Prosecution Insights
Last updated: October 26, 2026
Application No. 18/708,575

DEVICE AND METHOD FOR PROCESSING HYBRID AUTOMATIC REPEAT REQUEST (HARQ) ROUND TRIP TIME (RTT) TIMER IN SIDELINK DISCONTINUOUS RECEPTION (DRX) OPERATION IN WIRELESS COMMUNICATION SYSTEM

Final Rejection §103
Filed
May 08, 2024
Priority
Nov 08, 2021 — provisional 63/276,956 +1 more
Examiner
CHOWDHURY, MAHBUBUL BAR
Art Unit
2475
Tech Center
2400 — Computer Networks
Assignee
Samsung Electronics Co., Ltd.
OA Round
2 (Final)
84%
Grant Probability
Favorable
3-4
OA Rounds
0m
Est. Remaining
98%
With Interview

Examiner Intelligence

Grants 84% — above average
84%
Career Allowance Rate
266 granted / 318 resolved
+25.6% vs TC avg
Moderate +15% lift
Without
With
+14.9%
Interview Lift
resolved cases with interview
Typical timeline
2y 4m
Avg Prosecution
30 currently pending
Career history
355
Total Applications
across all art units

Statute-Specific Performance

§101
1.8%
-38.2% vs TC avg
§103
52.0%
+12.0% vs TC avg
§102
19.4%
-20.6% vs TC avg
§112
22.7%
-17.3% vs TC avg
Black line = Tech Center average estimate • Based on career data from 318 resolved cases

