Prosecution Insights
Last updated: October 25, 2026
Application No. 18/724,334

METHOD AND APPARATUS FOR ENHANCEMENTS ON PHYSICAL DOWNLINK CONTROL CHANNEL (PDCCH) MONITORING ADAPTATION

Non-Final OA §103
Filed
Jun 26, 2024
Priority
Jan 11, 2022 — provisional 63/298,352 +2 more
Examiner
BLANTON, JOHN D
Art Unit
2466
Tech Center
2400 — Computer Networks
Assignee
MediaTek Inc.
OA Round
2 (Non-Final)
78%
Grant Probability
Favorable
2-3
OA Rounds
7m
Est. Remaining
86%
With Interview

Examiner Intelligence

Grants 78% — above average
78%
Career Allowance Rate
806 granted / 1038 resolved
+19.6% vs TC avg
Moderate +8% lift
Without
With
+8.4%
Interview Lift
resolved cases with interview
Typical timeline
2y 11m
Avg Prosecution
26 currently pending
Career history
1082
Total Applications
across all art units

Statute-Specific Performance

§101
2.6%
-37.4% vs TC avg
§103
57.2%
+17.2% vs TC avg
§102
17.8%
-22.2% vs TC avg
§112
12.1%
-27.9% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1038 resolved cases

