Prosecution Insights
Last updated: November 20, 2026
Application No. 18/700,070

COMMUNICATION BASED ON CHANNEL RASTER

Final Rejection §103
Filed
Apr 10, 2024
Priority
Oct 21, 2021 — provisional 63/270,519 +3 more
Examiner
SUN, DAVID ZHIJUN
Art Unit
2418
Tech Center
2400 — Computer Networks
Assignee
LG Electronics Inc.
OA Round
2 (Final)
90%
Grant Probability
Favorable
3-4
OA Rounds
3m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 90% — above average
90%
Career Allowance Rate
102 granted / 113 resolved
+32.3% vs TC avg
Moderate +14% lift
Without
With
+14.1%
Interview Lift
resolved cases with interview
Typical timeline
2y 11m
Avg Prosecution
24 currently pending
Career history
150
Total Applications
across all art units

Statute-Specific Performance

§101
1.5%
-38.5% vs TC avg
§103
61.0%
+21.0% vs TC avg
§102
16.3%
-23.7% vs TC avg
§112
18.3%
-21.7% vs TC avg
Black line = Tech Center average estimate • Based on career data from 113 resolved cases

Office Action

§103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Priority Applicant’s claim for the benefit of a prior-filed application under 35 U.S.C. 119(e) or under 35 U.S.C. 120, 121, 365(c), or 386(c) is acknowledged. Applicant has NOT complied with one or more conditions for receiving the benefit of an earlier filing date under 35 U.S.C. 119(e) as follows: The later-filed application must be an application for a patent for an invention which is also disclosed in the prior application (the parent or original nonprovisional application or provisional application). The disclosure of the invention in the parent application and in the later-filed application must be sufficient to comply with the requirements of 35 U.S.C. 112(a) or the first paragraph of pre-AIA 35 U.S.C. 112, except for the best mode requirement. See Transco Products, Inc. v. Performance Contracting, Inc., 38 F.3d 551, 32 USPQ2d 1077 (Fed. Cir. 1994). The disclosure of the prior-filed application, Application No. 63/270519, fails to provide adequate support or enablement in the manner provided by 35 U.S.C. 112(a) or pre-AIA 35 U.S.C. 112, first paragraph for one or more claims of this application. There is no description in the prior-filed application that discloses “operating band n263” and “based on that channel bandwidth is 400 MHz, 800 MHz, or 1600 MHz for the operating band n263, the applicable NR-ARFCN includes one or more of NR-ARFCNs being spaced apart each other by 6720*N, and wherein N is an integer.” as recited in independent claims 1, 7 and 17. There is no mentioning of “band n263” and “NR-ARFCNs being spaced apart each other by 6720*N” in this application. The disclosure of the prior-filed application, Application No. 63/309010, fails to provide adequate support or enablement in the manner provided by 35 U.S.C. 112(a) or pre-AIA 35 U.S.C. 112, first paragraph for one or more claims of this application. There is no description in the prior-filed application that discloses “based on that channel bandwidth is 400 MHz, 800 MHz, or 1600 MHz for the operating band n263, the applicable NR-ARFCN includes one or more of NR-ARFCNs being spaced apart each other by 6720*N, and wherein N is an integer.” as recited in independent claims 1, 7 and 17. The application discloses operating band n263. But there is no mentioning of “NR-ARFCNs being spaced apart each other by 6720*N” in this application. Accordingly, claims 1-7 and 12-18 are NOT entitled to the benefit of 63/270519 and 63/309010. Response to Arguments Applicant’s arguments with respect to claim(s) 1, 7 and 17 have been fully considered, a new ground for rejection has been made in view of amendment. Claims 1, 7 and 17 are rejected under 35 U.S.C 103 (See 103 rejection of claims 1 and 17 below). Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. This application currently names joint inventors. In considering patentability of the claims the examiner presumes that the subject matter of the various claims was commonly owned as of the effective filing date of the claimed invention(s) absent any evidence to the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to point out the inventor and effective filing dates of each claim that was not commonly owned as of the effective filing date of the later invention in order for the examiner to consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2) prior art against the later invention. Claim(s) 1-7 and 12-16 is/are rejected under 35 U.S.C. 103 as being unpatentable over “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; User Equipment (UE) radio transmission and reception; Part 2: Range 2 Standalone”, 3GPP TS 38.101-2 V17.5.0 (2022-03) (hereinafter 38.101-2), in view of US 20240340774 A1 (hereinafter Rane) (us-provisional-application US 63334042 20220422, hereinafter prov4042), and US 20220321151 A1 (hereinafter Zhu). Regarding claim 1, 38.101-2 teaches A user equipment (UE), perform operations comprising (38.101-2, page 19, The present document is a Single-RAT specification for NR UE, covering RF characteristics and minimum performance requirements.): identifying Radio Frequency (RF) channel position based on RF reference frequency (38.101-2, page 29, The RF reference frequency is used in signalling to identify the position of RF channels. identify the RF channel position in the uplink and downlink. ), wherein the RF reference frequency is defined based on a channel raster (38.101-2, page 29, The channel raster defines a subset of RF reference frequencies that can be used to identify the RF channel position in the uplink and downlink.), wherein the channel raster is based on applicable New Radio Absolute Radio Frequency Channel Number (NR-ARFCN) (38.101-2, page 30, The RF channel positions on the channel raster in each NR operating band are given through the applicable NRARFCN), 38.101-2 does not explicitly teach the UE comprising: at least one transceiver; at least one processor; and at least one computer memory operably connectable to the at least one processor and storing instructions that, based on being executed by the at least one processor, perform operations, wherein for an operating band n263, the applicable NR-ARFCN is based on a channel bandwidth, based on the channel bandwidth being 400 MHz, 800 MHz, or 1600 MHz for the operating band n263, the applicable NR-ARFCN includes a plurality of NR-ARFCNs being spaced apart from each other by 6720*N, and wherein N is an integer equal to or greater than 0. Rane in the same or similar field of endeavor teaches the UE comprising (Rane Fig. 15, [0208] FIG. 15 illustrates a functional block diagram of a wireless communication device, in accordance with some embodiments. Wireless communication device 1500 may be suitable for use as a UE configured for operation in a 5G NR network (prov4042 Fig. YY, page 64 )): at least one transceiver (Rane Fig. 15, transceiver 1510 (prov4042, Fig. YY, transmit and receive circuity YY 18 and 20, page 64)); at least one processor (Rane Fig. 15, processing circuitry 1506 (prov4042, Fig. YY, processing circuity YY12 and YY14.)); and at least one computer memory operably connectable to the at least one processor and storing instructions that, based on being executed by the at least one processor, perform operations (Rane Fig. 15, memory 1508; [0208] The communication device 1500 may also include processing circuitry 1506 and memory 1508 arranged to perform the operations described herein. [0209] The memory 1508 may store information for configuring the processing circuitry 1506 to perform operations (prov4042, Fig. YZ, page 67-68)). wherein for an 57-71 GHz operating band, the applicable NR-ARFCN is based on a channel bandwidth, based on the channel bandwidth being 400 MHz, 800 MHz, or 1600 MHz for the 57-71 GHz operating band, the applicable NR-ARFCN includes a plurality of NR-ARFCNs being