Prosecution Insights
Last updated: October 26, 2026
Application No. 18/703,866

METHODS AND APPARATUS FOR SSB DETECTION

Non-Final OA §103
Filed
Apr 23, 2024
Priority
Oct 29, 2021 — nonprovisional of PCTCN2021127472
Examiner
LIN, WILL W
Art Unit
2412
Tech Center
2400 — Computer Networks
Assignee
Lenovo (United States) Inc.
OA Round
2 (Non-Final)
94%
Grant Probability
Favorable
2-3
OA Rounds
0m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 94% — above average
94%
Career Allowance Rate
481 granted / 514 resolved
+35.6% vs TC avg
Moderate +6% lift
Without
With
+5.8%
Interview Lift
resolved cases with interview
Fast prosecutor
2y 1m
Avg Prosecution
22 currently pending
Career history
548
Total Applications
across all art units

Statute-Specific Performance

§101
5.9%
-34.1% vs TC avg
§103
59.5%
+19.5% vs TC avg
§102
3.6%
-36.4% vs TC avg
§112
19.0%
-21.0% vs TC avg
Black line = Tech Center average estimate • Based on career data from 514 resolved cases

Office Action

§103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . DETAILED ACTION This office action is in response to the application filed on 07/08/2026. Claims 1-20 are currently pending. Claims 1-9 and 11-20 are rejected. Claim 10 is objected to. Claims 1 and 14-16 are independent claims. - Response to Amendment - Claim Objection 6. Claim 14 is objected to because of the following informalities: “determine whether a first SSB is a cell defining SSB for a user equipment (UE) based on at least one of a value of a first parameter and a configuration of a first control resource set (CORESET) associated with a first synchronization signal and physical broadcast channel block (SSB)” should be “determine whether a first synchronization signal and physical broadcast channel block (SSB) is a cell defining SSB for a user equipment (UE) based on at least one of a value of a first parameter and a configuration of a first control resource set (CORESET) associated with the SSB”. Appropriate correction is required. Claim Rejections - 35 USC § 103 7. In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. 8. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102 of this title, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. 9. The factual inquiries set forth in Graham v. John Deere Co., 383 U.S. 1, 148 USPQ 459 (1966), that are applied for establishing a background for determining obviousness under pre-AIA 35 U.S.C. 103(a) are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. 10. Claims 1-9 and 11-20 are rejected under 35 U.S.C. 103 as being unpatentable over Naoya Shibaike et al. (US 2024/0373458 A1), hereinafter Shibaike, in view of Yang LIU et al. (US 2021/0022069 A1), hereinafter LIU. For claim 1, Shibaike teaches a user equipment (UE) (Shibaike, Fig. 11.), comprising: at least one memory (Shibaike, Fig. 11 item 1002.); and at least one processor (Shibaike, Fig. 11 item 1001.) coupled to the at least one memory and configured to cause the UE to: determine at least one of a value of a first parameter and a configuration of a first control resource set (CORESET) associated with a first synchronization signal and physical broadcast channel block (SSB) (Shibaike, Fig. 7 and paragraph 45 teach in step S1, the terminal 20 receives SSB and performs synchronization with the cell. In addition, the terminal 20 receives MIB (Master Information Block) via PBCH included in the SSB. In subsequent step S2, the terminal 20 monitors the Type0-PDCCH search space and receives CORESET #0 via PDCCH. In subsequent step S3, the terminal 20 receives SIB1 via PDSCH, based on the control information included in the CORESET #0. Paragraphs 130 further teach the “determining” may include a case in which “receiving” (e.g., receiving information).); determine a type of the first SSB based on at least one of the value of the first parameter and the configuration of the first CORESET (Shibaike, Fig. 7 and paragraph 45 teach in step S1, the terminal 20 receives SSB and performs synchronization with the cell. In addition, the terminal 20 receives MIB (Master Information Block) via PBCH included in the SSB. In subsequent step S2, the terminal 20 monitors the Type0-PDCCH search space and receives CORESET #0 via PDCCH. In subsequent step S3, the terminal 20 receives SIB1 via PDSCH, based on the control information included in the CORESET #0. Paragraphs 130 further teach the “determining” may include a case in which “receiving” (e.g., receiving information)). LIU further teaches determine a cell defining SSB for the UE based on the type of the first SSB; or determine a frequency