Prosecution Insights
Last updated: November 20, 2026
Application No. 18/746,223

WORKLOAD DEPLOYMENTS USING INFRASTRUCTURE GROUPS

Non-Final OA §103§112
Filed
Jun 18, 2024
Priority
Mar 28, 2024 — IN 202441025188
Examiner
PANYASITHAVONG, NICOLAS JAY
Art Unit
2195
Tech Center
2100 — Computer Architecture & Software
Assignee
Hewlett Packard Enterprise Development L.P.
OA Round
1 (Non-Final)
Grant Probability
Favorable
1-2
OA Rounds

Examiner Intelligence

Grants only 0% of cases
0%
Career Allowance Rate
0 granted / 0 resolved
-55.0% vs TC avg
Minimal +0% lift
Without
With
+0.0%
Interview Lift
resolved cases with interview
Typical timeline
Avg Prosecution
3 currently pending
Career history
4
Total Applications
across all art units
This examiner has no resolved cases yet (career too new); statute-level performance unavailable. The Grant Probability card shows Tech Center averages instead.

Office Action

§103 §112
DETAILED ACTION Claims 1-20 are pending in the application. Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. Priority Receipt is acknowledged of certified copies of papers required by 37 CFR 1.55. Examiner’s Notes The Examiner cites particular sections in the references as applied to the claims below for the convenience of the applicant(s). Although the specific citations are representative of the teachings in the art and are applied to the specific limitations within the individual claim, other passages and figures may apply as well. It is respectfully requested that, in preparing responses, the applicant(s) fully consider the references in their entirety as potentially teaching all or part of the claimed invention, as well as the context of the passage as taught by the prior art or disclosed by the Examiner. Claim Objections Claims 4, 11, and 18 are objected to because of the following informalities: Claims 4, 11, and 18: “the update infrastructure group template” appears to be a typological error. Instead, the claims should be —the updated infrastructure group template—. Appropriate correction is required. Claim Rejections - 35 USC § 112 The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. Claims 1-20 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. Claims 1, 8, and 15 recite wherein the infrastructure agent initiates a deployment of the infrastructure group at the infrastructure site based on the infrastructure group template when the deploy step was previously recited to be associated with the updated infrastructure group template. Therefore, it is indefinite on which template the claim scope requires. For the purpose of examination, the claim will be interpreted as the deployment being based on the updated infrastructure group template. Similarly, claims 2, 9, and 16, dependent on 1, 8, and 15, respectively, recite performing a validation of the infrastructure group template before providing the instruction to deploy when the deploy step was previously recited to be associated with the updated infrastructure group template in their respective parent claims. Therefore, it is indefinite on which template the claim scope requires. For the purpose of examination, the claim will be interpreted as the validation being performed on the updated infrastructure group template. Dependent claims are rejected for inheriting and not curing the indefiniteness of their parent claim. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claims 1-20 are rejected under 35 U.S.C. 103 as being unpatentable over Howley et al. (US 2023/0259390 A1; hereinafter Howley) in view of Mangtani et al. (US 2013/0232498 A1; hereinafter Mangtani). With respect to claim 1, Howley teaches a system, comprising: one or more processors; and one or more non-transitory computer readable media storing instructions which, when executed by the one or more processors, cause the one or more processors to (Howley, paragraph 61, “computer system 500 includes processing resource 510 coupled to non-transitory, machine readable medium 520 encoded with instructions to perform one or more processes described herein”; paragraph 62, “Processing resource 510 may include a microcontroller, a microprocessor, CPU core(s), GPU core(s), an ASIC, an FPGA, and/or other hardware device suitable for retrieval and/or execution of instructions from machine readable medium 520 to perform the functions related to various examples described herein”): receive a template request, at an infrastructure orchestrator, for a workload environment in an infrastructure as a service (IaaS) environment (Howley, paragraph 31, “the set of available templates may be queried via the API. For example, the API may provide a method for listing the available templates (e.g., service template 141) applicable to the cloud services offered by the cloud platform”; paragraph 20, “the infrastructure may be delivered to the user or user's organization (e.g., installed at a data center or colocation of the user or the user's organization) by the cloud platform vendor or by an infrastructure provider for consumption as-a-service in a pay-per-use financial model”); obtain, by the infrastructure orchestrator, an infrastructure group template corresponding to the workload environment specified in the template request (Howley, paragraph 22, “each template associated with a particular cloud service defines a workload to be deployed against the particular cloud service using the particular IaC tool”; paragraph 31, “Each