Prosecution Insights
Last updated: October 02, 2026
Application No. 18/766,296

MEDIUM ACCESS CONTROL SCHEDULERS FOR WIRELESS COMMUNICATION

Non-Final OA §102§103§112§DOUBLEPATENT
Filed
Jul 08, 2024
Priority
Apr 25, 2011 — provisional 61/478,604 +3 more
Examiner
MILLS, DONALD L
Art Unit
Tech Center
Assignee
Texas Instruments Incorporated
OA Round
1 (Non-Final)
85%
Grant Probability
Favorable
1-2
OA Rounds
7m
Est. Remaining
96%
With Interview

Examiner Intelligence

Grants 85% — above average
85%
Career Allowance Rate
810 granted / 958 resolved
+24.6% vs TC avg
Moderate +11% lift
Without
With
+10.9%
Interview Lift
resolved cases with interview
Typical timeline
2y 10m
Avg Prosecution
14 currently pending
Career history
976
Total Applications
across all art units

Statute-Specific Performance

§101
10.6%
-29.4% vs TC avg
§103
36.9%
-3.1% vs TC avg
§102
27.5%
-12.5% vs TC avg
§112
13.2%
-26.8% vs TC avg
Black line = Tech Center average estimate • Based on career data from 958 resolved cases

Office Action

§102 §103 §112 §DOUBLEPATENT
CTNF 18/766,296 CTNF 79873 Notice of Pre-AIA or AIA Status 07-03-fti AIA The present application is being examined under the pre-AIA first to invent provisions. DETAILED ACTION Claim Objections 07-29-01 AIA Claim 31 is objected to because of the following informalities: Regarding claim 31, line 1, the claim recites wireless communication comprising . . . which should be corrected to – wireless communication system comprising –. Appropriate correction is required. Claim Rejections - 35 USC § 112 07-30-02 AIA The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. 07-34-01 AIA Claim s 6, 8, 9, 11, 21, 23, 24, 26, and 31-45 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor, or for pre-AIA the applicant regards as the invention. Regarding claims 6, 21, and 36, for example see claim 6, the claims recite interval n + K ; however, neither the dependent claim nor the parent claim specifies the value of “K” (see line 6). Therefore, the term “K” lacks proper antecedent basis and the value of K is unclear from the context of the claim. Appropriate clarification and correction is required. Regarding claims 8, 9, 23, 24, 38, and 39, for example see claim 8, the claims recite computing MMSE (b) (see line 5); however, the value to which "(b)" refers is unclear from the context of the claim. Further, it is unclear what value is being utilized to calculate the minimum mean square error as the claim does not define the value of "b". Appropriate clarification and correction is required. Regarding claims 11, 26, and 41, the claim recites N best-UL UEs among N Pre per subband to produce two UE by SB tables, where the first table provides the IDS . . . an initial SB . . . a PDCCH . . . . See lines 2-4, 12, and 17, respectively. The claim does not define the terms/acronyms N best-UL UEs, N pre per subband, SB, and PDCCH. Appropriate clarification and correction is required. Regarding claim 31, line 2, the claim recites said at least one user equipment. The claim term “said at least one user equipment” lacks proper antecedent basis. Appropriate clarification and correction is required. Claim Rejections - 35 USC § 102 07-07-fti The following is a quotation of the appropriate paragraphs of pre-AIA 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – 07-12-fti 07-12 (e) the invention was described in (1) an application for patent, published under section 122(b), by another filed in the United States before the invention by the applicant for patent or (2) a patent granted on an application for patent by another filed in the United States before the invention by the applicant for patent, except that an international application filed under the treaty defined in section 351(a) shall have the effects for purposes of this subsection of an application filed in the United States only if the international application designated the United States and was published under Article 21(2) of such treaty in the English language. 07-15-03-fti Claim s 1, 2, 5, 16, 17, 20, 23-29, 31, 32, 35, 38-41, 45 and 46 are rejected under pre-AIA 35 U.S.C. 102(e) as being anticipated by Hanaki et al. (US 2011/0207467 A1), hereinafter referred to as Hanaki . Regarding claims 1, 16, 31, and 46, Hanaki discloses a base station, upper node, radio communication system and radio communication method, which comprises: each user equipment periodically measuring channel quality of communication with the base station; each user equipment periodically transmitting a channel quality indicator to the base station corresponding to a measured channel quality; the base station scheduling communication with the at least one user equipment based upon the periodically transmitted channel quality indicators of the at least one user equipment (Referring to Figures 1 and 2, the base station 100 performs allocation of radio resource and the like (base station scheduling communication with the at least one UE based upon the periodically transmitted channel quality indicators of the least one UE), the radio terminal 10 transmits uplink control data (each UE periodically transmitting a channel quality indicator to the base station corresponding to a measured channel quality) to the base station 100a through an enhanced dedicated physical control channel (E-DPCCH) or an E-DPDCH. Uplink control data includes scheduling information (UL scheduling information) which the base station 100a references in allocating radio resource. Scheduling information includes an "HLID (highest priority logical channel ID)," a "TEBS (total E-DCH buffer status)," an "HLBS (highest priority logical channel buffer status)," a "UPH (user power headroom)" and the like. Examples of uplink control data other than the scheduling information include a "happy bit," a " CQI" and the like (refer to 3GPP TS25. 321 Ver. 7.5.0 9.2.5.3 "UL Scheduling Information"). An "HLID" is an identifier for identifying a logical channel having the highest priority among logical channels transmitting uplink data. A "TEBS" is information indicating the amount of uplink data (buffer amount) stored in a transmission buffer provided to the radio terminal 10. An "HLBS" is the amount of uplink data (buffer amount) corresponding to the logical channel identified by the HLID, among the uplink data stored in the transmission buffer provided to the radio terminal 10. A "UPH" is a transmission power ratio which is a ratio of a transmission power of a DPCCH to the maximum transmission power (maximum UE transmission power). The maximum transmission power is the maximum allowable transmission power of the radio terminal 10. For example, a UPH is expressed as "maximum transmission power"/"transmission power of DPCCH." A "happy bit" is information indicating the degree of happiness, which shows whether or not an SG allocated to the radio terminal 10 is sufficient. There are two types of "happy bits" including "happy" which indicates that the SG allocated to the terminal is sufficient and "unhappy" which indicates that the SG allocated to the terminal is insufficient. Note that a "happy bit" is indicated by a single bit. A "CQI" is a reception quality value indicating a reception quality of a downlink signal (such as a CPICH; common pilot channel) that the radio terminal 10 receives from the base station 100 (each UE periodically measuring channel