spaced apart from each other by 6720*N, and wherein N is an integer equal to or greater than 0 (Rane 480 kHz SCS, 400 MHz CBW [0094] Example set of channel raster and SS raster entries in the 57-71 GHz band for 480 kHz SCS, 400 MHz CBW, SU=86% is shown in Table 14. The ARFCN and GSCN entries for each of the 400 MHz CBW for 480 kHz SCS can be equivalently expressed as N.sub.REF={2566603+N*1680*4, N=0, 1, . . . , 33} and GSCN={24168+N*23+floor(N+2/3), N=0, 1, . . . , 33}, (prov4042 page 19) 480 kHz SCS, 800 MHz CBW [0097] Example set of channel raster and SS raster entries in the 57-71 GHz band for 480 kHz SCS, 800 MHz CBW, SU=86% is shown in Table 16. The ARFCN and GSCN entries for each of the 800 MHz CBW for 480 kHz SCS can be equivalently expressed as N.sub.REF={2569963+N*1680*8, N=0, 1, . . . , 16} and GSCN={24168+N*47−floor(N/3), N=0, 1, . . . , 16}, respectively. (prov4042 page 22) 480 kHz SCS, 1600 MHz CBW [0104] Example set of channel raster and SS raster entries in the 57-71 GHz band for 480 kHz SCS, 1600 MHz CBW, SU=89% is shown in Table 21. The ARFCN and GSCN entries for each of the 1600 MHz CBW for 480 kHz SCS can be equivalently expressed as N.sub.REF={2576683+N*1680*16, N=0, 1, . . . , 7} and GSCN={24168+N*93+floor((N+2)/3), N=0, 1, . . . , 7}, respectively. (prov4042 page 25) ). Although Rane teaches 57-71 GHz band is n263 band (Rane [0216] the FR2 operating band n263 comprises unlicensed spectrum from 57 GHz to 71 GHz.), the priority document of Rane (prov4042) does not explicitly teach 57-71 GHz band is n263 band. Zhu in the same or similar field of endeavor teaches 57-71 GHz band is n263 band (Zhu [0134] In certain implementations, the fundamental frequency of the RF signals RF.sub.a, RF.sub.b . . . RF.sub.n corresponds to that of a 5G FR2 frequency band. Table 1 below depicts various examples of 5G FR2 frequency bands. PNG media_image1.png 200 400 media_image1.png Greyscale ). By modifying 38.101-2’s teachings of A user equipment (UE), perform operations comprising: identifying Radio Frequency (RF) channel position based on RF reference frequency, wherein the RF reference frequency is defined based on a channel raster, wherein the channel raster is based on applicable New Radio Absolute Radio Frequency Channel Number (NR-ARFCN), with Rane’s teachings of the UE comprising: at least one transceiver; at least one processor; and at least one computer memory operably connectable to the at least one processor and storing instructions that, based on being executed by the at least one processor, perform operations, wherein for an 57-71 GHz operating band, the applicable NR-ARFCN is based on a channel bandwidth, based on the channel bandwidth being 400 MHz, 800 MHz, or 1600 MHz for the 57-71 GHz operating band, the applicable NR-ARFCN includes a plurality of NR-ARFCNs being spaced apart from each other by 6720*N, and wherein N is an integer equal to or greater than 0. with Zhu’s teachings of 57-71 GHz band is n263 band, the modification results in A user equipment (UE) comprising: at least one transceiver; at least one processor; and at least one computer memory operably connectable to the at least one processor and storing instructions that, based on being executed by the at least one processor, perform operations comprising: identifying Radio Frequency (RF) channel position based on an RF reference frequency, wherein the RF reference frequency is defined based on a channel raster, wherein the channel raster is based on applicable New Radio Absolute Radio Frequency Channel Number (NR-ARFCN), wherein for an operating band n263, the applicable NR-ARFCN is based on a channel bandwidth, based on the channel bandwidth being 400 MHz, 800 MHz, or 1600 MHz for the operating band n263, the applicable NR-ARFCN includes a plurality of NR-ARFCNs being spaced apart from each other by 6720*N, and wherein N is an integer equal to or greater than 0. It would