Office Action

§103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Response to Arguments Applicant’s arguments, see Applicant’s Response, filed 9/4/2026, with respect to the rejection(s) of claim(s) 1-3, 5-9, 11-14, and 16-20 under Huawei have been fully considered and are persuasive. Therefore, the rejection has been withdrawn. However, upon further consideration, a new ground(s) of rejection is made in view of Huawei and Ouchi. Applicant's arguments, regarding claim 15 now incorporated into claim 13, filed 9/4/2026 have been fully considered but they are not persuasive. On page 9 of the Applicant’s Response, Applicant: “Specifically, Proposal 17 and Section 8 of Huawei merely discuss that a UE performs PDCCH monitoring during the running time of a DL retransmission timer upon receiving a NACK, and notes that applying such monitoring for uplink transmission may result in unnecessary power consumption. Huawei does not disclose or teach resuming PDCCH monitoring after a timing offset following the transmission of the HARQ NACK or the UL data.“. Examiner respectfully disagrees with Applicant’s argument. Huawei discloses resuming PDCCH monitoring after a NACK is received or uplink data is transmitted. In one embodiment, the PDCCH monitoring is resumed after a timing offset equal to the RTT timer from the end of the NACK received to the start of the retransmission timer (figure 6). In view of the above discussions the rejection of claims 1-3, 5-9, 11-14, and 16-20 still stands. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claim(s) 1-3, 5-9, 11-14, and 16-20 is/are rejected under 35 U.S.C. 103 as being unpatentable over Huawei et al. (“Extensions to Rel-16 DCI-based power saving adaptation for an active BWP”, R1-2110840, 11/2021) (“Huawei”) in view of Ouchi et al. (US 2023/0068855) (“Ouchi”). For claims 1 and 7; Huawei discloses: detecting, by a processor of an apparatus, a scheduling downlink control information (DCI) format from a network node of a wireless network (Section 3, 3.1, Proposal 8: At most 2 bit indication in self-scheduling DCIs (i.e., DCI format 1-1/0-1/1-2/0-2) can be specified for triggering the PDCCH monitoring adaptation in a single cell… Proposal 8: Use 2-bits new indication field in scheduling DCI formats, as that in draft CR of TS38.212, to indicate PDCCH monitoring occasion when only single cell is configured), wherein the scheduling DCI format indicates a duration for skipping physical downlink control channel (PDCCH) monitoring (Section 2.2: The UE can be configured to be indicated by DCI a value of X slots (i.e., skipping duration) among multiple RRC configured values by scheduling DCIs indicating PDCCH schedules data… The bits for indicating PDCCH monitoring adaptation also indicating skipping duration); and performing, by the processor, PDCCH monitoring based on a setting of a new active downlink (DL) bandwidth part (BWP) in a case that the apparatus changes to the new active DL BWP by an expiration of a BWP inactive timer in the duration (Section 6, Proposal 14: Proposal 14: If the active BWP is switched due to the expiration of bwp-InactivityTimer before the end of the PDCCH skipping duration, the default behavior on the new active BWP, i.e., default BWP, is - UE starts monitoring PDCCH according to configured SS sets if SSSG is not configured on the new active BWP; - UE starts monitoring PDCCH according to SS set in SSSG0 if SSSG is configured on the new active BWP); setting of the new active DL BWP in a case that the apparatus changes to the new active DL BWP by the expiration of the BWP inactive timer in the duration (Section 6, Proposal 14: Proposal 14: If the active BWP is switched due to the expiration of bwp-InactivityTimer before the end of the PDCCH skipping duration, the default behavior on the new active BWP, i.e., default BWP, is - UE starts monitoring PDCCH according to configured SS sets if SSSG is not configured on the new active BWP; - UE starts monitoring PDCCH according to SS set in SSSG0 if SSSG is configured on the new active BWP). Huawei does not expressly disclose, but Ouchi from similar fields of endeavor teaches: resetting, by the processor, a search space set group (SSSG) timer based on the setting of the new active DL BWP and that the SSSG timer is configured (paragraph 466, 482-483, 539: In a case that searchSpaceSwitchingTimer-r16 is configured for each DL BWP and that BWP switching is performed on the active DL BWP, the terminal apparatus 1 may reset the timer value to the initial value. Alternatively, the terminal apparatus 1 may start the timer corresponding to the active DL BWP after BWP switching). Thus it would have been obvious to the person of ordinary skill in the art at the time of the invention to implement the SSSG setup in the BWP switching as described by Ouchi in the PDCCH monitoring adaptation as described by Huawei. The motivation is to improve scheduling by the base station. For claims 2 and 8; Huawei discloses: wherein performing PDCCH monitoring based on the setting of the new active DL BWP comprises: resuming, by the processor, PDCCH monitoring according to search space sets on the new active BWP in a case that a list of search space group identities (IDs) is not configured (Section 6, Proposal 14: Proposal 14: If the active BWP is switched due to the expiration of bwplnactivityTimer before the end of the PDCCH skipping duration, the default behavior on the new active BWP, i.e., default BWP, is - UE starts monitoring PDCCH according to configured SS sets if SSSG is not configured on the new active BWP; - UE starts monitoring PDCCH according to SS set in SSSG0 if SSSG is configured on the new active BWP). For claims 3 and 9; Huawei discloses: wherein performing PDCCH monitoring based on the setting of the new active DL BWP comprises: monitoring, by the processor, PDCCH according to search space sets with group index 0 on the new active BWP of the serving cell in a case that the list of search space group IDs is configured (Section 6, Proposal 14: Proposal 14: If the active BWP is switched due to the expiration of bwplnactivityTimer before the end of the PDCCH skipping duration, the default behavior on the new active BWP, i.e., default BWP, is - UE starts monitoring PDCCH according to configured SS sets if SSSG is not configured on the new active BWP; - UE starts monitoring PDCCH according to SS set in SSSG0 if SSSG is configured on the new active BWP). For claims 5 and 11; Huawei discloses: wherein the SSSG timer comprises a search space switching timer (Section 2.3: Timer for SSSG switching). For claims 6 and 12; Huawei discloses: wherein the scheduling DCI format comprises a scheduling DCI format 0_1, 0_2, 1_1, or 1_2 (Section 3: At most 2 bit indication in self-scheduling DCIs (i.e., DCI format 1-1/0-1/1-2/0-2) can be specified for triggering the PDCCH monitoring adaptation in a single cell). For claim 13; Huawei discloses: detecting, by a processor of an apparatus, a scheduling downlink control information (DCI) format from a network node of a wireless network (Section 3, 3.1, Proposal 8: At most 2 bit indication in self-scheduling DCIs (i.e., DCI format 1-1/0-1/1-2/0-2) can be specified for triggering the PDCCH monitoring adaptation in a single cell… Proposal 8: Use 2-bits new indication field in scheduling DCI formats, as that in draft CR of TS38.212, to indicate PDCCH monitoring occasion when only single cell is configured), wherein the scheduling DCI format indicates a duration for skipping physical downlink control channel (PDCCH) monitoring (Section 2.2: The UE can be configured to be indicated by DCI a value of X slots (i.e., skipping duration) among multiple RRC configured values by scheduling DCIs indicating PDCCH schedules data… The bits for indicating PDCCH monitoring adaptation also indicating skipping duration); and resuming, by the processor, PDCCH monitoring after a timing offset in a case that a hybrid automatic repeat request (HARQ) negative acknowledgement (NACK) or an uplink (UL) data is transmitted in the duration (Section 4, 8, Proposal 17, fig. 6: Application delay for PDCCH monitoring adaptation… Proposal 17: After being indicated to skipping PDCCH monitoring, if the HARQ feedback for PDSCH is NACK, the UE still performs PDCCH monitoring for HARQ retransmission when drx-RetransmissionTimerDL is running…Figure 6 shows a timing offset equal to the RTT timer). For claim 14; Huawei discloses: wherein the PDCCH monitoring is resumed for another duration (Section 8, figure 6: Proposal 17: After being indicated to skipping PDCCH monitoring, if the HARQ feedback for PDSCH is NACK, the UE still performs PDCCH monitoring for HARQ retransmission when drx-RetransmissionTimerDL is running). For claim 16; Huawei discloses: wherein the timing offset is used to align with Downlink (DL) or UL traffic (Section 8, fig. 6: Alt1: PDCCH is monitored when the retransmission timer of any HARQ process is running. By this alternative, no retransmission is missed). For claim 17; Huawei discloses: wherein the timing offset is set to 0 (Section 4, 8, Proposal 17: Application delay for PDCCH monitoring adaptation…Option j: UE applies the skipping immediately (e.g. next symbol/slot) after the UE receives the indication in DL assignment. If the UE fails to decode the associated PDSCH and transmits a NACK, skipping is canceled in the slots after the NACK transmission). For claim 18; Huawei discloses: wherein the HARQ NACK is associated with a physical downlink shared channel (PDSCH) scheduled by the scheduling DCI format (Section 4, 8, Proposal 17: Proposal 17: After being indicated to skipping PDCCH monitoring, if the HARQ feedback for PDSCH is NACK, the UE still performs PDCCH monitoring for HARQ retransmission when drx-RetransmissionTimerDL is running). For claim 19; Huawei discloses: wherein the UL data is transmitted on a physical uplink shared channel (PUSCH) scheduled by the scheduling DCI format (Section 8: Proposal 17: the same mechanism can also be applied for uplink to ensure timely retransmission, i.e. UE can monitor PDCCH for potential UL HARQ retransmission when the uplink DRX retransmission timer is running within the skipped duration. However, there is no HARQ feedback for uplink. UE does not know when and whether there is retransmission, and will always start the UL retransmission timer after UL HARQ RTT timer. In the worst case, even the PUSCH is successfully received by gNB, UE still needs to uselessly perform PDCCH monitoring). For claim 20; Huawei discloses: wherein the scheduling DCI format comprises a scheduling DCI format 0_1, 0_2, 1_1, or 1_2 (Section 3: At most 2 bit indication in self-scheduling DCIs (i.e., DCI format 1-1/0-1/1-2/0-2) can be specified for triggering the PDCCH monitoring adaptation in a single cell). Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Hwang et al. (US 2026/0143468); Hwang discloses the PEI-O of the Cap-R UE may be determined in relation to an offset with the PEI-O of the Cap-N UE. For example, the offset may be defined as a gap between the starting position (e.g., first PDCCH monitoring occasion for PEI) of the PEI-O of the Cap-R UE and the starting position of the PEI-O of the Cap-N UE. If the value of the offset is 0, the PEI-O of the Cap-R UE may be configured to be contiguous with the PEI-O of the Cap-N UE. Any inquiry concerning this communication or earlier communications from the examiner should be directed to JOHN D BLANTON whose telephone number is (571)270-3933. The examiner can normally be reached 7am-6pm EST, Mon-Thu. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Faruk Hamza can be reached at 571-272-7969. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /JOHN D BLANTON/Primary Examiner, Art Unit 2466
Read full office action

