Prosecution Insights
Last updated: October 02, 2026
Application No. 18/730,110

METHOD AND APPARATUS FOR NODE MOVEMENT AND CORRESPONDING NODE

Non-Final OA §103
Filed
Jul 18, 2024
Priority
Jan 19, 2022 — CN 202210059900.8 +2 more
Examiner
GEORGE, AYANAH S
Art Unit
Tech Center
Assignee
Samsung Electronics Co., Ltd.
OA Round
1 (Non-Final)
87%
Grant Probability
Favorable
1-2
OA Rounds
2m
Est. Remaining
93%
With Interview

Examiner Intelligence

Grants 87% — above average
87%
Career Allowance Rate
456 granted / 524 resolved
+27.0% vs TC avg
Moderate +6% lift
Without
With
+5.7%
Interview Lift
resolved cases with interview
Typical timeline
2y 4m
Avg Prosecution
24 currently pending
Career history
551
Total Applications
across all art units

Statute-Specific Performance

§101
3.8%
-36.2% vs TC avg
§103
61.9%
+21.9% vs TC avg
§102
20.6%
-19.4% vs TC avg
§112
8.5%
-31.5% vs TC avg
Black line = Tech Center average estimate • Based on career data from 524 resolved cases

Office Action

§103
DETAILED ACTION This action is a response to an application filed on 8/19/24 in which claims 16-35 are pending. Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Priority Receipt is acknowledged of certified copies of papers required by 37 CFR 1.55. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claim(s) 16-35 is/are rejected under 35 U.S.C. 103 as being unpatentable over Chen et al. (ID P202506733 A) (translated) and NPL: Adding of BAP Address in the IAB Transport Migration Request message, herein ZTE. As to claim 16, Chen teaches a method performed by a first integrated access and backhaul (IAB) donor node in a communication system, the method comprising: receiving, from a mobile IAB node including an IAB-mobile termination (MT) and an IAB-distributed unit (DU), a gNB-DU configuration update message (Chen page 29 lines 19-23 Based on the legacy procedure, the donor CU can be aware of the PCI through the F1 Setup procedure or the DU-gNB configuration update procedure); and as a response to receiving the gNB-DU configuration update message (Chen page 29 lines 24-30 The target donor CU can re-assign the configuration to the cell of the mobile IAB DU via the RRCReconfiguration message from the mobile MT-IAB.) wherein the gNB-DU configuration update message is received after a handover of the IAB-MT from a source IAB donor node to the target IAB donor node is performed (Chen page 29 lines 19-23 after the mobile MT-IAB HO and during the mobile IAB DU migration, The cell configuration of the mobile IAB DU can be sent by the source donor CU to the target donor CU during the HO preparation phase of the mobile IAB node) , Chen does not teach transmitting, to a target IAB donor node, an IAB transport migration management request message However ZTE does teach transmitting, to a target IAB donor node, an IAB transport migration management request message (ZTE Fig 8.5.2.2-1 IAB transport migration management request message) It would have been obvious before the effective filing date of the claimed invention to combine the teachings of Chen and ZTE, because ZTE teaches us a successful operation for IAB transport migration triggered by the F1-terminating IAB donor. As to claim 21, Chen teaches the method performed by a target integrated access and backhaul (IAB) donor node in a communication system, the method comprising: based on a gNB-DU configuration update message (Chen page 29 lines 24-30 The target donor CU can re-assign the configuration to the cell of the mobile IAB DU via the RRCReconfiguration message from the mobile MT-IAB.) wherein the gNB-DU configuration update message is transmitted from a mobile IAB node including an IAB-mobile termination (MT) and an IAB-distributed unit (DU) to the first IAB donor node (Chen page 29 lines 19-23 Based on the legacy procedure, the donor CU can be aware of the PCI through the F1 Setup procedure or the DU-gNB configuration update procedure);and wherein the gNB-DU configuration update message is transmitted after a handover of the IAB-MT from a source IAB donor node to the target IAB donor node is performed (Chen page 29 lines 19-23 after the mobile MT-IAB HO and during the mobile IAB DU migration, The cell configuration of the mobile IAB DU can be sent by the source donor CU to the target donor CU during the HO preparation phase of the mobile IAB node) , Chen does not teach receiving, from a first IAB donor node, an IAB transport migration management request message However ZTE does teach receiving, from a first IAB donor node, an IAB transport migration management request message (ZTE Fig 8.5.2.2-1 IAB transport migration management request message) It would have been obvious before the effective filing date of the claimed invention to combine the teachings of Chen and ZTE, for the same reasons stated in claim 16. As to claim 21, Chen teaches a first integrated access and backhaul (IAB) donor node in a communication system, the first IAB donor node comprising: a transceiver; and a controller coupled with the transceiver, and configured to: receive, from a mobile IAB node including an IAB-mobile termination (MT) and an IAB-distributed unit (DU), a gNB-DU configuration update message (Chen page 29 lines 19-23 Based on the legacy procedure, the donor CU can be aware of the PCI through the F1 Setup procedure or the DU-gNB configuration update procedure); and as a response to receiving the gNB-DU configuration update message (Chen page 29 lines 24-30 The target donor CU can re-assign the configuration to the cell of the mobile IAB DU via the RRCReconfiguration message from the mobile MT-IAB.) transmit, to a target IAB donor node, an IAB transport migration management request message (ZTE Fig 8.5.2.2-1 IAB transport migration management request message) wherein the gNB-DU configuration update message is received after