have been prima facie obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified 38.101-2 with Rane’s above teachings. The motivation is to reduce cell search complexity in high frequency range 57 GHz to 71 GHz (Rane [0069]). It would have been prima facie obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified 38.101-2 as modified by Rane with Zhu’s above teachings. The motivation is supporting FR2 frequency band (Zhu [0134]). Claim 7 recites similar limitations of claim 1, is thus rejected under similar rational. Regarding claim 2, 38.101-2 in view of Rane and Zhu (hereinafter combination) teaches The UE of claim 1. 38.101-2 teaches wherein the RF reference frequency is equal to: F.sub.REF-Offs + ΔF.sub.Global *( N.sub.REF - N.sub.REF-Offs), wherein the F.sub.REF-Offs is equal to 24250.08 MHz, wherein the ΔF.sub.Global is equal to 60 kHz, wherein the N.sub.REF is the applicable NR-ARFCN, and wherein the N.sub.REF-Offs is equal to 2016667 (38.101-2 page 29, The relation between the NR-ARFCN and the RF reference frequency FREF in MHz is given by the following equation, where FREF-Offs and NRef-Offs are given in table 5.4.2.1-1 and NREF is the NR-ARFCN PNG media_image2.png 200 400 media_image2.png Greyscale Per table 5.4.2.1-1, ΔF.sub.Global = 60 kHz, F.sub.REF-Offs =24250.08 MHz, N.sub.REF-Offs = 2016667). Claim 12 recites similar limitations of claim 2, is thus rejected under similar rational. Regarding claim 3, the combination teaches The UE of claim 1. 38.101-2 does not explicitly teach wherein the applicable NR-ARFCN is 2566603+6720*N, based on the channel bandwidth being 400 MHz for the operating band n263. Rane teaches wherein the applicable NR-ARFCN is 2566603+6720*N, based on the channel bandwidth being 400 MHz for the 57-71 GHz operating band (480 kHz SCS, 400 MHz CBW [0094] Example set of channel raster in the 57-71 GHz band for 480 kHz SCS, 400 MHz CBW, SU=86% is shown in Table 14. The ARFCN entries for each of the 400 MHz CBW for 480 kHz SCS can be equivalently expressed as N.sub.REF={2566603+N*6720, N=0, 1, . . . , 33} (prov4042 page 19)). Zhu teaches 57-71 GHz band is n263 band (Zhu [0134] cited above in rejection of claim 1.) By modifying Rane’s teachings of wherein the applicable NR-ARFCN is 2566603+6720*N, based on the channel bandwidth being 400 MHz for the 57-71 GHz operating band, with Zhu’s teachings of 57-71 GHz band is n263 band, the modification results in wherein the applicable NR-ARFCN is 2566603+6720*N, based on the channel bandwidth being 400 MHz for the operating band n263. It would have been prima facie obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified 38.101-2 as modified by Rane and Zhu with Rane’s above teachings. The motivation is to reduce cell search complexity in high frequency range 57 GHz to 71 GHz (Rane [0069]). It would have been prima facie obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified 38.101-2 as modified by Rane and Zhu with Zhu’s above teachings. The motivation is supporting FR2 frequency band (Zhu [0134]). Claim 13 recites similar limitations of claim 3, is thus rejected under similar rational. Regarding claim 4, the combination teaches The UE of claim 1. 38.101-2 does not explicitly teach wherein the applicable NR-ARFCN is 2569963+6720*N, based on the channel bandwidth being 800 MHz for the operating band n263. Rane teaches wherein the applicable NR-ARFCN is 2569963+6720*N, based on the channel bandwidth being 800 MHz for the 57-71 GHz operating band (Rane 480 kHz SCS, 800 MHz CBW [0097] Example set of channel raster and SS raster entries in the 57-71 GHz band for 480 kHz SCS, 800 MHz CBW, SU=86% is shown in Table 16. The ARFCN for each of the 800 MHz CBW for 480 kHz SCS can be equivalently expressed as N.sub.REF={2569963+N*1680*8, N=0, 1, . . . , 16} (prov4042 page 22), Note: 2569963+N*1680*8, N=0, 1, . . . , 16 is equivalent to 2569963+N*6720, N=0, … 32). Zhu teaches 57-71 GHz