quality of communication with the base station, as CQI is perform periodically per the standard). See paragraphs 0037-0044.) Regarding claims 2, 17, and 32, Hanaki discloses said step of scheduling communication schedules uplink transmissions from a user equipment to the base station wherein the base station receives a channel quality indicator of each physical resource block, computes a scheduling metric for each receiver type, and limits the size of uplink allocation based upon reported headroom and buffer size (Referring to Figures 1 and 2, the base station 100 performs allocation of radio resource and the like (equivalent to a scheduling metric as the base station is responsible for scheduling/allocation), the radio terminal 10 transmits uplink control data to the base station 100a through an enhanced dedicated physical control channel (E-DPCCH) or an E-DPDCH. Uplink control data includes scheduling information (UL scheduling information) which the base station 100a references in allocating radio resource. Scheduling information includes an "HLID (highest priority logical channel ID)," a "TEBS (total E-DCH buffer status)," an "HLBS (highest priority logical channel buffer status)," a "UPH (user power headroom)" and the like. Examples of uplink control data other than the scheduling information include a "happy bit," a " CQI" (corresponding to each PRB) and the like (refer to 3GPP TS25. 321 Ver. 7.5.0 9.2.5.3 "UL Scheduling Information"). See paragraphs 0032 and 0037-0044. The radio terminal 10 has a table related to uplink data transmitted through an E-DPDCH, the table associating transmission power ratios and transmission rates (thus, limiting size of uplink allocation based on reported headroom and buffer size). A transmission power ratio is a ratio between a transmission power of an E-DPDCH and a transmission power of a DPCCH (E-DPDCH/DPCCH). A transmission rate is indicated by a TBS (transport block size).) See paragraph 0034.) Regarding claims 5, 20, and 35, Hanaki discloses said step of scheduling communication employs a minimum scheduling unit of an integer N of Physical Resource Blocks (Referring to Figures 1 and 2, the radio terminal 10 has a table related to uplink data transmitted through an E-DPDCH, the table associating transmission power ratios and transmission rates. A transmission power ratio is a ratio between a transmission power of an E-DPDCH and a transmission power of a DPCCH (E-DPDCH/DPCCH). A transmission rate is indicated by a TBS (transport block size), thus limiting to integer values for corresponding PRBs. See paragraph 0034.) Regarding claims 23-29, 38-41, and 45, Hanaki discloses said base station is further operable to pre-schedule by . . . (Note, the Examiner interprets the claim term “operable” as a system capable of being programmed to accomplish the claimed limitations. Hanaki teaches a programmable base station which is also capable of being programmed to perform the same recited claim limitations. Further, the claim does not recite an actual positive recitation but merely that the base station is “operable to” and the prior art also teaches a base station “operable to”. Referring to Figures 1 and 2) Claim Rejections - 35 USC § 103 07-20-fti The following is a quotation of pre-AIA 35 U.S.C. 103(a) which forms the basis for all obviousness rejections set forth in this Office action: (a) A patent may not be obtained though the invention is not identically disclosed or described as set forth in section 102 of this title, if the differences between the subject matter sought to be patented and the prior art are such that the subject matter as a whole would have been obvious at the time the invention was made to a person having ordinary skill in the art to which said subject matter pertains. Patentability shall not be negatived by the manner in which the invention was made. 07-21-fti Claim 3, 4, 6, 7, 18, 19, 21, 22, 33, 34, 36, 37, and 47 are rejected under pre-AIA 35 U.S.C. 103(a) as being unpatentable over Hanaki et al. (US 2011/0207467 A1), hereinafter referred to as Hanaki, in view of Ishii et al. (US 2010/0113082 A1), hereinafter referred to as Ishii . Regarding claims 3, 18, 33, and 47, Hanaki does not disclose each user equipment signaling the base station a scheduling recommendation regarding Modulation and Coding Scheme and Multiple Input, Multiple Output configuration; and the method wherein said step of scheduling communication schedules downlink transmissions from the base station to a user equipment in response to the recommendations. Ishii teaches that it is well-known in the art within the LTE system, so-called Adaptive Modulation and Coding (AMC) is applied, thereby signaling MCS and MIMO configuration and corresponding scheduling according to the adaptation; therefore, transmission formats of the shared channels may vary among different sub-frames. Herein, the transmission format includes various information items indicating such as allocation information of the resource blocks which are frequency resources, modulation scheme, payload size, HARQ (Hybrid Automatic Repeat reQuest) information such as a Redundancy version parameter, a process number and the like, the number of streams, and a Pre-coding vector, and information items of an MIMO and the like. See paragraphs 0006, 0082, and 0083. It would have been obvious to one of ordinary skill in the art at the time of the invention to modify the system of Hanaki to comply with the well-known standard of LTE of Ishii. One of ordinary skill in the art at the time of the invention would have been motivated to do so to comply with the well-known standard of LTE. In so doing, unexpected results are not achieved. Regarding claims 4, 19, and 34, Hanaki does not disclose transmitting a schedule from the base station to a user equipment via a Physical Downlink Control Channel; said step of scheduling communication with a user equipment wherein the base station adapts Physical Downlink Control Channel parameters and searches user equipment specific and common search spaces to allocate Control Channel Elements for Downlink Control Information messages. Ishii teaches in downlink communications, a Physical Downlink Shared Channel (PDSCH) that is shared among the user equipment terminals 100.sub.n and a Physical Downlink Control Channel (PDCCH) are used. In downlink, user information and transport format information of a Downlink Shared Channel, the user information and the transport information of an Uplink Shared Channel, acknowledgement information of the Uplink Shared Channel and the like are reported via the Physical Downlink Control Channel (PDCCH). User data are transmitted via the Physical Downlink Shared Channel (PDSCH). The user data are transmitted via a Downlink Shared Channel (DL-SCH) as a transport channel. See paragraphs 0081 and 0082. It would have been obvious to one of ordinary skill in the art at the time of the invention to modify the system of Hanaki to comply with the well-known standard of LTE of Ishii. One of ordinary skill in the art at the time of the invention would have been motivated to do so to comply with the well-known standard of LTE. In so doing, unexpected results are not achieved. Regarding claims 6, 21, and 36, Hanaki does not disclose said step of scheduling communication estimates for a given channel quality information