Prosecution Insights
Last updated: October 25, 2026
Application No. 18/771,463

PARALLEL HYBRID POWERPLANT WITH TURBOFAN ENGINE CORE

Non-Final OA §102§103§112
Filed
Jul 12, 2024
Priority
Jan 14, 2022 — provisional 63/299,794 +2 more
Examiner
HTAY, AYE SU MON
Art Unit
3745
Tech Center
3700 — Mechanical Engineering & Manufacturing
Assignee
Verdego Aero Inc.
OA Round
3 (Non-Final)
67%
Grant Probability
Favorable
3-4
OA Rounds
11m
Est. Remaining
96%
With Interview

Examiner Intelligence

Grants 67% — above average
67%
Career Allowance Rate
246 granted / 366 resolved
-2.8% vs TC avg
Strong +28% interview lift
Without
With
+28.5%
Interview Lift
resolved cases with interview
Typical timeline
3y 3m
Avg Prosecution
20 currently pending
Career history
394
Total Applications
across all art units

Statute-Specific Performance

§101
0.8%
-39.2% vs TC avg
§103
42.5%
+2.5% vs TC avg
§102
27.3%
-12.7% vs TC avg
§112
28.5%
-11.5% vs TC avg
Black line = Tech Center average estimate • Based on career data from 366 resolved cases

Office Action

§102 §103 §112
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Continued Examination Under 37 CFR 1.114 A request for continued examination under 37 CFR 1.114, including the fee set forth in 37 CFR 1.17(e), was filed in this application after final rejection. Since this application is eligible for continued examination under 37 CFR 1.114, and the fee set forth in 37 CFR 1.17(e) has been timely paid, the finality of the previous Office action has been withdrawn pursuant to 37 CFR 1.114. Applicant's submission filed on 02/13/2026 has been entered. Response to Arguments Applicant's arguments filed 02/13/2026 have been fully considered but they are not persuasive. Regarding Claim 21, the Applicant’s position is that Lugg et al. (US 20130062455, hereinafter: “Lugg”) does not disclose a plurality of sectors; wherein the first wiring and the second wiring are configured to supply power from the first sector and the second sector, respectively, to different components of an aircraft. The Examiner has fully considered the Applicant’s position; however, respectfully disagrees. As discussed in the 35 USC § 112 below, the claimed sector(s) in Claim 21 is indefinite. Since the claim does not include any explanation, or definition of what is considered a plurality of sectors of the electric machine, the claimed sector(s) are given the broadest reasonable interpretation. For the purposes of examination, the Examiner has interpreted the plurality of portions of the bus 122 of Lugg (as shown in annotated Figure 9 of Lugg) as the plurality of sectors. The indicated sectors are connected to cables 98 (“1st wiring” and “2nd wiring” as shown in annotated Figure 9 of Lugg) which are intended to power the plurality of lift fans [0052]. Therefore, Lugg discloses the amended claim verbiage of Claim 21. Claim Rejections - 35 USC § 112 The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. Claims 21-25 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. In Claim 21, the claim verbiage “a plurality of sectors”, “a first sector” and “a second sector” are indefinite. The claim does not provide any definition or requirements of the claimed sector(s). For the purposes of examination, the claimed sector(s) are given the broadest reasonable interpretation. Claims 22-25 are rejected as being dependent on rejected claim(s). Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claims 21-23 are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Lugg et al. (US 20130062455, hereinafter: “Lugg”). In reference to Claim 21 Lugg discloses: A hybrid aircraft powerplant (10) comprising: a turbine engine (30) comprising a shaft (74) configured to output power from the turbine engine; a bypass fan (44); and an electric machine (90 electric generator, [0054]), wherein: the shaft (74) is configured to deliver the output power to the bypass fan (44, “Rectifier 120 converts the alternating current produced by the main generator 90 into direct current, which is distributed along power bus 122 to the various lifting fans 44” [0054]; the electric machine (90 electric generator) is segmented into a plurality of sectors (sections of bus 122; as shown by “1st sector” ; “2nd sector”; and “sectors” in annotated Figure 9 of Lugg), such that the electric machine is configured to generate electric power in response to receiving the output power from the turbine engine; and the electric power is output from the electric machine via a plurality of outputs (output of one of the sectors from bus 122 to wiring 98), each one of the plurality of outputs being associated with one of the plurality of sectors of the electric machine; wherein: first wiring (one cable 98) is electrically connected to a first output (first output of 1st sector) of the plurality of outputs associated with a first sector of the plurality of sectors; second wiring (second cable 98) is electrically connected to a second output of the plurality of outputs associated with a second sector (second output of 1st sector) of the plurality of sectors; and the first wiring and the second wiring are configured to supply power from the first sector and the second sector, respectively, to different components (lift fans) of an aircraft. [0052, Lugg] The generator 90 includes magnets 94, which are centered within and rotates within coil casing 96. Power cables 98 are used to take off electrical current generated by the generator 90 and distribute it to the lifting fan system, as explained in more detail below. [0054, Lugg] As illustrated, gas turbine 72--coupled to the generator via the electric clutch assembly 92 (not illustrated)--drives the main generator 90. Rectifier 120 converts the alternating current produced by the main generator 90 into direct current, which is distributed along power bus 122 to the various lifting fans 44. Each lifting fan 44 is driven by a fan motor 45, and each fan motor 45 has an inverter 47 associated with it to smooth, condition, and regulate the amount of direct current from the power bus 122 before it is fed to the particular fan motor 45… PNG media_image1.png 896 804 media_image1.png Greyscale Figure 1: Annotated Figure 9 of Lugg. In reference to Claim 22 Lugg discloses: The hybrid aircraft powerplant of claim 21, further comprising a plurality of inverters (47), wherein each of the plurality of outputs is configured to output alternating current (AC) power to one of the plurality of inverters, and further wherein each of the plurality of inverters is configured to convert the AC power to direct current (DC) power (“Rectifier 120 converts the alternating current produced by the main generator 90 into direct current, which is distributed along power bus 122 to the various lifting fans 44,” [0054]). In reference to Claim 23 Lugg discloses: The hybrid aircraft powerplant of claim 22, wherein the plurality of inverters are configured to output the DC power to one or more DC busses (120, 122; “Rectifier 120 converts the alternating current produced by the main generator 90 into direct current, which is distributed along power bus 122 to the various lifting fans 44. Each lifting fan 44 is driven by a fan motor 45, and each fan motor 45 has an inverter 47 associated with it to smooth, condition, and regulate the amount of direct current from the power bus 122 before it is fed to the particular fan motor 45” [0054]; Fig. 9). Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claim 24 is rejected under 35 U.S.C. 103 as being unpatentable over Lugg et al. (US 20130062455, hereinafter: “Lugg”) in view of Zhang et al. (CN 202610358, hereinafter: “Zhang”). In reference to Claim 24 Lugg discloses: The hybrid aircraft powerplant of claim 23, wherein the one or more DC busses (120, 122) [0048] (Fig. 9). Lugg is silent on the one or more DC busses comprises aluminum wiring. Zhang teaches a rectifier DC outlet bus comprising aluminum wiring (“Rectifier direct current outlet bus and direct current power distribution bus is connected with structure, comprising a direct current power distribution bus and rectifier direct current outlet bus, rectifier direct current bus and the wire outlet copper-aluminium transition part of the copper column, one end of the aluminium plate and aluminium soft connection of the copper-aluminium composite welding and the other end aluminium soft connection with the DC power distribution bus. This utility model has advantages: after adopting the utility model, copper-aluminium transition part solves the problem of copper aluminium bus-bar connection, saving about the bus once investment, dismounting the rectifier and provides convenient,” Abstract of the English Translation of Zhang). Based on the teaching of Lugg and Zhang, it would have been obvious to one having ordinary skill in the art before the effective filing date of the claimed invention to modify the rectifier DC outlet bus of Lugg by constructing it using aluminum wiring as taught by Zhang for the purpose of utilizing a well-known wiring material. Claim 25 is rejected under 35 U.S.C. 103 as being unpatentable over Lugg et al. (US 20130062455, hereinafter: “Lugg”) in view of Shinohara et al. (JP H07170652, hereinafter: “Shinohara”). In reference to Claim 25 Lugg discloses: The hybrid aircraft powerplant of claim 23, wherein the one or more DC busses (120, 122) [0048] (Fig. 9). Lugg is silent on the one or more DC busses (120 rectifier, 122; [0054], Fig. 9) comprises wiring composed of a superconducting material. Shinohara teaches a rectifier DC outlet bus comprising wiring composed of a superconducting material. (“In the superconducting coil protection device having such a structure, the AC power input from the AC power source through the transformer 31 is converted into DC power by the rectifier 32, and this is converted through the DC breaker 33 into the superconducting coil. 35a, 35b” Page 2 of the English Translation of Shinohara). Based on the teaching of Lugg and Shinohara, it would have been obvious to one having ordinary skill in the art before the effective filing date of the claimed invention to modify the rectifier DC outlet bus of Lugg by constructing it using wiring composed of superconducting material as taught by Shinohara for the purpose of utilizing a well-known wiring material. Allowable Subject Matter Claims 1-20 are allowed. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to AYE SU MON HTAY whose telephone number is (571)270-5958. The examiner can normally be reached Monday-Friday, 9:00am-3:00pm PST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Nathan Wiehe can be reached at 571-272-8648. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /AYE S HTAY/Examiner, Art Unit 3745 /NATHANIEL E WIEHE/Supervisory Patent Examiner, Art Unit 3745
Read full office action