band is n263 band (Zhu [0134] cited above in rejection of claim 1.) By modifying Rane’s teachings of wherein the applicable NR-ARFCN is 2569963+6720*N, based on the channel bandwidth being 800 MHz for the 57-71 GHz operating band, with Zhu’s teachings of 57-71 GHz band is n263 band, the modification results in wherein the applicable NR-ARFCN is 2569963+6720*N, based on the channel bandwidth being 800 MHz for the operating band n263. It would have been prima facie obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified 38.101-2 as modified by Rane and Zhu with Rane’s above teachings. The motivation is to reduce cell search complexity in high frequency range 57 GHz to 71 GHz (Rane [0069]). It would have been prima facie obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified 38.101-2 as modified by Rane and Zhu with Zhu’s above teachings. The motivation is supporting FR2 frequency band (Zhu [0134]). Claim 14 recites similar limitations of claim 4, is thus rejected under similar rational. Regarding claim 5, the combination teaches The UE of claim 1. 38.101-2 does not explicitly teach wherein the applicable NR-ARFCN is 2576683+6720*N, based on the channel bandwidth being 1600 MHz for the operating band n263. Rane teaches wherein the applicable NR-ARFCN is 2576683+6720*N, based on the channel bandwidth being 1600 MHz for the 57-71 GHz operating band (Rane 480 kHz SCS, 1600 MHz CBW [0104] Example set of channel raster and SS raster entries in the 57-71 GHz band for 480 kHz SCS, 1600 MHz CBW, SU=89% is shown in Table 21. The ARFCN and GSCN entries for each of the 1600 MHz CBW for 480 kHz SCS can be equivalently expressed as N.sub.REF={2576683+N*1680*16, N=0, 1, . . . , 7} (prov4042 page 25), Note: 2576683+N*1680*16, N=0, 1, . . . , 7 is equivalent to 2576683+N*6720, N=0, . . . , 28). Zhu teaches 57-71 GHz band is n263 band (Zhu [0134] cited above in rejection of claim 1.) By modifying Rane’s teachings of wherein the applicable NR-ARFCN is 2576683+6720*N, based on the channel bandwidth being 1600 MHz for the 57-71 GHz operating band, with Zhu’s teachings of 57-71 GHz band is n263 band, the modification results in wherein the applicable NR-ARFCN is 2576683+6720*N, based on the channel bandwidth being 1600 MHz for the operating band n263. It would have been prima facie obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified 38.101-2 as modified by Rane and Zhu with Rane’s above teachings. The motivation is to reduce cell search complexity in high frequency range 57 GHz to 71 GHz (Rane [0069]). It would have been prima facie obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified 38.101-2 as modified by Rane and Zhu with Zhu’s above teachings. The motivation is supporting FR2 frequency band (Zhu [0134]). Claim 15 recites similar limitations of claim 5, is thus rejected under similar rational. Regarding claim 6, the combination teaches The UE of claim 1. 38.101-2 teaches wherein the operations further comprise: performing communication based on a channel including the identified RF channel position (38.101-2 page 29, The RF reference frequency is used in signalling to identify the position of RF channels. The channel raster defines a subset of RF reference frequencies that can be used to identify the RF channel position in the uplink and downlink.). Claim 16 recites similar limitations of claim 6, is thus rejected under similar rational. Claim(s) 17-18 is/are rejected under 35 U.S.C. 103 as being unpatentable over “3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Base Station (BS) radio transmission and reception”, 3GPP TS 38.104 V17.5.0 (2022-03) (hereinafter 38.104), in view of Rane and Zhu. Regarding claim 17, 38.104 teaches A method for performing communication, the method performed by a base station, the method comprising (38.104, page 23, The present document is a single-RAT specification for a BS, covering RF characteristics and