range for searching the cell defining SSB for the UE based on the type of the first SSB (LIU, Fig. 4 step S407 and paragraph 76 teach the SSB position indication information is read in response to that the on-off indication information parsed from the PBCH of the SSB is the first value, and the position of the cell-defining SSB is searched for based on the SSB position indication information. In other words, LIU teaches “determine a cell defining SSB for the UE based on the type of the first SSB”. See also paragraphs 7-9.). It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the method taught in Shibaike with determine a cell defining SSB for the UE based on the type of the first SSB taught in LIU because both references teach determining SSB in the same technical filed, LIU explicitly teaches determine a cell defining SSB for the UE based on the type of the SSB, thereby reducing the search time[LIU: paragraph 53]. For claim 2, Shibaike and LEE further teach the UE of Claim 1, wherein the at least one processor is further configured to cause the UE to: determine the type of the first SSB is the cell defining SSB for the UE when the first parameter is within a range from 0 to 11, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 15kHz and 24 resource blocks (LIU, Fig. 2 and paragraphs 34 teach up to 10 SSB candidate positions may be configured in a case of 15 kHz SCS. In addition, in an SSB candidate position corresponding to PBCH-DMRS in each DBTW, one of up to 8 beams applied to the SSB may be transmitted. In addition, the PBCH payload may indicate MSBs of an SSB candidate position index and QCL (Quasi co-location) parameters. Note that the number of QCL parameters applied to the SSB may be {1, 2, 4, 8}. See also Fig. 3 and paragraphs 35-40. It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the method taught in Shibaike with LIU to have determine the type of the first SSB is the cell defining SSB for the UE when the first parameter is within a range from 0 to 11, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 15kHz and 24 resource blocks. Because it is common to modify the parameter in the technical field.). For claim 3, Shibaike and LEE further teach the UE of Claim 1, wherein the at least one processor is further configured to cause the UE to: determine the type of the first SSB is not the cell defining SSB for the UE and detect a second CORESET or a second SSB when the first parameter is within a range from 0 to 11, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 15kHz and 48 or 96 resource blocks (LIU, Fig. 2 and paragraphs 34 teach up to 10 SSB candidate positions may be configured in a case of 15 kHz SCS. In addition, in an SSB candidate position corresponding to PBCH-DMRS in each DBTW, one of up to 8 beams applied to the SSB may be transmitted. In addition, the PBCH payload may indicate MSBs of an SSB candidate position index and QCL (Quasi co-location) parameters. Note that the number of QCL parameters applied to the SSB may be {1, 2, 4, 8}. See also Fig. 3 and paragraphs 35-40. It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the method taught in Shibaike with LIU to have determine the type of the first SSB is not the cell defining SSB for the UE and detect a second CORESET or a second SSB when the first parameter is within a range from 0 to 11, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 15kHz and 48 or 96 resource blocks. Because it is common to modify the parameter in the technical field.). For claim 4, Shibaike and LEE further teach the UE of Claim 1, wherein the at least one processor is further configured to cause the UE to: determine the type of the first SSB is not the cell defining SSB for the UE and detect a second CORESET or a second SSB when the first parameter is within a range from 0 to 23, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 30 kHz (LIU, Fig. 2 and paragraphs 34 teach up to 10 SSB candidate positions may be configured in a case of 15 kHz SCS. In addition, in an SSB candidate position corresponding to PBCH-DMRS in each DBTW, one of up to 8 beams applied to the SSB may be transmitted. In addition, the PBCH payload may indicate MSBs of an SSB candidate position index and QCL (Quasi co-location) parameters. Note that the number of QCL parameters applied to the SSB may be {1, 2, 4, 8}. See also Fig. 3 and paragraphs 35-40. It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the method taught in Shibaike with LIU to have determine the type of the first SSB is not the cell defining SSB for the UE and detect a second CORESET or a second