Office Action

§103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Response to Amendment The following is a final office action in response to applicant’s reply, filed on 07/22/2026, to the Non-Final Office Action mailed on 04/22/2026. Claims 1-3, 5-9, 11, and 12 are amended. Claims 4 and 10 are canceled. Claims 1-3, 5-9, and 11-16 are pending and addressed below. Applicant’s amendment has overcome claims 1 and 7 objection, previously set forth in the non-final office action. Claim Rejections - 35 USC § 103 Claims 1-3, 5-9, 11-13 and 15 are rejected under 35 U.S.C. 103 as being unpatentable over PARK; Giwon et al US 20230164768 A1, hereinafter PARK, in view of IDS Reference, R2-211002, Apple, Discussion on Remaining issues of SL DRX, 3GPP TSG-RAN WG2 Meeting #116-e, Date Uploaded in 3GPP meeting 20211022, hereinafter NPL-A. Regarding claims 1 and 7, PARK teaches, a method of a first terminal for performing a sidelink wireless communication in a wireless communication system (PARK [7] “An object of the present disclosure is to provide a sidelink (SL) communication method between devices (or UEs) …”), the method comprising: identifying whether resource reservation information is included in sidelink control information (SCI) (“resource reservation information” is interpreted, under BRI and in line with the Spec, as resource timing for future transmission e.g., retransmission. PARK [126] TABLE 7 “19: Working assumption: SL HARQ RTT timer can be derived from the retransmission resource timing when the SCI indicates a retransmission resource.”, teaches when SCI includes retransmission resource timing (=resource reservation information), SL HARQ RTT timer is derived from the retransmission resource timing. It is inherent that UE identifies that SCI includes the information). PARK does not expressly teach, however, in the same field of endeavor, NPL-A teaches, receiving, from a second terminal, sidelink discontinuous reception (DRX) configuration information including first sidelink HARQ RTT timer information associated with HARQ feedback enabled and second sidelink HARQ RTT timer information associated with HARQ feedback disabled (NPL-A 2.3 Configuration of SL HARQ RTT timer page 3 “Agreement on HARQ-related SL DRX timer]: 9: “HARQ RTT is supported for both HARQ enabled and HARQ disabled cases by allowing HARQ RTT timer to be set to different values.“; page 4, lines-1-9, 10-18 describing Option 1, lines 1-2 “Based on RAN2 agreements, a Sidelink RX UE is supposed to maintain a SL HARQ RTT timer per SL HARQ process per SRC/DST address pair, based on its SL-DRX configuration.”, teaches configured DRX timer information comprising HARQ RTT Timer for HARQ enabled and HARQ disabled cases, therefore, implying receiving SL DRX configuration information); if the resource reservation information is not included in the SCI, identifying whether HARQ feedback enabled is configured; if HARQ feedback enabled is configured, identifying a sidelink HARQ RTT timer based on the first sidelink HARQ RTT timer information associated with HARQ feedback enabled (NPL-A page 4, line 5, 9 “Option 1 is the explicit configuration of HARQ RTT timer. … UE need to be configured with the HARQ RTT timer value … depending on whether HARQ feedback is enabled or disabled”, page 4, lines-17-18 “Option 1 is only needed for the case that when retransmission time is not indicated in SCI …”, Figure. 2 depicts “FB-disabled and FB-enabled HARQ RTT timer”, suggesting determination of HARQ feedback configuration (enabled/disabled) before applying the corresponding HARQ RTT Timer); and starting the sidelink HARQ RTT timer (Implied in NPL-A). Therefore, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the invention of PARK to include the features as taught by NPL-A above in order for an enhanced SL DRX configuration design for next generation wireless systems (NPL-A Introduction). With respect to claim 7, claim recites the identical features of claim 1 for a corresponding terminal. Therefore, it is subjected to the same rejection. PARK further teaches, a terminal performing sidelink wireless communication in a wireless communication system, the terminal comprising: a transceiver; and a controller (see PARK FIG.16). Regarding claims 2 and 8, PARK, in view of NPL-A, teaches the method/terminal, as outlined in the rejection of claims 1 and 7. NPL-A further teaches, further comprising: if HARQ feedback disabled is configured, identifying a sidelink HARQ RTT timer based on the second sidelink HARQ RTT timer information associated with HARQ feedback disabled; and starting the sidelink HARQ RTT timer (see the citations and explanation in the rejection of claims 1 and 7 above, for HARQ feedback disabled case). Regarding claims 3 and 9, PARK, in view of NPL-A, teaches the method/terminal, as outlined in the rejection of claims 1 and 7. PARK further teaches, wherein the deriving includes: if the resource reservation information