minimum performance requirements.): determining Radio Frequency (RF) channel position for a channel based on an RF reference frequency (38.104 page 46, The RF reference frequency is used in signalling to identify the position of RF channels. identify the RF channel position in the uplink and downlink. Note: from BS perspective, uplink corresponding to communication from the UE, downlink corresponding to communication to the UE.), wherein the RF reference frequency is defined based on a channel raster (38.104 page 46, The channel raster defines a subset of RF reference frequencies that can be used to identify the RF channel position in the uplink and downlink.), wherein the channel raster is based on an applicable New Radio Absolute Radio Frequency Channel Number (NR-ARFCN) (38.104 page 49, The RF channel positions on the channel raster in each NR operating band are given through the applicable NR-ARFCN.), 38.104 does not explicitly teach wherein for an operating band n263, the applicable NR-ARFCN is based on a channel bandwidth, based on the channel bandwidth being 400 MHz, 800 MHz, or 1600 MHz for the operating band n263, the applicable NR-ARFCN includes a plurality of NR-ARFCNs being spaced apart from each other by 6720*N, and wherein N is an integer equal to or greater than 0. Rane in the same or similar field of endeavor teaches wherein for an 57-71 GHz operating band, the applicable NR-ARFCN is based on a channel bandwidth, based on the channel bandwidth being 400 MHz, 800 MHz, or 1600 MHz for the 57-71 GHz operating band, the applicable NR-ARFCN includes a plurality of NR-ARFCNs being spaced apart from each other by 6720*N, and wherein N is an integer equal to or greater than 0 (Rane 480 kHz SCS, 400 MHz CBW [0094] Example set of channel raster and SS raster entries in the 57-71 GHz band for 480 kHz SCS, 400 MHz CBW, SU=86% is shown in Table 14. The ARFCN and GSCN entries for each of the 400 MHz CBW for 480 kHz SCS can be equivalently expressed as N.sub.REF={2566603+N*1680*4, N=0, 1, . . . , 33} and GSCN={24168+N*23+floor(N+2/3), N=0, 1, . . . , 33}, (prov4042 page 19) 480 kHz SCS, 800 MHz CBW [0097] Example set of channel raster and SS raster entries in the 57-71 GHz band for 480 kHz SCS, 800 MHz CBW, SU=86% is shown in Table 16. The ARFCN and GSCN entries for each of the 800 MHz CBW for 480 kHz SCS can be equivalently expressed as N.sub.REF={2569963+N*1680*8, N=0, 1, . . . , 16} and GSCN={24168+N*47−floor(N/3), N=0, 1, . . . , 16}, respectively. (prov4042 page 22) 480 kHz SCS, 1600 MHz CBW [0104] Example set of channel raster and SS raster entries in the 57-71 GHz band for 480 kHz SCS, 1600 MHz CBW, SU=89% is shown in Table 21. The ARFCN and GSCN entries for each of the 1600 MHz CBW for 480 kHz SCS can be equivalently expressed as N.sub.REF={2576683+N*1680*16, N=0, 1, . . . , 7} and GSCN={24168+N*93+floor((N+2)/3), N=0, 1, . . . , 7}, respectively. (prov4042 page 25) ). Although Rane teaches 57-71 GHz band is n263 band (Rane [0216] the FR2 operating band n263 comprises unlicensed spectrum from 57 GHz to 71 GHz.), the priority document of Rane (prov4042) does not explicitly teach 57-71 GHz band is n263 band. Zhu in the same or similar field of endeavor teaches 57-71 GHz band is n263 band (Zhu [0134] In certain implementations, the fundamental frequency of the RF signals RF.sub.a, RF.sub.b . . . RF.sub.n corresponds to that of a 5G FR2 frequency band. Table 1 below depicts various examples of 5G FR2 frequency bands. PNG media_image1.png 200 400 media_image1.png Greyscale ). By modifying 38.104’s teachings of determining Radio Frequency (RF) channel position for a channel based on an RF reference frequency, wherein the RF reference frequency is defined based on a channel raster, wherein the channel raster is based on an applicable New Radio Absolute Radio Frequency Channel Number (NR-ARFCN), with Rane’s teachings of wherein for an 57-71 GHz operating