Prosecution Insights
Last updated: October 26, 2026
Application No. 18/745,341

METHOD AND SYSTEM FOR CONFLICT MANAGEMENT IN WIRELESS COMMUNICATION SYSTEM

Final Rejection §103
Filed
Jun 17, 2024
Priority
Jun 15, 2023 — IN 202341040897
Examiner
WEISSBERGER, LUNA T
Art Unit
2415
Tech Center
2400 — Computer Networks
Assignee
Samsung Electronics Co., Ltd.
OA Round
2 (Final)
75%
Grant Probability
Favorable
3-4
OA Rounds
8m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 75% — above average
75%
Career Allowance Rate
176 granted / 234 resolved
+17.2% vs TC avg
Strong +24% interview lift
Without
With
+24.1%
Interview Lift
resolved cases with interview
Typical timeline
3y 0m
Avg Prosecution
26 currently pending
Career history
278
Total Applications
across all art units

Statute-Specific Performance

§101
3.2%
-36.8% vs TC avg
§103
71.8%
+31.8% vs TC avg
§102
11.3%
-28.7% vs TC avg
§112
10.4%
-29.6% vs TC avg
Black line = Tech Center average estimate • Based on career data from 234 resolved cases

Office Action

§103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . The Examiner thanks the Applicant for the well-prepared amendment. The Examiner appreciates the Applicant’s effort to carefully analyze the Office action and make appropriate arguments and amendments. Status of Claims Claims 1-20 filed on August 14, 2026 are pending, claims 1, 6, 11 and 16 are amended, and claims 2-3, 7-8, 12-13 and 17-18 are canceled. Information Disclosure Statement The information disclosure statement (IDS) submitted on September 14, 2026 is in compliance with the provisions of 37 CFR 1.97. Accordingly, the information disclosure statements are being considered by the examiner and an initialed and dated copy of the Applicant’s IDS form 1449 is attached to the instant Office Action. Response to Arguments Applicant’s arguments with respect to claim(s) 1 have been considered but are moot because the new ground of rejection does not rely on any reference applied in the prior rejection of record for any teaching or matter specifically challenged in the argument. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claims 1, 4-6, 9-11, 14-16 and 19-20 is/are rejected under 35 U.S.C. 103 as being unpatentable over 3GPP et al. (3GPP TR 28.912 V1.3.1, hereinafter "3GPP") in view of Mwanje et al.(US 2026/0154615 A1, hereinafter "Mwanje"). Regarding claim 1, 3GPP discloses a method performed by a mobile network service (MnS) producer entity in a wireless communication system, the method comprising: receiving, from an MnS consumer entity, a first message to request a subscription to receive a managed object instance (MOI) related notification (3GPP, 4.5.3.1 The MnS consumer can use the "getMOIAttributeValue" operation to query the IntentReport <<IOC>> to obtain the intent report information and/or subscribe the "notifyMOIAttributeValueChanges"notification to obtain the intent report information The IntentReport); identifying a conflict on an intent (3GPP, 4.2.3 When the MnS producer detects a conflict on an intent); and transmitting, to the MnS consumer entity, a second message indicating a notification of the conflict on the intent (3GPP, 4.2.3 The MnS producer should notify the MnS consumer whenever such a conflict is detected with intent; 4.5.3 Different MnS consumers can subscribe to attribute value change notifications for IntentReport), and a third request message to modify the conflict on the intent based on the second message (3GPP 4.2.3 asks the MnS consumer to either approve or reject the alternative targets) but does not explicitly receiving, from the MnS consumer entity, a third request message to modify the conflict on the intent based on the second message. Mwanje from the same field of endeavor discloses receiving, from the MnS consumer entity, a third request message to modify the conflict on the intent based on the second message (Mwanje, [0134, 0140] the second device 120 may also provide the reason in the training request. For example, the training request may include a reason indication of “mapping update,” “too many conflicts”; the first device 110 (i.e. MnS consumer entity) may transmit (528) an activation request (i.e. third request message) to the second device 120 to activate the retrained ML entity 130). It would have been obvious for one with ordinary skill in the art before the effective filing date of the claimed invention to have modified intent conflicts disclosed by 3GPP and activation request disclosed by Mwanje with a motivation to make this modification in order to reconfigure the solution, and to change the solutions input (Mwanje, [0003]). Regarding claim 4, 3GPP discloses wherein the second message further includes attribute information on the intent, the attribute information including information on at least one of a conflict type, a conflicting intent, a conflicting expectation, or a conflicting target (3GPP, 4.5.1 Intent conflict information, which represents conflict type (i.e., intent conflict, expectation conflict and target conflict) and possible solution recommendation to address the