SSB when the first parameter is within a range from 0 to 11, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 15kHz and 48 or 96 resource blocks. Because it is common to modify the parameter in the technical field.). For claim 5, Shibaike and LEE further teach the UE of Claim 1, wherein the at least one processor is further configured to cause the UE to: determine the type of the first SSB is not a cell defining SSB for the UE; determine a second SSB based on the first SSB; determine whether the second SSB is a cell defining SSB for the UE based on a field in broadcast information; and detect the second SSB when it is a cell defining SSB; or detect a cell defining SSB for the UE when the second SSB is not the cell defining SSB (LIU, Fig. 2A and paragraph 36 teach the on-off indication information is to distinguish two scenarios by taking the first value or the second value. In scenario 1, two frequency bands of an operator are not separated by one frequency band of another operator. As shown in FIG. 2A, frequency band F1 and frequency band F2, both of which are owned by operator A, are contiguous, that is, there is no frequency band of another operator between them. Moreover, there is no cell-defining SSB in frequency band F1, and there is cell-defining SSB(s) in frequency band F2. In scenario 2, two frequency bands of an operator are separated by one frequency band of another operator, and there is cell-defining SSB(s) in the frequency band of another operator. As shown in FIG. 2B, frequency band Fl and frequency band F2 which both are owned by operator A are separated by a frequency band of another operator, that is frequency band f of operator B. Moreover, there is no cell-defining SSB in frequency band F1, there is cell-defining SSB(s) in frequency band F2 and in frequency band f.). For claim 6, Shibaike and LEE further teach the UE of Claim 1, wherein the at least one processor is further configured to cause the UE to: determine the type of the first SSB is not a cell defining SSB for the UE; determine whether there is a cell defining SSB for the UE within the frequency range based on a field in broadcast information; and detect the cell defining SSB for the UE within the frequency range; or detect a cell defining SSB for the UE out of the frequency range (LIU, Fig. 2A and paragraph 36 teach the on-off indication information is to distinguish two scenarios by taking the first value or the second value. In scenario 1, two frequency bands of an operator are not separated by one frequency band of another operator. As shown in FIG. 2A, frequency band F1 and frequency band F2, both of which are owned by operator A, are contiguous, that is, there is no frequency band of another operator between them. Moreover, there is no cell-defining SSB in frequency band F1, and there is cell-defining SSB(s) in frequency band F2. In scenario 2, two frequency bands of an operator are separated by one frequency band of another operator, and there is cell-defining SSB(s) in the frequency band of another operator. As shown in FIG. 2B, frequency band Fl and frequency band F2 which both are owned by operator A are separated by a frequency band of another operator, that is frequency band f of operator B. Moreover, there is no cell-defining SSB in frequency band F1, there is cell-defining SSB(s) in frequency band F2 and in frequency band f. See also paragraphs 5-6.). For claim 7, Shibaike and LEE further teach the UE of Claim 1, wherein the at least one processor is further configured to cause the UE to: determine the type of the first SSB is not a cell defining SSB for the UE; determine a frequency offset for a cell defining SSB for the UE based on one or more fields in broadcast information; and detect a cell defining SSB for the UE based on the frequency offset (LIU, Fig. 2A and paragraph 36 teach the on-off indication information is to distinguish two scenarios by taking the first value or the second value. In scenario 1, two frequency bands of an operator are not separated by one frequency band of another operator. As shown in FIG. 2A, frequency band F1 and frequency band F2, both of which are owned by operator A, are contiguous, that is, there is no frequency band of another operator between them. Moreover, there is no cell-defining SSB in frequency band F1, and there is cell-defining SSB(s) in frequency band F2. In scenario 2, two frequency bands of an operator are separated by one frequency band of another operator, and there is cell-defining SSB(s) in the frequency band of another operator. As shown in FIG. 2B, frequency