Prosecution Timeline

Jun 26, 2024
Application Filed
Jun 05, 2026
Non-Final Rejection mailed — §103
Sep 04, 2026
Response Filed
Oct 05, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12764581
MEASUREMENT REPORTING PRIORITY FOR LOS-NLOS SIGNALS
2y 11m to grant Granted Oct 13, 2026
Patent 12764753
TRANSMISSION DETERMINATION METHOD AND DEVICE, BASE STATION, TERMINAL, AND COMPUTER-READABLE STORAGE MEDIUM
2y 4m to grant Granted Oct 13, 2026
Patent 12750884
CONFIGURED GRANTS WITHIN A TRANSMITTER COT
4y 8m to grant Granted Sep 29, 2026
Patent 12750835
METHOD AND APPARATUS FOR BANDWIDTH PART PAIRING IN A WIRELESS COMMUNICATION SYSTEM
3y 4m to grant Granted Sep 29, 2026
Patent 12750837
METHOD FOR TRANSMITTING AND RECEIVING PUSCH IN WIRELESS COMMUNICATION SYSTEM, AND APPARATUS THEREFOR
3y 2m to grant Granted Sep 29, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

2-3
Expected OA Rounds
78%
Grant Probability
86%
With Interview (+8.4%)
2y 11m (~7m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 1038 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month