available at transmission interval n and on frequency chunk b which modulation and coding scheme (MCS) out of a fixed MCS set must be assigned to a user transmitting at transmission interval n+K. Ishii teaches that it is well-known in the art within the LTE system, so-called Adaptive Modulation and Coding (AMC), assigning a MCS to a UE in an interval, is applied; therefore, transmission formats of the shared channels may vary among different sub-frames. Herein, the transmission format includes various information items indicating such as allocation information of the resource blocks which are frequency resources, modulation scheme, payload size, HARQ (Hybrid Automatic Repeat reQuest) information such as a Redundancy version parameter, a process number and the like, the number of streams, and a Pre-coding vector. See paragraphs 0006, 0082, and 0083. It would have been obvious to one of ordinary skill in the art at the time of the invention to modify the system of Hanaki to comply with the well-known standard of LTE of Ishii. One of ordinary skill in the art at the time of the invention would have been motivated to do so to comply with the well-known standard of LTE. In so doing, unexpected results are not achieved. Regarding claims 7, 22, and 37, Hanaki does not disclose said step of scheduling communication for each allocation employs a Physical Downlink Control Channel mapping function including computing a cost function for each Control Channel Element by recited equation. Ishii teaches that it is well-known in the art within the LTE system, so-called Adaptive Modulation and Coding (AMC) is applied; therefore, transmission formats of the shared channels may vary among different sub-frames. Herein, the transmission format includes various information items indicating such as allocation information of the resource blocks which are frequency resources, modulation scheme, payload size, HARQ (Hybrid Automatic Repeat reQuest) information such as a Redundancy version parameter, a process number and the like, the number of streams, and a Pre-coding vector. See paragraphs 0006, 0082, and 0083. Further, a logical channel having the Highest priority is selected from among the logical channels having transmittable data based on the selection logics described below and the process goes to step S320 in which a Scheduling Coefficient Calculation process is performed. When the logical channel having the Highest priority is selected, the logical channel in which Persistent Resource is reserved in step S338 is also treated as a target of the selection. See paragraphs 0121-0124. Note, the Examiner equates Ishii’s calculation as equivalent to the claimed function. It would have been obvious to one of ordinary skill in the art at the time of the invention to modify the system of Hanaki to comply with the well-known standard of LTE of Ishii. One of ordinary skill in the art at the time of the invention would have been motivated to do so to comply with the well-known standard of LTE. In so doing, unexpected results are not achieved . 07-21-fti Claim s 10, 25, and 40 are rejected under pre-AIA 35 U.S.C. 103(a) as being unpatentable over Hanaki et al. (US 2011/0207467 A1), hereinafter referred to as Hanaki, in view of Ishii et al. (US 2010/0113082 A1), hereinafter referred to as Ishii, in further view of Liu et al., “Improved Recursive Maximum Expansion Scheduling Algorithms for Uplink Single Carrier FDMA Operation," 2010 IEEE 71st Vehicular Technology Conference, May 2010, pp. 1-5, hereinafter referred to as Liu . Regarding claims 10, 25, and 40, Hanaki does not disclose said step of scheduling communication includes a 2-step recursive maximum expansion calculation including initial subband allocation and expansion, and subband gap filling. Liu teaches improved recursive maximum expansion scheduling algorithms for uplink single carrier FDMA systems. Single-carrier frequency division multiple access (SCFDMA) has been selected as the uplink access scheme in the UTRA Long Term Evolution (LTE) due to its low peak-to-average power ratio properties. Nevertheless, in order to achieve such a benefit, it requires a localized allocation of the resource blocks (RBs), which naturally imposes a severe constraint on the scheduler design. In this paper, two improved recursive maximum expansion scheduling algorithms for SC-FDMA are proposed. Compared with conventional recursive maximum expansion (RME) scheme in which UE can only expand the resource allocation on neighboring RBs with the highest metrics, in proposed improved recursive maximum expansion (IRME) scheme, higher degree of freedom in RB expansion is achieved by allowing RB expansion within certain ranking threshold. Moreover, to further increase the flexibility in resource allocation, multiple surviving paths are introduced in proposed improved tree-based recursive maximum expansion (ITRME) scheme. The simulation results show that, compared with conventional RME scheme, the proposed IRME scheme can exhibit the gain about 15% in terms of spectral efficiency with a linear increase of computational complexity, and the performance can be further improved to 18% with proposed ITRME scheme if further higher complexity is permitted. See abstract. It would have been obvious to one of ordinary skill in the art at the time of the invention to implement the well-known technique of recursive maximum expansion as taught by Liu in the system of Hanaki. One of ordinary skill in the art at the time of the invention would have been motivated to do so to improve scheduling and increase spectral efficiency . Double Patenting 08-33 AIA The nonstatutory double patenting rejection is based on a judicially created doctrine grounded in public policy (a policy reflected in the statute) so as to prevent the unjustified or improper timewise extension of the “right to exclude” granted by a patent and to prevent possible harassment by multiple assignees. A nonstatutory double patenting rejection is appropriate where the conflicting claims are not identical, but at least one examined application claim is not patentably distinct from the reference claim(s) because the examined application claim is either anticipated by, or would have been obvious over, the reference claim(s). See, e.g., In re Berg , 140 F.3d 1428, 46 USPQ2d 1226 (Fed. Cir. 1998); In re Goodman , 11 F.3d 1046, 29 USPQ2d 2010 (Fed. Cir. 1993); In re Longi , 759 F.2d 887, 225 USPQ 645 (Fed. Cir. 1985); In re Van Ornum , 686 F.2d 937, 214 USPQ 761 (CCPA 1982); In re Vogel , 422 F.2d 438, 164 USPQ 619 (CCPA 1970); In re Thorington , 418 F.2d 528, 163 USPQ 644 (CCPA 1969). A timely filed terminal disclaimer in compliance with 37 CFR 1.321(c) or 1.321(d) may be used to overcome an actual or provisional rejection based on nonstatutory double patenting provided the reference application or patent either is shown to be commonly owned with the examined application, or claims an invention made as a result of activities undertaken within the scope of a joint research agreement. See MPEP § 717.02 for applications subject to examination under the first inventor to file provisions of the AIA as explained in MPEP § 2159. See MPEP §§ 706.02(l)(1) - 706.02(l)(3) for applications not subject to examination under the first inventor to file provisions of the AIA. A terminal disclaimer must be signed