template may be accompanied by a parameters file that defines one or more input parameters that can be set by the end-user in order to realize an instance of a particular template”); provide, by the infrastructure orchestrator and to a user device, the infrastructure group template (Howley, paragraph 32, “the end-user may select a template from the list of available templates to create a deployment based on the selected template”); receive, at the infrastructure orchestrator, an infrastructure group configuration request comprising the [updated] infrastructure group template (Howley, paragraph 49, “the end-user making an API request (at 401) to create a deployment based on the TF #1 template (one of a number of available service templates 441, which may each provide for deploying different workloads), supplying the parameter values for that template”; paragraph 50, “The end-user may then make an API request (at 402) to apply the previously created deployment, which results in the IaC service 430 persisting an apply operations (Ops) request in the IaC database 440”); provide, from the infrastructure orchestrator and to an infrastructure agent executing at an infrastructure site, an instruction to deploy an infrastructure group corresponding to the [updated] infrastructure group template (Howley, paragraph 38, “the IaC agent (e.g., IaC agent 150b) may alternatively be hosted in an on-premise environment (e.g., on-premise 160) where it interacts with the hosted IaC service to retrieve deployment requests (directed to that on-premise site) and updates in-progress deployments”; paragraph 26, “the IaC service 130 may publish notifications of new requests to a predefined queue or topic and some part of the agent process may be configured to wait for notifications on that queue or topic” where the notification sent from IaC service to the IaC agent denotes providing an instruction to from the orchestrator to the agent, see also paragraph 51, “An on-premise IaC agent (e.g., IaC agent 450) may periodically poll (at 403) for Ops requests for this site/location or an event-driven mechanism may inform the IaC agent of the present of a new Ops request (a deployment request)”), wherein the infrastructure agent initiates a deployment of the infrastructure group at the infrastructure site based on the [updated] infrastructure group template (Howley, paragraph 36, “the IaC agent may retrieve the template code associated with the deployment request from the source repository (e.g., repository 121a) and may cause the relevant mutator component (e.g., mutator 151a) to spawn a new container to execute the corresponding IaC tool with the template and input deployment parameters supplied by the end-user”; paragraph 54, “The container runs Terraform, for example, based on a cloud platform Terraform provider (e.g., cloud platform IaC tool provider 360) at 406, which results in CaaS API calls to provision a CaaS tenant cluster”); and provide, by the infrastructure agent and to the user device, a status response corresponding to the deployment of the infrastructure group, wherein the status response indicates whether the deployment was a success or a failure (Howley, paragraph 27, “the IaC agents 150a-b are shown including mutators 151a-b. The mutators 151a-b may be responsible for managing the launching and orchestration of a particular IaC tool (e.g., Terraform, Pulumi, Ansible, Chef, or Puppet), parsing of that tool's output to determine the outcome or status, and persisting the state of the deployment (e.g., to the IaC database 140) to facilitate future updates via the API 131 and/or to allow the end-user to determine when the deployment has completed”; paragraph 55, “The IaC Agent sets the status of deployment (at 407) via calls back to the hosted IaC service 430 (e.g., via the API)”; paragraph 56, “The end-user makes API calls (at 408) to retrieve the current status of the deployment (e.g., to view the progress of the requested CaaS workload)”). While Howley teaches that an end-user supplies parameters to the selected template, Howley does not explicitly teach wherein the user device updates the infrastructure group template to obtain an updated infrastructure group template. However, Mangtani, in the same field of deploying workloads in cloud environment using templates, teaches this limitation (Mangtani, paragraph 47, “In step 332, the user customizes one or more nodes and application components of blueprint 126 by editing details (e.g., labels, descriptions), properties, and actions of the nodes and applications components. The customizations made by the user to the nodes and application components represent application-specific configurations that override or replace default configurations provided by catalog 130”; paragraph 59, “a user may override node properties, such as memory allocation or number of CPUs, which have been defined by catalog 130 to make a more robust deployment”). It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have the user device to update the template/blueprint in order to receive an updated template, as taught by Mangtani, to the provided template of Howley. The motivation to do so would be to allow users to use a single template to serve different deployment plans (Mangtani, paragraph 23). With respect to claim 2, Howley as modified teaches the system of claim 1, and further teaches wherein the execution of the instructions further