band, the applicable NR-ARFCN is based on a channel bandwidth, based on the channel bandwidth being 400 MHz, 800 MHz, or 1600 MHz for the 57-71 GHz operating band, the applicable NR-ARFCN includes a plurality of NR-ARFCNs being spaced apart from each other by 6720*N, and wherein N is an integer equal to or greater than 0, with Zhu’s teachings of 57-71 GHz band is n263 band, the modification results in determining Radio Frequency (RF) channel position for a channel based on an RF reference frequency, wherein the RF reference frequency is defined based on a channel raster, wherein the channel raster is based on an applicable New Radio Absolute Radio Frequency Channel Number (NR-ARFCN), wherein for an operating band n263, the applicable NR-ARFCN is based on a channel bandwidth, based on the channel bandwidth being 400 MHz, 800 MHz, or 1600 MHz for the operating band n263, the applicable NR-ARFCN includes a plurality of NR-ARFCNs being spaced apart from each other by 6720*N, and wherein N is an integer equal to or greater than 0. It would have been prima facie obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified 38.104 with Rane’s above teachings. The motivation is to reduce cell search complexity in high frequency range 57 GHz to 71 GHz (Rane [0069]). It would have been prima facie obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified 38.104 as modified by Rane with Zhu’s above teachings. The motivation is supporting FR2 frequency band (Zhu [0134]). Regarding claim 18, 38.104 in view of Rane and Zhu teaches The method of claim 17. 38.104 teaches wherein the RF reference frequency is equal to: F.sub.REF-Offs + ΔF.sub.Global *( N.sub.REF - N.sub.REF-Offs), wherein the F.sub.REF-Offs is equal to 24250.08 MHz, wherein the ΔF.sub.Global is equal to 60 kHz, wherein the N.sub.REF is the applicable NR-ARFCN, and wherein the N.sub.REF-Offs is equal to 2016667 (38.104, page 46, The relation between the NR-ARFCN and the RF reference frequency FREF in MHz is given by the following equation, where FREF-Offs and NRef-Offs are given in table 5.4.2.1-1 and NREF is the NR-ARFCN. PNG media_image3.png 200 400 media_image3.png Greyscale Note: For 57-71 GHz band (n263), its frequency is in the range of 24250-100000 MHz. For frequency range 24250-100000 MHz, Per table 5.4.2.1-1, ΔF.sub.Global = 60 kHz, F.sub.REF-Offs =24250.08 MHz, N.sub.REF-Offs = 2016667.). Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to David Z Sun whose telephone number is (571)270-0750. The examiner can normally be reached Monday-Friday 0800am-0500pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Moo Jeong can be reached at 571-272-9617. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /D.Z.S./Examiner, Art Unit 2418 /WUTCHUNG CHU/Primary Examiner, Art Unit 2418
Read full office action

Prosecution Timeline

Apr 10, 2024
Application Filed
Apr 29, 2026
Non-Final Rejection mailed — §103
Aug 31, 2026
Response Filed
Nov 05, 2026
Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12795665
MULTI-PHYSICAL UPLINK CONTROL CHANNEL FOR MULTI-PHYSICAL DOWNLINK SHARED CHANNEL SCHEDULING
3y 4m to grant Granted Nov 10, 2026
Patent 12786787
JOINT LOW-DENSITY PARITY-CHECK CODING AND MODULATION DESIGNS
3y 5m to grant Granted Nov 03, 2026
Patent 12787101
DOWNLINK TRANSMISSION CONFIGURATION AND RECEIVING METHODS AND APPARATUSES, COMMUNICATION DEVICE AND STORAGE MEDIUM
2y 7m to grant Granted Nov 03, 2026
Patent 12764824
METHOD FOR CONTROLLING SIDELINK COMMUNICATION, AND APPARATUS THEREFOR
4y 0m to grant Granted Oct 13, 2026
Patent 12763827
BEAMFORMING FOR MULTIPLE-INPUT MULTIPLE-OUTPUT (MIMO) MODES IN OPEN RADIO ACCESS NETWORK (O-RAN) SYSTEMS
3y 1m to grant Granted Oct 13, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
90%
Grant Probability
99%
With Interview (+14.1%)
2y 11m (~3m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 113 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month