in compliance with 37 CFR 1.321(b). The USPTO Internet website contains terminal disclaimer forms which may be used. Please visit www.uspto.gov/patent/patents-forms. The filing date of the application in which the form is filed determines what form (e.g., PTO/SB/25, PTO/SB/26, PTO/AIA/25, or PTO/AIA/26) should be used. A web-based eTerminal Disclaimer may be filled out completely online using web-screens. An eTerminal Disclaimer that meets all requirements is auto-processed and approved immediately upon submission. For more information about eTerminal Disclaimers, refer to www.uspto.gov/patents/process/file/efs/guidance/eTD-info-I.jsp. Claims 1-3, 5-18, 22-33, and 37-47 are rejected on the ground of nonstatutory double patenting as being unpatentable over claims 1-3 and 5-14 of U.S. Patent No. 12035347 B2; 1-15 of U.S. Patent No. 11184905 B2; claims 1-3, 5-9, and 14-16 of U.S. Patent No. 10075969 B2. Although the conflicting claims are not identical, they are not patentably distinct from each other because instant application claim is broader in every aspect than the patent claim and is therefore an obvious variant thereof. Application Claim Patent Claim ‘905 Patent Claim ‘969 Patent Claim ‘347 1, 16, 31, and 46. A method of wireless communication between a base station and at least one user equipment comprising the steps of: each user equipment periodically measuring channel quality of communication with the base station; each user equipment periodically transmitting a channel quality indicator to the base station corresponding to a measured channel quality; the base station scheduling communication with the at least one user equipment based upon the periodically transmitted channel quality indicators of the at least one user equipment. 1. A method of wireless communication between a base station and at least one user equipment comprising the steps of: each user equipment periodically measuring channel quality of communication with the base station; each user equipment periodically transmitting a channel quality indicator to the base station corresponding to a measured channel quality; the base station scheduling communication with the at least one user equipment based upon the periodically transmitted channel quality indicators of the at least one user equipment, the scheduling including determining a modulation and coding scheme (MCS) based on a preamble group selected by the at least one user equipment, the preamble group indicating a message (msg3) transmission block size (TBS). 1, 15. A method of wireless communication between a base station and at least one user equipment comprising the steps of: each user equipment periodically transmitting a wide band Sounding Reference Signal (SRS) to the base station for uplink channel state estimation; each user equipment transmitting along with each scheduled uplink transmission a DeModulation Reference Signal (DMRS) to the base station for uplink demodulation and interference estimation; and the base station scheduling uplink communication with each user equipment based upon the SRS and DMRS signals transmitted by each user equipment, the scheduling including estimating the user equipment's channel quality for each frequency chunk, computing a corresponding user equipment's scheduling metric for each frequency chunk, limiting the size of the user equipment's uplink allocation based upon reported headroom and buffer size, and selecting for uplink transmission on a frequency chunk the user equipment with the highest scheduling metric with the constraint of scheduling a user equipment on contiguous frequency chunks; and the base station signaling to the selected user equipment its scheduling grant. 1. A method comprising: receiving a channel quality indicator from each of a plurality of user equipments, the channel quality indicator corresponding to a measured channel quality and being periodically transmitted; and scheduling communication with the at least one user equipment based on a channel quality indicator of the at least one user equipment using a 2-step Signal to Interference plus Noise Ratio computation and link adaptation procedure that includes a pre-scheduling computation and a post-scheduling computation. 2, 17, and 32. The method of claim 1, wherein: said step of scheduling communication schedules uplink transmissions from a user equipment to the base station wherein the base station receives a channel quality indicator of each physical resource block, computes a scheduling metric for each receiver type, and limits the size of uplink allocation based upon reported headroom and buffer size. 2. The method of claim 1, wherein: said step of scheduling communication schedules uplink transmissions from a user equipment to the base station wherein the base station receives a channel quality indicator of each physical resource block, computes a scheduling metric for each receiver type, and limits the size of uplink allocation based upon reported headroom and buffer size. See claim 1. 2. The method of claim 1, wherein scheduling the communication includes scheduling uplink transmissions, wherein scheduling uplink transmissions includes: receiving a channel quality indicator for each physical resource block, computing a scheduling metric for each receiver type, and limiting a size of uplink allocation based on reported headroom and buffer size. 3, 18, 33, and 47. The method of claim 1, further comprising the step of: each user equipment signaling the base station a scheduling recommendation regarding Modulation and Coding Scheme and Multiple Input, Multiple Output configuration; and the method wherein said step of scheduling communication schedules downlink transmissions from the base station to a user equipment in response to the recommendations. 3. The method of claim 1, further comprising the step of: each user equipment signaling the base station a scheduling recommendation regarding Modulation and Coding Scheme and Multiple Input, Multiple Output configuration; and the method wherein said step of scheduling communication schedules downlink transmissions from the base station to a user equipment in response to the recommendations. 16. The wireless communication system of claim 15, wherein: said user equipment is further configured to signal the base station a scheduling recommendation regarding Modulation and Coding Scheme and Multiple Input, Multiple Output configuration; and said base station is further configured to schedule downlink transmissions from the base station to a user equipment in response to the recommendations; and said base station signals to each scheduled user equipment its scheduling grant. 3. The method of claim 1, further comprising: each user equipment signaling a scheduling recommendation regarding Modulation and Coding Scheme and Multiple Input, Multiple Output configuration, wherein scheduling the communication includes scheduling downlink transmissions in response to the recommendations. 5. The method of claim 1, wherein: said step of scheduling communication employs a minimum scheduling unit of an integer NRB of Physical Resource Blocks. 5. The method of claim 1, wherein: scheduling the communication includes employing a minimum scheduling unit of an integer number (N.sub.RB) of Physical Resource Blocks. 