a handover of the IAB-MT from a source IAB donor node to the target IAB donor node is performed (Chen page 29 lines 19-23 after the mobile MT-IAB HO and during the mobile IAB DU migration, The cell configuration of the mobile IAB DU can be sent by the source donor CU to the target donor CU during the HO preparation phase of the mobile IAB node) , As to claim 21, Chen teaches a target integrated access and backhaul (IAB) donor node in a communication system, the target IAB donor node comprising: a transceiver (Chen page 43 line 8 transceiver); and a controller coupled with the transceiver, and configured to (Chen page 43 line 10 processor): based on a gNB-DU configuration update message (Chen page 29 lines 24-30 The target donor CU can re-assign the configuration to the cell of the mobile IAB DU via the RRCReconfiguration message from the mobile MT-IAB.) wherein the gNB-DU configuration update message is transmitted from a mobile IAB node including an IAB-mobile termination (MT) and an IAB-distributed unit (DU) to the first IAB donor node (Chen page 29 lines 19-23 Based on the legacy procedure, the donor CU can be aware of the PCI through the F1 Setup procedure or the DU-gNB configuration update procedure); and wherein the gNB-DU configuration update message is transmitted after a handover of the IAB-MT from a source IAB donor node to the target IAB donor node is performed (Chen page 29 lines 19-23 after the mobile MT-IAB HO and during the mobile IAB DU migration, The cell configuration of the mobile IAB DU can be sent by the source donor CU to the target donor CU during the HO preparation phase of the mobile IAB node) , Chen does not teach receive, from a first IAB donor node, an IAB transport migration management request message However ZTE does teach receive, from a first IAB donor node, an IAB transport migration management request message (ZTE Fig 8.5.2.2-1 IAB transport migration management request message) It would have been obvious before the effective filing date of the claimed invention to combine the teachings of Chen and ZTE, for the same reasons stated in claim 16. As to claim 17, the combination of Chen and ZTE teaches the method of claim 16, wherein the first IAB donor node is associated with an F1-terminating IAB-donor node, and wherein the target IAB donor node is associated with a radio resource control (RRC)- terminating IAB donor node (ZTE Fig. 8.5.2.2-1) Claims 22, 27 and 32 are rejected for the same reasons stated in claim 17. As to claim 18, the combination of Chen and ZTE teaches the method of claim 16, wherein the gNB-DU configuration update message includes a gNB identifier (ID) of the target IAB donor node and address information of the mobile IAB node allocated by the target IAB donor node (Chen page 2 lines 7-23 In some embodiments, the configuration message may include at least one of: a mobile IAB indication, a CAG ID, a vehicle ID, a NID, a list of identifiers that identify one or more cells that the UE is authorized to access, or an indication that indicates whether the UE is authorized to access a nonmobile IAB cell. In some embodiments, the first wireless communication node may receive, from the UE, cell information that includes at least one of a mobile IAB indication, a CAG identifier, a vehicle identifier, the NID of the at least one cell) Claims 23, 28 and 33 are rejected for the same reasons stated in claim 19. As to claim 19, the combination of Chen and ZTE teaches the method of claim 18, wherein the IAB transport migration management request message includes at least one the address information of the mobile IAB node or traffic information, and wherein the traffic information includes at least one of identification information of traffic, quality of service (QoS) information of the traffic, type information of the traffic, or backhaul (BH) information of the traffic (ZTE page 2 traffic to be released IE) Claims 24, 29 and 34 are rejected for the same reasons stated in claim 19. As to claim 20, the combination of Chen and ZTE teaches the method of claim 19, wherein the BH information includes at least one of an egress backhaul adaptation protocol (BAP) routing identifier (ID) for a downlink (DL), an egress BH radio link control (RLC) channel (CH) ID for the DL, an ingress BAP routing ID for an uplink (UL), or an ingress BH RLC CH ID for the UL (ZTE section 1 introduction Use the BAP address as the identifier for the MT in the message) Claims 25, 30 and 35 are rejected for the same reasons stated in claim 20. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to AYANAH S GEORGE whose telephone number is (571)272-8880. The examiner can normally be reached 7:00 AM - 5:00 PM. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Hassan Phillips can be reached at 572-272-3940. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. AYANAH S. GEORGE Primary Examiner Art Unit 2467 /AYANAH S GEORGE/Primary Examiner, Art Unit 2467
Read full office action

Prosecution Timeline

Jul 18, 2024
Application Filed
Sep 03, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12732912
TERMINAL AND COMMUNICATION METHOD
3y 11m to grant Granted Sep 08, 2026
Patent 12732967
Communication Method, Apparatus, and System
3y 5m to grant Granted Sep 08, 2026
Patent 12720572
SIDELINK-RELATED EVENT NOTIFICATION FOR SIDELINK GROUP VIA SIDELINK CHANNEL
2y 9m to grant Granted Aug 25, 2026
Patent 12719533
DEVICE AND METHOD FOR PERFORMING MULTI-USER PRECODING IN WIRELESS COMMUNICATION SYSTEM
2y 3m to grant Granted Aug 25, 2026
Patent 12713473
OVERLAYED CELL ACCESS HANDLING
3y 8m to grant Granted Aug 18, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
87%
Grant Probability
93%
With Interview (+5.7%)
2y 4m (~2m remaining)
Median Time to Grant
Low
PTA Risk
Based on 524 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month