is included in the SCI, deriving a sidelink HARQ RTT timer based on the resource reservation information (PARK [126] TABLE 7 “19: Working assumption: SL HARQ RTT timer can be derived from the retransmission resource timing when the SCI indicates a retransmission resource.”, teaches when SCI includes retransmission resource timing (=resource reservation information), SL HARQ RTT timer is derived from the retransmission resource timing). Regarding claims 5 and 11, PARK, in view of NPL-A, teaches the method/terminal, as outlined in the rejection of claims 1 and 7. PARK further teaches, wherein starting the sidelink HARQ RTT timer comprises further comprising: transmitting HARQ feedback; and starting the sidelink HARQ RTT timer in a slot of a preconfigured point after transmitting an acknowledgement (ACK) or a negative acknowledgement (NACK) (PARK [112] “when an RX UE successfully decodes a PSCCH (Sidelink Control Information) transmitted by a TX UE, but fails to decode the PSSCH and transmits a HARQ NACK to the TX UE, the RX UE may start a Sidelink HARQ-RTT-Timer-RX timer and transition to sleep mode.”, [126] TABLE 7 “22: For transmissions with HARQ feedback, the RX UE starts SL HARQ RTT timer in the symbol/ slot following the end of PSFCH transmission.”, teaches sending NACK for decoding failure of a HARQ, and starting HARQ RTT timer in the symbol/ slot following the end of PSFCH transmission, that carries NACK information). Regarding claims 6 and 12, PARK, in view of NPL-A, teaches the method/terminal, as outlined in the rejection of claims 1 and 7. PARK further teaches, further comprising: receiving, from the second terminal, the SCI (This is a well-known feature of SL DRX operation. See also PARK [0167] “Referring to FIG. 8, if an RX UE supporting a SL DRX operation receives a SCI (e.g., the SCI including reservation transmission scheduling information for PSSCH (i.e., SL data) reception) transmitted by a TX UE, the RX UE may maintain an active state until the RX UE receives all PSCCHs/PSSCHs (e.g., up to three PSSCHs) transmitted by the TX UE using the reserved transmission resource(s). Thereby, the RX UE may monitor (or receive) the PSCCHs/PSSCHs transmitted by the TX UE.”, and [106]). Regarding claims 13 and 15, PARK, in view of NPL-A, teaches the method/terminal, as outlined in the rejection of claims 1 and 7. NPL-A further teaches, wherein the first sidelink HARQ RTT timer information and the second sidelink HARQ RTT timer information are associated with unicast (NPL-A page 5, “For all the cases where an explicitly configured SL HARQ RTT timer value is to be used, as shown in the last column as 1A/1B/1C in Table 1. Here, we assume the UE implementation can choose the appropriate value (1A vs. 1B vs. 1C) for SL unicast case, …”). Claims 14 and 16 are rejected under 35 U.S.C. 103 as being unpatentable over PARK, in view of NPL-A, as applied to the rejection of claims 1 and 7, and further in view of LEE; Seungmin et al US 20220030580 A1, hereinafter LEE. Regarding claims 14 and 16, PARK, in view of NPL-A, teaches the method/terminal, as outlined in the rejection of claims 1 and 7. PARK and NPL-A do not expressly teach, however, in the same field of endeavor, LEE teaches, further comprising: transmitting, to the second terminal, assistance information including preferred sidelink DRX configuration information, wherein the preferred sidelink DRX configuration information includes information on a sidelink on-duration timer and information on a sidelink DRX slot offset (LEE claim 23 “wherein based on the first UE receiving assistance information from the second UE, the DRX configuration is determined by the first UE based on the assistance information.”, claim 25 “wherein the assistance information includes a desired DRX configuration of the second UE”, claim 26 “wherein the desired DRX configuration includes at least one of a desired DRX cycle and a desired DRX offset”). Therefore, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the invention of PARK and NPL-A to include the features as taught by LEE above to provide a method where a UE having limited frequency band capability may easily perform D2D operations without experiencing any interference, and power consumption of the UE that may be caused interference may be reduced. Thus, more power-efficient D2D operations may be performed (LEE [0022]). Response to Arguments Applicant's arguments filed on 07/22/2026 have been fully considered but they are not persuasive. Applicant argues in Remarks page 11 and 12 “NPL-A further discloses "the value(s) of the SL HARQ RTT Timer, when explicitly configured and not determined via SCI (if agreed to do so), is determined by UE or NW implementation." Id. NPL-A leaves the determination of the timer value as a matter of UE or NW implementation. In contrast, the amended claim 1 describes that a terminal receives sidelink DRX configuration information including first sidelink HARQ RTT timer information associated with HARQ feedback enabled and second sidelink HARQ RTT timer information associated with HARQ feedback disabled. The amended claim 1 recites the content of the sidelink DRX configuration information for the first and second sidelink HARQ RTT timer. NPL-A never teaches the content of the sidelink DRX configuration information as recited in the amended claim 1.”