conflicts). Regarding claim 5, 3GPP discloses wherein the attribute information further includes information indicating that the intent is to be deleted (3GPP, 4.2.3 Extend the Intent <<IOC>> with the following attribute: Terminate or suspend the existing intent and send notification to the MnS consumer). Regarding claim 6, 3GPP discloses a method performed by a mobile network service (MnS) consumer entity in a wireless communication system, the method comprising: transmitting, to an MnS producer entity, a first message to request a subscription to receive a managed object instance (MOI) related notification (3GPP, 4.5.3.1 The MnS consumer can use the "getMOIAttributeValue" operation to query the IntentReport <<IOC>> to obtain the intent report information and/or subscribe the "notifyMOIAttributeValueChanges"notification to obtain the intent report information The IntentReport); and receiving, from the MnS producer entity, a second message indicating a notification of a conflict on an intent report (3GPP, 4.2.3 The MnS producer should notify the MnS consumer whenever such a conflict is detected with intent; 4.5.3 Different MnS consumers can subscribe to attribute value change notifications for IntentReport) , and a third request message to modify the conflict on the intent based on the second message (3GPP 4.2.3 asks the MnS consumer to either approve or reject the alternative targets) but does not explicitly transmitting, from the MnS consumer entity, a third request message to modify the conflict on the intent based on the second message. Mwanje from the same field of endeavor discloses transmitting, from the MnS consumer entity, a third request message to modify the conflict on the intent based on the second message (Mwanje, [0134, 0140] the second device 120 may also provide the reason in the training request. For example, the training request may include a reason indication of “mapping update,” “too many conflicts”; the first device 110 (i.e. MnS consumer entity) may transmit (528) an activation request (i.e. third request message) to the second device 120 to activate the retrained ML entity 130). It would have been obvious for one with ordinary skill in the art before the effective filing date of the claimed invention to have modified intent conflicts disclosed by 3GPP and activation request disclosed by Mwanje with a motivation to make this modification in order to reconfigure the solution, and to change the solutions input (Mwanje, [0003]). Regarding claim 9, 3GPP discloses wherein the second message further includes attribute information on the intent, the attribute information including information on at least one of a conflict type, a conflicting intent, a conflicting expectation, or a conflicting target (3GPP, 4.5.1 Intent conflict information, which represents conflict type (i.e., intent conflict, expectation conflict and target conflict) and possible solution recommendation to address the conflicts). Regarding claim 10, 3GPP discloses wherein the attribute information further includes information indicating that the intent is to be deleted (3GPP, 4.2.3 Extend the Intent <<IOC>> with the following attribute: Terminate or suspend the existing intent and send notification to the MnS consumer). Regarding claims 11, 14-16 and 19-20, these claims recite "a mobile network service (MnS) producer entity in a wireless communication system" and "a mobile network service (MnS) consumer entity in a wireless communication system" that disclose similar steps as recited by the method of claims 1, 4-6 and 9-10, thus are rejected with the same rationale applied against claims 1, 4-6 and 9-10 as presented above. Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to LUNA WEISSBERGER whose telephone number is (571)272-3315. The examiner can normally be reached Monday-Friday 8:00am-5:30pm. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Jeffrey Rutkowski can be reached at (571)270-1215. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /LUNA WEISSBERGER/Examiner, Art Unit 2415
Read full office action

Prosecution Timeline

Jun 17, 2024
Application Filed
May 14, 2026
Non-Final Rejection mailed — §103
Aug 14, 2026
Response Filed
Oct 01, 2026
Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12771507
PUSCH INDICATION METHOD AND APPARATUS, AND PUSCH SENDING METHOD AND APPARATUS
3y 6m to grant Granted Oct 20, 2026
Patent 12771515
METHOD FOR TRANSMITTING PHYSICAL LAYER PROTOCOL DATA UNIT AND COMMUNICATION APPARATUS
3y 1m to grant Granted Oct 20, 2026
Patent 12750707
MIXED DOWNLINK REFERENCE SIGNAL AND FEEDBACK INFORMATION REPORTING
4y 0m to grant Granted Sep 29, 2026
Patent 12744633
ATSC BROADCAST SIGNAL WITH ENCODED DISPATCH MESSAGES
2y 8m to grant Granted Sep 22, 2026
Patent 12739090
NETWORKING METHOD AND APPARATUS THEREFOR
2y 9m to grant Granted Sep 15, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
75%
Grant Probability
99%
With Interview (+24.1%)
3y 0m (~8m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 234 resolved cases by this examiner. Grant probability derived from career allowance rate.