Prosecution Timeline

Jul 12, 2024
Application Filed
Sep 27, 2024
Response after Non-Final Action
Nov 07, 2024
Non-Final Rejection mailed — §102, §103, §112
May 07, 2025
Response Filed
Aug 13, 2025
Final Rejection mailed — §102, §103, §112
Feb 13, 2026
Request for Continued Examination
Mar 06, 2026
Response after Non-Final Action
Oct 02, 2026
Non-Final Rejection mailed — §102, §103, §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12724937
WIND FARM BLOCKAGE
4y 2m to grant Granted Sep 01, 2026
Patent 12716365
TURBINE ENGINE MODULE EQUIPPED WITH A PROPELLER AND STATOR VANES CARRIED BY TWO CASINGS AND CORRESPONDING TURBINE ENGINE
3y 5m to grant Granted Aug 25, 2026
Patent 12679527
CONTROLLING RATE OF ROTOR FEATHER BY SYSTEM SECONDARY TO PRIMARY BLADE ANGLE CONTROL SYSTEM
3y 6m to grant Granted Jul 14, 2026
Patent 12663017
INFLATOR HAVING COMBINED CUTWATER AND INTAKE/EXHAUST PORT
1y 10m to grant Granted Jun 23, 2026
Patent 12650094
GEARBOX ASSEMBLIES WITH IDLER GEARS
1y 7m to grant Granted Jun 09, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
67%
Grant Probability
96%
With Interview (+28.5%)
3y 3m (~11m remaining)
Median Time to Grant
High
PTA Risk
Based on 366 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month