6. The method of claim 1, wherein: said step of scheduling communication estimates for a given channel quality information available at transmission interval n and on frequency chunk b which modulation and coding scheme (MCS) out of a fixed MCS set must be assigned to a user transmitting at transmission interval n+K. 6. The method of claim 1, wherein: scheduling the communication includes estimating for a given channel quality information available at transmission interval n and on frequency chunk b which modulation and coding scheme (MCS) out of a fixed MCS set to assign to a user transmitting at transmission interval n+K, where K is an integer. 7, 22, and 37. The method of claim 1, wherein: said step of scheduling communication for each allocation employs a Physical Downlink Control CHannel mapping function including computing a cost function for each Control Channel Element by where: C(n) is the Control Channel element cost function to be calculated; S (n) is the set of active UEs at the n-th subframe; and A (n) is the cost of user j associated with the i-th CCE at the n-th subframe. 7. The method of claim 1, wherein: said step of scheduling communication for each allocation employs a Physical Downlink Control CHannel mapping function including computing a cost function for each Control Channel Element by C i ⁡ ( n ) = .Math. j ∈ S ⁡ ( n ) ⁢ A i , j ⁡ ( n ) where: C.sub.i(n) is the Control Channel element cost function to be calculated; S(n) is the set of active UEs at the n-th subframe; and A.sub.i,j(n) is the cost of user j associated with the i-th CCE at the n-th subframe. 2. The method of claim 1, further comprising: transmitting a schedule from the base station to a user equipment via a Physical Downlink Control Channel, wherein said step of scheduling communication for each allocation employs a Physical Downlink Control CHannel mapping function including computing a cost function for each Control Channel Element (CCE); and mapping a scheduled UE j to the available CCE combination within its user search space that minimizes C.sub.i(n); and transmitting the PDCCH to the scheduled UEs. 7. The method of claim 1, wherein: scheduling the communication includes, for each allocation, employing a Physical Downlink Control CHannel mapping function including computing a cost function for each Control Channel Element based on: Mathematical function where: C.sub.i(n) is the Control Channel element cost function to be calculated; S(n) is the set of active UEs at the n-th subframe; and A.sub.i,j(n) is the cost of user j associated with the i-th CCE at the n-th subframe. 8-10, 23-25, and 38-40. The method of claim 1, wherein: said step of scheduling communication includes a 2-step Signal to Interference plus Noise Ratio computation and link adaptation including pre-scheduling by computing *MMSE(b) upon every new UEs Sounding Reference Signal instance with per-chunk granularity by harmonic averaging across sub-carriers; and post-scheduling on every sub-frame for link adaptation by recomputing •MMSE(Bk) for each scheduled user equipment k taking into account both the size of the final allocations B. and the freshest interference k measurement. 8-10. The method of claim 1, wherein: said step of scheduling communication includes a 2-step Signal to Interference plus Noise Ratio computation and link adaptation including pre-scheduling by computing γ.sub.MMSE(b) upon every new UEs Sounding Reference Signal instance with per-chunk granularity by harmonic averaging across sub-carriers, where b is the scheduling unit; and post-scheduling on every sub-frame for link adaptation by recomputing γ.sub.MMSE(B.sub.k) for each scheduled user equipment k taking into account both the size of the final allocations B.sub.k and the freshest interference measurement. 3. A method of wireless communication between a base station and at least one user equipment comprising the steps of: each user equipment periodically transmitting a wide band Sounding Reference Signal (SRS) to the base station for uplink channel state estimation; each user equipment transmitting along with each scheduled uplink transmission a DeModulation Reference Signal (DMRS) to the base station for uplink demodulation and interference estimation; and the base station scheduling uplink communication with the at least one user equipment based upon the SRS and DMRS signals transmitted by the at least one user equipment, said scheduling uplink communication includes a 2-step Signal to Interference plus Noise Ratio computation and link adaptation including: in a first step referred to as pre-scheduling, computing the Signal to Interference plus Noise Ratio Y(b) for each frequency chunk b upon every new UE's Sounding Reference Signal instance; in a second step referred to as post-scheduling, on every sub-frame, recomputing the Signal to Interference plus Noise Ratio Y(B.sub.k) for each schedule user equipment k taking into account both the size of the final allocation B.sub.k and the freshest interference measurement; and determining from Y(B.sub.k) the modulation and coding scheme (MCS) to be used for each scheduled user equipment k; and the base station signaling to each scheduled user equipment k its scheduling grant including said MCS. 8-10. The method of claim 1, wherein the 2-step Signal to Interference plus Noise Ratio computation and link adaptation procedure includes: pre-scheduling by computing γ.sub.MMSE(b) upon every new UEs Sounding Reference Signal instance with per-chunk granularity by harmonic averaging across sub-carriers, where b is indicative of a scheduling unit; and post-scheduling on every sub-frame for link adaptation by recomputing γ.sub.MMSE(B.sub.k) for each scheduled user equipment k taking into account both the size of the final allocations B.sub.k and the freshest interference measurement. 11, 26, and 41. The method of claim 10, wherein: said step of initial subband allocation and expansion includes sorting the top NbestDL UEs among Npre per subband to produce two UE by SB tables , where the first table provides the IDs of the sorted UEs and the second table provides the associated scheduling metric, defining an allocation loop as a series of allocation iterations, each allocation iteration being an attempt to allocate one UE on one or multiple subbands including an initial SB allocated to the remaining UE with the maximum scheduling metric, performing a recursive maximum expansion (RME) on both sides of the initial allocated subband, the outcome of each allocation iteration disqualifying one UE as either not having a PDCCH resource or less than other remaining UEs with higher scheduling metrics on each side. 11. The method of claim 10, wherein: said step of initial subband allocation and expansion includes sorting the UEs with highest scheduling metric among competing UEs per subband to produce two UEs by subband tables, where the first table provides the IDs of the sorted UEs and the second table provides the associated scheduling metric, defining an allocation loop as a series of allocation iterations, each allocation iteration being an attempt to allocate one UE on one or multiple subbands including an initial subband allocated to the remaining UE with the maximum scheduling metric, performing a recursive maximum expansion (RME) on both sides of the initial allocated subband, the outcome of each allocation iteration disqualifying