causes the one or more processors to: perform a validation of the updated infrastructure group template before providing the instruction to deploy the infrastructure group to the infrastructure agent (Mangtani, paragraph 54, “In step 340, application director 106 checks the application topology defined by blueprint 126 for errors. For example, application director 106 may verify whether properties have been correctly specified, that application components are not missing from any required actions, or that invalid or circular dependencies have not been created”). With respect to claim 3, Howley as modified teaches the system of claim 2, and further teaches wherein when the validation is a validation failure, an indication of the validation failure is provided to the user device that comprises a reason for the failure of the validation (Mangtani, paragraph 54, “in step 344, responsive to detecting an error within blueprint 126, application director 106 transmits an error message to the user. Application director 106 may provide the user with opportunities to perform one or more remedial actions to correct any detected errors”). With respect to claim 4, Howley as modified teaches the system of claim 1, and further teaches wherein the infrastructure site is specified in the updated infrastructure group template (Howley, paragraph 33, “Non-limiting examples of input parameters for a VMaaS workload may include the name and location of the virtual machine (VM), the server or cluster of server resources that will run the VM, resource pool, datastore (the location of files associated with the VM), the hardware machine version, guest operating system (OS), the number of virtual processors (e.g., CPUs) in the VM, the type of SCSI adapter to use with the VM, and the disk to use with the VM”). With respect to claim 5, Howley as modified teaches the system of claim 1, and further teaches wherein the infrastructure agent initiates the deployment of the infrastructure group using infrastructure resources of the infrastructure site (Howley, paragraph 38, “his manifestation of the IaC agent may be pertinent to use cases in which the mutator (e.g., one of mutators 151a-b) makes use of access to a local network (e.g., an Ansible playbook that accesses hosts on a private network via the secure shell protocol (SSH))”). With respect to claim 6, Howley as modified teaches the system of claim 1, and further teaches wherein the template request specifies a virtualization environment for deploying a plurality of virtual machines, a container environment for deploying a plurality of containers, or a plurality of nodes for implementing a high performance computing (HPC) cluster (Howley, paragraph 47, “For purposes of the following use case, it is assumed a service team user (not shown) that is a member of a VMaaS team that is familiar with a particular IaC standard (e.g., Terraform (an IaC standard) and has written some sample Terraform configurations to create workloads on a VMaaS service instance” where alternatively another use case involves CaaS for deployment of container see paragraph 36). With respect to claim 7, Howley as modified teaches the system of claim 1, and further teaches wherein the infrastructure group template comprises configuration details for compute resources, storage resources, and network resources (Howley, paragraph 33, “Non-limiting examples of input parameters for a BMaaS workload may include server name, flavor (e.g., CPU, memory, internal disk, RAID controller, power source, NIC), the OS image, the SSH key pair, the IP address for the bare metal server, disk partitioning, RAID level, metadata, and boot mode, and remote console access, and personality (e.g., configuration files)” where CPU and memory are computer details; internal disk, RAID controller, disk partitioning, RAID level are storage details; and NIC and IP address are network details). Claims 8-14 recite a method precisely performed by the system of claims 1-7, respectively. Therefore, claims 8-14 are rejected for reasons set forth in claims 1-7, respectively. Similarly, claims 15-20 recite a non-transitory computer-readable medium storing programming for execution by one or more processors, the programming comprising instructions to perform the same operations performed by the system of claims 1-7, respectively. As Howley has shown to teach the operations implemented on such limitations (Howley, paragraph 6, “computer system 500 includes processing resource 510 coupled to non-transitory, machine readable medium 520 encoded with instructions to perform one or more processes described herein”), claims 15-20 are rejected for reasons set forth in claims 1-7, respectively. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to NICOLAS JAY PANYASITHAVONG whose telephone number is (571)270-7487. The examiner can normally be reached Monday - Thursday (7:30 AM - 5:00 PM ET). Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Aimee Li can be reached at (571) 272-4169. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /N.J.P./Examiner, Art Unit 2195 /Aimee Li/Supervisory Patent Examiner, Art Unit 2195
Read full office action

Prosecution Timeline

Jun 18, 2024
Application Filed
Oct 28, 2026
Non-Final Rejection mailed — §103, §112 (current)

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
Grant Probability
Low
PTA Risk
Based on 0 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month