band Fl and frequency band F2 which both are owned by operator A are separated by a frequency band of another operator, that is frequency band f of operator B. Moreover, there is no cell-defining SSB in frequency band F1, there is cell-defining SSB(s) in frequency band F2 and in frequency band f. See also paragraphs 5-6, 40-41.). For claim 8, Shibaike and LEE further teach the UE of claim 7, wherein the frequency offset is associated with a frequency position of the first SSB or a second SSB (LIU, paragraphs39-41.). For claim 9, Shibaike and LEE further teach the UE of Claim 1, wherein the at least one processor is further configured to cause the UE to: determine the first SSB as a cell defining SSB for the UE when the first parameter is within a range from 12 to 23 (LIU, paragraph 39 teaches In the PBCH, there are a first preset number of redundant bits and a second preset number of frequency offset reserved bits. The first preset number may be 8, and the second preset number may also be 8.). For claim 11, Shibaike and LEE further teach the UE of Claim 1, wherein a dedicated master information block in the first SSB indicates a dedicated CORESET for the UE (Shibaike, paragraph 32 teaches in addition to the 120 kHz SCS. SSB with 480 kHz SCS may be supported. Initial access supporting CORESET (Control Resource Set) #0/Type0-PDCCH included in the MIB, may be performed by the SSB. However, there may be the following limitations. For example, entry numbers of the synchronization raster may be limited. In addition, only CORESET #0/Type0-PDCCH with 480 kHz SCS may be supported in a case of SSB with 480 kHz SCS. Furthermore, SSB-CORESET multiplexing pattern 1 (SS/PBCH block and CORESET multiplexing pattern 1) may be prioritized.). For claim 12, Shibaike and LEE further teach the UE of Claim 11, wherein a configuration of the dedicated CORESET includes less resource blocks (RB) than 24 RBs or more than 3 orthogonal frequency division multiplexing (OFDM) symbols (Shibaike, Fig. 3 and paragraph 35.). For claim 13, Shibaike and LEE further teach the UE of Claim 11, wherein a starting position of the dedicated CORESET for the UE is higher than a starting position of the first SSB in frequency domain (Shibaike, Fig. 4 and paragraph 41.). For claim 14, Shibaike teaches a base station (BS) (Shibaike, Fig. 11.), comprising: at least one memory (Shibaike, Fig. 11 item 1002.); and at least one processor (Shibaike, Fig. 11 item 1001.) coupled to the at least one memory and configured to cause the BS to: determine and transmit a first SSB based on at least one of a value of a first parameter and a configuration of a first control resource set (CORESET) associated with a first synchronization signal and physical broadcast channel block (SSB) (Shibaike, Fig. 7 and paragraph 45 teach in step S1, the terminal 20 receives SSB and performs synchronization with the cell. In addition, the terminal 20 receives MIB (Master Information Block) via PBCH included in the SSB. In subsequent step S2, the terminal 20 monitors the Type0-PDCCH search space and receives CORESET #0 via PDCCH. In subsequent step S3, the terminal 20 receives SIB1 via PDSCH, based on the control information included in the CORESET #0. Paragraph 130 further teaches the “determining” may include a case in which “receiving” (e.g., receiving information), “transmitting” (e.g., transmitting information).); LIU further teaches determine a cell defining SSB for the UE based on the first SSB; or determine a frequency range for searching the cell defining SSB for the UE based on the type of the first SSB (LIU, Fig. 4 step S407 and paragraph 76 teach the SSB position indication information is read in response to that the on-off indication information parsed from the PBCH of the SSB is the first value, and the position of the cell-defining SSB is searched for based on the SSB position indication information. In other words, LIU teaches “determine a cell defining SSB for the UE based on the type of the first SSB”. See also paragraphs 7-9.). and transmit the cell defining SSB for the UE when the first SSB is not the cell defining SSB for the UE (LIU, paragraph 9 teaches set, in response to that the on-off indication information is the second value, gap indication information in the PBCH to indicate that there is no cell-defining SSB within a range of a current frequency band, where the range has a length of a gap value and is centered at a position of the current SSB; and send the SSB to UE.) It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the method taught in Shibaike