one UE as either not having a Physical Downlink Control Channel (PDCCH) resource or less than other remaining UEs with higher scheduling metrics on each side. 5, 6. The method of claim 5, wherein said step of initial subband allocation and expansion includes sorting UEs with highest scheduling metric among competing UEs per subband to produce two UEs by subband tables, where the first table provides the indices of the sorted UEs and the second table provides the associated scheduling metric, defining an allocation loop as a series of allocation iterations, each allocation iteration being an attempt to allocate one UE on one or multiple subbands including an initial subband allocated to the remaining UE with the maximum scheduling metric, performing a recursive maximum expansion (RME) on both sides of the initial allocated subband, the outcome of each allocation iteration disqualifying one UE as either not having a Physical Downlink Control Channel (PDCCH) resource or less than other remaining UEs with higher scheduling metrics on each side. 12, 27, and 42. The method of claim 10, wherein: said step of subband gap filling is performed by maximum subband first including finding the subband with a maximum metric for two edge target UEs, checking if the subband with the maximum metric can be covered by the PHR and buffered data of its target UE, and if so allocating that subband to the target UE, if not proceeding the next maximum subbband, and upon allocation of a subband allocating the subands between that subband and the subband of the same UE to that UE for contiguous allocation. 12. The method of claim 10, wherein: said step of subband gap filling is performed by maximum subband first including finding the subband with a maximum metric for two edge target UEs, checking if the subband with the maximum metric can be covered by the PHR and buffered data of its target UE, and if so allocating that subband to the target UE, if not proceeding the next maximum subbband, and upon allocation of a subband allocating the subands between that subband and the subband of the same UE to that UE for contiguous allocation. 7. The method of claim 5, wherein: said step of subband gap filling is performed by maximum subband first including finding the subband with a maximum metric for two edge target UEs, checking if the subband with the maximum metric can be covered by power headroom (PHR) and buffered data of its target UE, and if so allocating that subband to the target UE, if not proceeding the next maximum subband, and upon allocation of a subband allocating the subbands between that subband and the subband of the same UE to that UE for contiguous allocation. 11. The method of claim 10, wherein: the subband gap filling is performed by maximum subband first including: finding the subband with a maximum metric for two edge target UEs, checking if the subband with the maximum metric can be covered by the PHR and buffered data of its target UE, and if so allocating that subband to the target UE, if not proceeding the next maximum subband, and upon allocation of a subband allocating the subands between that subband and the subband of the same UE to that UE for contiguous allocation. 13, 28, and 43. The method of claim 10, wherein: said step of subband gap filling is performed by higher edge first including iteratively comparing the metrics of two edge subbands of respective adjacent UEs, allocating the subband having the higher metric to its edge UE, and checking for power shortage. 13. The method of claim 10, wherein: said step of subband gap filling is performed by higher edge first including iteratively comparing the metrics of two edge subbands of respective adjacent UEs, allocating the subband having the higher metric to its edge UE, and checking for power shortage. 8. The method of claim 5, wherein: said step of subband gap filling is performed by higher edge first including iteratively comparing the metrics of two edge subbands of respective adjacent UEs, allocating the subband having the higher metric to its edge UE, and checking for power shortage. 12. The method of claim 10, wherein: the subband gap filling is performed by higher edge first including iteratively comparing the metrics of two edge subbands of respective adjacent UEs, allocating the subband having the higher metric to its edge UE, and checking for power shortage. 14, 29, and 44. The method of claim 10, wherein: said step of scheduling communication including 2-step recursive maximum expansion calculation wherein a special uplink communication is limited to a pre-determined transport block size that cannot be segmented including scheduling special uplink communication first allocating such special uplink communication onto physical resource blocks with the best signal to interference and noise ratio. 14. The method of claim 10, wherein: said step of scheduling communication including 2-step recursive maximum expansion calculation wherein a special uplink communication is limited to a pre-determined transport block size that cannot be segmented including scheduling special uplink communication first allocating such special uplink communication onto physical resource blocks with the best signal to interference and noise ratio. 9. The method of claim 5, wherein: said step of scheduling communication including 2-step recursive maximum expansion calculation wherein a special uplink communication is limited to a pre-determined transport block size that cannot be segmented including scheduling special uplink communication first allocating such special uplink communication onto physical resource blocks with the best signal to interference and noise ratio. 13. The method of claim 10, wherein: scheduling the communication includes performing a 2-step recursive maximum expansion calculation wherein a special uplink communication is limited to a pre-determined transport block size that cannot be segmented including scheduling a special uplink communication first allocating such special uplink communication onto physical resource blocks with the best signal to interference and noise ratio. 15, 30, and 45. The method of claim 1, wherein: said step of scheduling communication schedules downlink communication by dividing the scheduling bandwidth into scheduling units of size the channel quality indicator report granularity, running sequentially over the scheduling units and for each scheduling unit and each set of active radio bearers, following user equipment recommendations to compute a scheduling metric for each radio bearer, sorting the scheduling metric the each radio bearers from best to worst, iteratively attempting to allocate physical downlink control channel to radio bearer/user equipment combinations from best to worst including upon physical downlink control channel allocation success, allocating the winning radio bearer/user equipment combinations to the corresponding scheduling unit, and disqualifying a user equipment if the user equipment does not have a physical downlink control channel resource or if an amount of data currently pending in a user equipment buffer reaches the size, and computing for each scheduled user equipment a final transport buffer size and a modulation and coding scheme accounting for all radio bearer groups allocated to that user equipment, delivering the grants for physical downlink control channel mapping, and triggers radio link control/medium access control to construct the medium access control protocol data units. 