIXED GAS SEPARATION APPARATUS
2y 9m to grant Granted Sep 22, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
67%
Grant Probability
82%
With Interview (+14.9%)
2y 12m (~4m remaining)
Median Time to Grant
Low
PTA Risk
Based on 290 resolved cases by this examiner. Grant probability derived from career allowance rate.