with determine a cell defining SSB for the UE based on the first SSB; or determine a frequency range for searching the cell defining SSB for the UE based on the type of the first SSB; and transmit the cell defining SSB for the UE when the first SSB is not the cell defining SSB for the UE taught in LIU. Because both references teach determining SSB in the same technical filed, LIU explicitly teaches determine a cell defining SSB for the UE based on the first SSB; or determine a frequency range for searching the cell defining SSB for the UE based on the type of the first SSB; and transmit the cell defining SSB for the UE when the first SSB is not the cell defining SSB for the UE, thereby reducing the search time [LIU: paragraph 53]. For claim 15, Shibaike teaches a method performed by a user equipment (UE) (Shibaike, Fig. 11.), the method comprising: determining at least one of a value of a first parameter and a configuration of a first control resource set (CORESET) associated with a first synchronization signal and physical broadcast channel block (SSB) (Shibaike, Fig. 7 and paragraph 45 teach In step S1, the terminal 20 receives SSB and performs synchronization with the cell. In addition, the terminal 20 receives MIB (Master Information Block) via PBCH included in the SSB. In subsequent step S2, the terminal 20 monitors the Type0-PDCCH search space and receives CORESET #0 via PDCCH. In subsequent step S3, the terminal 20 receives SIB1 via PDSCH, based on the control information included in the CORESET #0. Paragraphs 130 further teach the “determining” may include a case in which “receiving” (e.g., receiving information)); determine a type of the first SSB based on at least one of the value of the first parameter and the configuration of the first CORESET (Shibaike, Fig. 7 and paragraph 45 teach In step S1, the terminal 20 receives SSB and performs synchronization with the cell. In addition, the terminal 20 receives MIB (Master Information Block) via PBCH included in the SSB. In subsequent step S2, the terminal 20 monitors the Type0-PDCCH search space and receives CORESET #0 via PDCCH. In subsequent step S3, the terminal 20 receives SIB1 via PDSCH, based on the control information included in the CORESET #0. Paragraphs 130 further teach the “determining” may include a case in which “receiving” (e.g., receiving information)). LIU further teaches determining a cell defining SSB for the UE based on the type of the first SSB; or determining a frequency range for searching the cell defining SSB for the UE based on the type of the first SSB (LIU, Fig. 4 step S407 and paragraph 76 teach the SSB position indication information is read in response to that the on-off indication information parsed from the PBCH of the SSB is the first value, and the position of the cell-defining SSB is searched for based on the SSB position indication information. In other words, LIU teaches “determine a cell defining SSB for the UE based on the type of the first SSB”. See also paragraphs 7-9.). It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the method taught in Shibaike with determining a cell defining SSB for the UE based on the type of the first SSB taught in LIU because both references teach determining SSB in the same technical filed, LIU explicitly teaches determine a cell defining SSB for the UE based on the type of the SSB, thereby reducing the search time[LIU: paragraph 53]. For claim 16, Shibaike teaches a processor for wireless communication (Shibaike, Fig. 11.) comprising: at least one controller (Shibaike, Fig. 11 item 1001.) coupled with at least one memory and configured to cause the processor to: determine at least one of a value of a first parameter and a configuration of a first control resource set (CORESET) associated with a first synchronization signal and physical broadcast channel block (SSB) (Shibaike, Fig. 7 and paragraph 45 teach In step S1, the terminal 20 receives SSB and performs synchronization with the cell. In addition, the terminal 20 receives MIB (Master Information Block) via PBCH included in the SSB. In subsequent step S2, the terminal 20 monitors the Type0-PDCCH search space and receives CORESET #0 via PDCCH. In subsequent step S3, the terminal 20 receives SIB1 via PDSCH, based on the control information included in the CORESET #0. Paragraphs 130 further teach the “determining” may include a case in which “receiving” (e.g., receiving information).); determine a type of the first SSB based on at least one of the value of the first parameter and the configuration of the first CORESET (Shibaike, Fig. 7 and paragraph 45 teach In step S1, the terminal 20 receives SSB and performs synchronization with the cell. In addition, the terminal 20 receives MIB (Master Information Block) via PBCH included in the SSB. In subsequent step S2, the terminal 20 monitors the Type0-PDCCH search space and receives CORESET #0 via PDCCH. In subsequent step S3, the terminal 20 receives SIB1 via PDSCH, based on the control information included in the CORESET #0. Paragraphs 130 further teach the “determining” may include a case in which “receiving” (e.g., receiving information)). LIU further teaches determine a cell defining SSB for the UE based on the type of the first SSB; or determine a frequency range for searching the cell defining SSB for the UE based on the type of the first SSB (LIU, Fig. 4 step S407 and paragraph 76 teach the SSB position indication information is read in response to that the on-off indication information parsed from the PBCH of the SSB is the first value, and the position of the cell-defining SSB is searched for based on the SSB position indication information. In other words, LIU teaches “determine a cell defining SSB for the UE based on the type of the first SSB”.). It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the method taught in Shibaike with determine a cell defining SSB for the UE based on the type of the first SSB taught in LIU because both references teach determining SSB in the same technical filed, LIU explicitly teaches determine a cell defining SSB for the UE based on the type of the SSB, thereby reducing the search time[LIU: paragraph 53]. For claim 17, Shibaike and LEE further teach the processor of claim 16, wherein the at least one controller is further configured to cause the processor to: determine the type of the first SSB is the cell defining SSB for the processor when the first parameter is within a range from 0 to 11, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 15kHz and 24 resource blocks (LIU, Fig. 2 and paragraphs 34 teach up to 10 SSB candidate positions may be configured in a case of 15 kHz SCS. In addition, in an SSB candidate position corresponding to PBCH-DMRS in each DBTW, one of up to 8 beams applied to the SSB may be transmitted. In addition, the PBCH payload may indicate MSBs of an SSB candidate position index and QCL (Quasi co-location) parameters. Note that the number of QCL parameters applied to the SSB may be {1, 2, 4, 8}. See also Fig. 3 and paragraphs 35-40. It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the method taught in Shibaike with LIU to have determine the type of the first SSB is the cell defining SSB for the UE when the first parameter is within a range from 0 to 11, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 15kHz and 24 resource blocks. Because it is common to modify the parameter in the technical field.). For claim 18, Shibaike and LEE further teach the processor of claim 16, wherein the at least one controller is further configured to cause the processor to determine the type of the first SSB is not the cell defining SSB for the UE and detect a second CORESET or a second SSB when the first parameter is within a range from 0 to 11, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 15kHz and 48 or 96 resource blocks (LIU, Fig. 2 and paragraphs 34 teach up to 10 SSB candidate positions may be configured in a case of 15 kHz SCS. In addition, in an SSB candidate position corresponding to PBCH-DMRS in each DBTW, one of up to 8 beams applied to the SSB may be transmitted. In addition, the PBCH payload may indicate MSBs of an SSB candidate position index and QCL (Quasi co-location) parameters. Note that the number of QCL parameters applied to the SSB may be {1, 2, 4, 8}. See also Fig. 3 and paragraphs 35-40. It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the method taught in Shibaike with LIU to have determine the type of the first SSB is not the cell defining SSB for the UE and detect a second CORESET or a second SSB when the first parameter is within a range from 0 to 11, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 15kHz and 48 or 96 resource blocks. Because it is common to modify the parameter in the technical field.). For claim 19, Shibaike and LEE further teach the processor of claim 16, wherein the at least one controller is further configured to cause the processor to: determine the type of the first SSB is not the cell defining SSB for the UE and detect a second CORESET or a second SSB when the first parameter is within a range from 0 to 23, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 