15. The method of claim 1, wherein: said step of scheduling communication schedules downlink communication by dividing the scheduling bandwidth into scheduling units of size the channel quality indicator report granularity, running sequentially over the scheduling units and for each scheduling unit and each set of active radio bearers, following user equipment recommendations to compute a scheduling metric for each radio bearer, sorting the scheduling metric the each radio bearers from best to worst, iteratively attempting to allocate physical downlink control channel to radio bearer/user equipment combinations from best to worst including upon physical downlink control channel allocation success, allocating the winning radio bearer/user equipment combinations to the corresponding scheduling unit, and disqualifying a user equipment if the user equipment does not have a physical downlink control channel resource or if an amount of data currently pending in a user equipment buffer reaches the size, and computing for each scheduled user equipment a final transport buffer size and a modulation and coding scheme accounting for all radio bearer groups allocated to that user equipment, delivering the grants for physical downlink control channel mapping, and triggers radio link control/medium access control to construct the medium access control protocol data units. 14. A method of wireless communication between a base station and at least one user equipment comprising the steps of: each user equipment periodically measuring channel quality of communication with the base station; each user equipment periodically transmitting a channel quality indicator to the base station corresponding to a measured channel quality; the base station scheduling communication with the at least one user equipment, wherein: said step of scheduling communication schedules downlink communication by dividing the scheduling bandwidth into scheduling units of size the channel quality indicator report granularity, running sequentially over the scheduling units and for each scheduling unit and each set of active radio bearers, following user equipment recommendations to compute a scheduling metric for each radio bearer, sorting the scheduling metric the each radio bearers from best to worst, iteratively attempting to allocate physical downlink control channel to radio bearer/user equipment combinations from best to worst including upon physical downlink control channel allocation success, allocating the winning radio bearer/user equipment combinations to the corresponding scheduling unit, and disqualifying a user equipment if the user equipment does not have a physical downlink control channel resource or if an amount of data currently pending in a user equipment buffer reaches the size, and computing for each scheduled user equipment a final transport buffer size and a modulation and coding scheme accounting for all radio bearer groups allocated to that user equipment, delivering the grants for physical downlink control channel mapping, and triggering radio link control/medium access control to construct the medium access control protocol data units. 14. The method of claim 1, wherein: scheduling the communication includes scheduling downlink communication by: dividing the scheduling bandwidth into scheduling units of size the channel quality indicator report granularity, running sequentially over the scheduling units and for each scheduling unit and each set of active radio bearers, following user equipment recommendations to compute a scheduling metric for each radio bearer, sorting the scheduling metric the each radio bearers from best to worst, iteratively attempting to allocate physical downlink control channel to radio bearer/user equipment combinations from best to worst including: upon physical downlink control channel allocation success, allocating the winning radio bearer/user equipment combinations to the corresponding scheduling unit, and disqualifying a user equipment if the user equipment does not have a physical downlink control channel resource or if an amount of data currently pending in a user equipment buffer reaches the size, and computing for each scheduled user equipment a final transport buffer size and a modulation and coding scheme accounting for all radio bearer groups allocated to that user equipment, delivering the grants for physical downlink control channel mapping, and triggers radio link control/medium access control to construct the medium access control protocol data units. Allowable Subject Matter Claims 8-15 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims as well as overcoming any respective 112 second paragraph rejection. Conclusion 07-96 AIA The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Krishnamurthy et al. (US 20130308485 A1) - The transceiver also receives a message from the first base station identifying a third set of time-frequency resources that is a subset of the first set of time-frequency resources, and estimates the channel state based on the transmission received in the third set of time-frequency resources. Heo et al. (US 20110268045 A1) - Each first ranking is at least partially determined by whether the component carrier is configured for delay-sensitive transmissions. The method includes using the at least one first ranking to select a first component carrier for transmission of uplink control information, and encoding uplink control information into the first component carrier for transmission to the base station. Cai et al. (US 20110199985 A1) - A first modulation and coding scheme (MCS) may be determined for when the base station transmits at a low power based on the received CQI. When the spectrum efficiency of the first MCS is equal to or higher than the spectrum efficiency of a pre-determined MCS, first UE may be communicated with using a low power transmission. In some cases, a physical downlink control channel (PDCCH) downlink control information (DCI) message is transmitted to the first UE to identify a power spectral density (PSD) level. Any inquiry concerning this communication or earlier communications from the examiner should be directed to DONALD L MILLS whose telephone number is (571)272-3094. The examiner can normally be reached Monday through Friday from 9-5 PM EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Yemane Mesfin can be reached at 571-272-3927. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. DONALD L. MILLS Primary Examiner Art Unit 2462 /Donald L Mills/ Primary Examiner, Art Unit 2462 Application/Control Number: 18/766,296 Page 2 Art Unit: 2462 Application/Control Number: 18/766,296 Page 3 Art Unit: 2462 Application/Control Number: 18/766,296 Page 4 Art Unit: 2462 Application/Control Number: 18/766,296 Page 5 Art Unit: 2462 Application/Control Number: 18/766,296 Page 6 Art Unit: 2462 Application/Control Number: 18/766,296 Page 7 Art Unit: 2462 Application/Control Number: 18/766,296 Page 8 Art Unit: 2462 Application/Control Number: 18/766,296 Page 9 Art Unit: 2462 Application/Control Number: 18/766,296 Page 10 Art Unit: 2462 Application/Control Number: 18/766,296 Page 11 Art Unit: 2462 Application/Control Number: 18/766,296 Page 12 Art Unit: 2462 Application/Control Number: 18/766,296 Page 13 Art Unit: 2462 Application/Control Number: 18/766,296 Page 14 Art Unit: 2462 Application/Control Number: 18/766,296 Page 15 Art Unit: 2462 Application/Control Number: 18/766,296 Page 16 Art Unit: 2462 Application/Control Number: 18/766,296 Page 17 Art Unit: 2462 Application/Control Number: 18/766,296 Page 18 Art Unit: 2462 Application/Control Number: 18/766,296 Page 19 Art Unit: 2462 Application/Control Number: 18/766,296 Page 20 Art Unit: 2462 Application/Control Number: 18/766,296 Page 21 Art Unit: 2462 Application/Control Number: 18/766,296 Page 22 Art Unit: 2462 Application/Control Number: 18/766,296 Page 23 Art Unit: 2462 Application/Control Number: 18/766,296 Page 24 Art Unit: 2462 Application/Control Number: 18/766,296 Page 25 Art Unit: 2462 Application/Control Number: 18/766,296 Page 26 Art Unit: 2462 Application/Control Number: 18/766,296 Page 27 Art Unit: 2462 Application/Control Number: 18/766,296 Page 28 Art Unit: 2462 Application/Control Number: 18/766,296 Page 29 Art Unit: 2462 Application/Control Number: 18/766,296 Page 30 Art Unit: 2462 Application/Control Number: 18/766,296 Page 31 Art Unit: 2462 Application/Control Number: 18/766,296 Page 32 Art Unit: 2462 Application/Control Number: 18/766,296 Page 33 Art Unit: 2462 Application/Control Number: 18/766,296 Page 34 Art Unit: 2462 Application/Control Number: 18/766,296 Page 35 Art Unit: 2462 Application/Control Number: 18/766,296 Page 36 Art Unit: 2462 Application/Control Number: 18/766,296 Page 37 Art Unit: 2462 Application/Control Number: 18/766,296 Page 38 Art Unit: 2462 Application/Control Number: 18/766,296 Page 39 Art Unit: 2462 Application/Control Number: 18/766,296 Page 40 Art Unit: 2462 Application/Control Number: 18/766,296 Page 41 Art Unit: 2462 Application/Control Number: 18/766,296 Page 42 Art Unit: 2462 Application/Control Number: 18/766,296 Page 43 Art Unit: 2462 Application/Control Number: 18/766,296 Page 44 Art Unit: 2462 Application/Control Number: 18/766,296 Page 45 Art Unit: 2462 Application/Control Number: 18/766,296 Page 46 Art Unit: 2462 Application/Control Number: 18/766,296 Page 47 Art Unit: 2462 Application/Control Number: 18/766,296 Page 48 Art Unit: 2462 Application/Control Number: 18/766,296 Page 49 Art Unit: 2462 Application/Control Number: 18/766,296 Page 50 Art Unit: 2462 Application/Control Number: 18/766,296 Page 51 Art Unit: 2462 Application/Control Number: 18/766,296 Page 52 Art Unit: 2462 Application/Control Number: 18/766,296 Page 53 Art Unit: 2462 Application/Control Number: 18/766,296 Page 54 Art Unit: 2462 Application/Control Number: 18/766,296 Page 55 Art Unit: 2462 Application/Control Number: 18/766,296 Page 56 Art Unit: 2462 Application/Control Number: 18/766,296 Page 57 Art Unit: 2462 Application/Control Number: 18/766,296 Page 58 Art Unit: 2462 Application/Control Number: 18/766,296 Page 59 Art Unit: 2462 Application/Control Number: 18/766,296 Page 60 Art Unit: 2462 Application/Control Number: 18/766,296 Page 61 Art Unit: 2462 Application/Control Number: 18/766,296 Page 62 Art Unit: 2462 Application/Control Number: 18/766,296 Page 63 Art Unit: 2462 Application/Control Number: 18/766,296 Page 64 Art Unit: 2462 Application/Control Number: 18/766,296 Page 65 Art Unit: 2462 Application/Control Number: 18/766,296 Page 66 Art Unit: 2462 Application/Control Number: 18/766,296 Page 67 Art Unit: 2462 Application/Control Number: 18/766,296 Page 68 Art Unit: 2462 Application/Control Number: 18/766,296 Page 69 Art Unit: 2462 Application/Control Number: 18/766,296 Page 70 Art Unit: 2462 Application/Control Number: 18/766,296 Page 71 Art Unit: 2462 Application/Control Number: 18/766,296 Page 72 Art Unit: 2462 Application/Control Number: 18/766,296 Page 73 Art Unit: 2462 Application/Control Number: 18/766,296 Page 74 Art Unit: 2462 Application/Control Number: 18/766,296 Page 75 Art Unit: 2462 Application/Control Number: 18/766,296 Page 76 Art Unit: 2462 Application/Control Number: 18/766,296 Page 77 Art Unit: 2462 Application/Control Number: 18/766,296 Page 78 Art Unit: 2462 Application/Control Number: 18/766,296 Page 79 Art Unit: 2462 Application/Control Number: 18/766,296 Page 80 Art Unit: 2462 Application/Control Number: 18/766,296 Page 81 Art Unit: 2462 Application/Control Number: 18/766,296 Page 82 Art Unit: 2462 Application/Control Number: 18/766,296 Page 83 Art Unit: 2462 Application/Control Number: 18/766,296 Page 84 Art Unit: 2462 Application/Control Number: 18/766,296 Page 85 Art Unit: 2462 Application/Control Number: 18/766,296 Page 86 Art Unit: 2462 Application/Control Number: 18/766,296 Page 87 Art Unit: 2462 Application/Control Number: 18/766,296 Page 88 Art Unit: 2462 Application/Control Number: 18/766,296 Page 89 Art Unit: 2462 Application/Control Number: 18/766,296 Page 90 Art Unit: 2462 Application/Control Number: 18/766,296 Page 91 Art Unit: 2462 Application/Control Number: 18/766,296 Page 92 Art Unit: 2462 Application/Control Number: 18/766,296 Page 93 Art Unit: 2462 Application/Control Number: 18/766,296 Page 94 Art Unit: 2462 Application/Control Number: 18/766,296 Page 95 Art Unit: 2462 Application/Control Number: 18/766,296 Page 96 Art Unit: 2462 Application/Control Number: 18/766,296 Page 97 Art Unit: 2462 Application/Control Number: 18/766,296 Page 98 Art Unit: 2462 Application/Control Number: 18/766,296 Page 99 Art Unit: 2462 Application/Control Number: 18/766,296 Page 100 Art Unit: 2462 Application/Control Number: 18/766,296 Page 101 Art Unit: 2462 Application/Control Number: 18/766,296 Page 102 Art Unit: 2462 Application/Control Number: 18/766,296 Page 103 Art Unit: 2462 Application/Control Number: 18/766,296 Page 104 Art Unit: 2462 Application/Control Number: 18/766,296 Page 105 Art Unit: 2462 Application/Control Number: 18/766,296 Page 106 Art Unit: 2462 Application/Control Number: 18/766,296 Page 107 Art Unit: 2462 Application/Control Number: 18/766,296 Page 108 Art Unit: 2462 Application/Control Number: 18/766,296 Page 109 Art Unit: 2462 Application/Control Number: 18/766,296 Page 110 Art Unit: 2462 Application/Control Number: 18/766,296 Page 111 Art Unit: 2462 Application/Control Number: 18/766,296 Page 112 Art Unit: 2462 Application/Control Number: 18/766,296 Page 113 Art Unit: 2462
Read full office action

Prosecution Timeline

Jul 08, 2024
Application Filed
May 20, 2026
Non-Final Rejection mailed — §102, §103, §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12750306
GATE CONTROLLED FRAME OR PACKET REPLICATION AND ELIMINATION FUNCTION IN CLOUD ENVIRONMENT
2y 11m to grant Granted Sep 29, 2026
Patent 12750850
WIDEBAND DOWNLINK PRECODING IN SUBBAND FULL DUPLEX SYMBOLS
2y 8m to grant Granted Sep 29, 2026
Patent 12750099
METHOD AND APPARATUS OF MULTI-USER SELECTION FOR MULTI-USER MIMO
2y 10m to grant Granted Sep 29, 2026
Patent 12744592
ADAPTIVE CONSTANT BIT RATE BANDWIDTH ALLOCATION FOR TRAFFIC OVER A SATELLITE NETWORK
2y 10m to grant Granted Sep 22, 2026
Patent 12739189
OPTIMIZED ASSIGNMENT OF REPLICATION-MULTICAST IP ADDRESSES TO OVERLAY-MULTICAST GROUPS
3y 2m to grant Granted Sep 15, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
85%
Grant Probability
96%
With Interview (+10.9%)
2y 10m (~7m remaining)
Median Time to Grant
Low
PTA Risk
Based on 958 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email