. Examiner respectfully disagrees. Applicant acknowledged in page 11 above the cited remarks here that NPL-A teaches all the feature of the claim 1 including the support of HARQ-related DRX timer including separate HARQ RTT timers for both HARQ enabled and disabled. It is inherent the DRX timers are provided in DRX configuration (see also NPL-A page 4, lines-1-9, 10-18 describing Option 1, lines 1-2 “Based on RAN2 agreements, a Sidelink RX UE is supposed to maintain a SL HARQ RTT timer per SL HARQ process per SRC/DST address pair, based on its SL-DRX configuration.”. Moreover, the exact value of the HARQ RTT Timer and how it is determined is not part of the claim or the invention, claim is about DRX configuration includes HARQ RTT timers. Therefore, applicant’s argument that values of the timers are dependent of UE or NW implementation is irrelevant. Applicant further argues in Remarks page 12 “The amended claim 1 further describes that, if HARQ feedback enabled is configured, the terminal identifies a sidelink HARQ RTT timer based on the first sidelink HARQ RTT timer information associated with HARQ feedback enabled and starts the sidelink HARQ RTT timer. While NPL-A discloses SL HARQ RTT timer, NPL-A fails to disclose that the sidelink HARQ RTT timer is identified based on the sidelink HARQ RTT timer information as recited in the amended claim 1. NPL-A merely discloses a general architecture and a general-principle agreement permitting different timer values to be used for the HARQ-enabled and HARQ-disabled cases, respectively. In contrast, the amended claim 1 recites the specific condition and operation of the terminal to identify a sidelink HARQ RTT timer based on the first sidelink HARQ RTT timer information associated with HARQ feedback enabled. Furthermore, NPL-A explicitly leaves the determination of the timer value as a matter of UE or NW implementation, which distinguish the claimed elements of the amended claims away from the reference of NPL-A. Therefore, neither explicitly nor implicitly, Park, Ko, and NPL-A, alone or in combination, do not disclose the claimed elements of the amended claim 1”. Examiner respectfully disagrees. NPL-A discloses first separate HARQ RTT timers for HARQ enabled and HARQ disabled cases. Therefore, when NPL-A recites using configured HARQ timers when SCI does not include reservation resource, it is inherent that it refers to HARQ enabled and HARQ disabled timers. See also NPL-A Fig. 2. Examiner’s Note Applicant is advised to check the pertinent prior art of Freda; Martino, US 20240414809 A1 (e.g., Para [112], [121]-[122], [158], [272], [433], [466]), that also reads on the claims of the applicant’s invention. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Freda; Martino, US 20240414809 A1 - METHODS, ARCHITECTURES, APPARATUSES AND SYSTEMS FOR PERFORMING DISCONTINUOUS RECEPTION ON SIDELINK; Para [112], [121]-[122], [158], [272], [433], [466]. HONG; Sung-pyo, US 20220346011 A1 - METHOD FOR CONTROLLING SIDELINK COMMUNICATION, AND DEVICE THEREFOR; claims 18, 22-23. Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any extension fee pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to MAHBUBUL BAR CHOWDHURY whose telephone number is (571)272-0232. The examiner can normally be reached on Monday-Thursday 9AM-5PM EST; Friday variable. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Khaled Kassim can be reached on 571-270-3770. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /MAHBUBUL BAR CHOWDHURY/Primary Examiner, Art Unit 2475
Read full office action

Prosecution Timeline

May 08, 2024
Application Filed
Apr 22, 2026
Non-Final Rejection mailed — §103
Jul 22, 2026
Response Filed
Oct 05, 2026
Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12771511
DETAILS FOR 8 PORTS SRS MAPPING TO MULTIPLE OFDM SYMBOLS
2y 10m to grant Granted Oct 20, 2026
Patent 12756504
METHOD AND DEVICE FOR SUPPORTING SIDELINK DRX ON BASIS OF MODE 1 CG RESOURCE IN NR V2X
3y 5m to grant Granted Oct 06, 2026
Patent 12745059
Reference Signal Configuration for Location Estimation of Reduced Capacity Devices
4y 1m to grant Granted Sep 22, 2026
Patent 12732323
TERMINAL AND COMMUNICATION METHOD
2y 11m to grant Granted Sep 08, 2026
Patent 12713367
METHODS FOR COMMUNICATING SYNCHRONIZATION SIGNALS USING CYCLIC SHIFTS
3y 2m to grant Granted Aug 18, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
84%
Grant Probability
98%
With Interview (+14.9%)
2y 4m (~0m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 318 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email