30 kHz (LIU, Fig. 2 and paragraphs 34 teach up to 10 SSB candidate positions may be configured in a case of 15 kHz SCS. In addition, in an SSB candidate position corresponding to PBCH-DMRS in each DBTW, one of up to 8 beams applied to the SSB may be transmitted. In addition, the PBCH payload may indicate MSBs of an SSB candidate position index and QCL (Quasi co-location) parameters. Note that the number of QCL parameters applied to the SSB may be {1, 2, 4, 8}. See also Fig. 3 and paragraphs 35-40. It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the method taught in Shibaike with LIU to have determine the type of the first SSB is not the cell defining SSB for the UE and detect a second CORESET or a second SSB when the first parameter is within a range from 0 to 11, and the configuration indicates the first CORESET is configured with a subcarrier spacing (SCS) of 15kHz and 48 or 96 resource blocks. Because it is common to modify the parameter in the technical field.). For claim 20, Shibaike and LEE further teach the processor of claim 16, wherein the at least one controller is further configured to cause the processor to: determine the type of the first SSB is not a cell defining SSB for the UE; determine a second SSB based on the first SSB; determine whether the second SSB is a cell defining SSB for the UE based on a field in broadcast information; and detect the second SSB when it is a cell defining SSB; or detect a cell defining SSB for the UE when the second SSB is not the cell defining SSB (LIU, Fig. 2A and paragraph 36 teach the on-off indication information is to distinguish two scenarios by taking the first value or the second value. In scenario 1, two frequency bands of an operator are not separated by one frequency band of another operator. As shown in FIG. 2A, frequency band F1 and frequency band F2, both of which are owned by operator A, are contiguous, that is, there is no frequency band of another operator between them. Moreover, there is no cell-defining SSB in frequency band F1, and there is cell-defining SSB(s) in frequency band F2. In scenario 2, two frequency bands of an operator are separated by one frequency band of another operator, and there is cell-defining SSB(s) in the frequency band of another operator. As shown in FIG. 2B, frequency band Fl and frequency band F2 which both are owned by operator A are separated by a frequency band of another operator, that is frequency band f of operator B. Moreover, there is no cell-defining SSB in frequency band F1, there is cell-defining SSB(s) in frequency band F2 and in frequency band f.). Allowable Subject Matter 11. Claim 10 is objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. The following is a statement of reason for the indication of allowable subject matter: 12. Claim 10 is considered allowable because the prior art does not teach limitations including: " wherein a subcarrier offset between a first resource block (RB) of the first SSB and a common RB is the first parameter minus 12.” Response to Arguments 13. Applicant's arguments filed 07/08/2026 have been fully considered but they are moot because of the new ground of rejection. Conclusion 14. Any inquiry concerning this communication or earlier communications from the examiner should be directed to WILL W LIN whose telephone number is (571)272-8749. The examiner can normally be reached M-F 8:00-5:00. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Charles Jiang can be reached at 571-270-7191. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /WILL W LIN/Primary Examiner, Art Unit 2412
Read full office action

Prosecution Timeline

Apr 23, 2024
Application Filed
Apr 08, 2026
Non-Final Rejection mailed — §103
Jul 08, 2026
Response Filed
Oct 09, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12772134
METHOD AND APPARATUS FOR HANDOVER OF URBAN AIR MOBILITY IN COMMUNICATION SYSTEM
2y 11m to grant Granted Oct 20, 2026
Patent 12772242
TERMINAL AND COMMUNICATION METHOD
2y 7m to grant Granted Oct 20, 2026
Patent 12745307
SESSION ESTABLISHMENT IN A WIRELESS NETWORK IN VIEW OF INTERFACE FAILURE
2y 9m to grant Granted Sep 22, 2026
Patent 12720641
Small Data Transmission
3y 6m to grant Granted Aug 25, 2026
Patent 12720429
METHOD AND APPARATUS FOR DETERMINING A TIME WINDOW, AND CHIP
2y 8m to grant Granted Aug 25, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

2-3
Expected OA Rounds
94%
Grant Probability
99%
With Interview (+5.8%)
2y 1m (~0m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 514 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month