Prosecution Insights
Last updated: October 04, 2026
Application No. 18/794,517

ROBUST FIRMWARE AND CONFIGURATION UPDATE OVER NETWORK

Non-Final OA §102
Filed
Oct 18, 2024
Priority
Mar 18, 2020 — provisional 62/991,370 +1 more
Examiner
KENDALL, CHUCK O
Art Unit
Tech Center
Assignee
Aclara Technologies LLC
OA Round
1 (Non-Final)
87%
Grant Probability
Favorable
1-2
OA Rounds
1y 0m
Est. Remaining
95%
With Interview

Examiner Intelligence

Grants 87% — above average
87%
Career Allowance Rate
810 granted / 933 resolved
+26.8% vs TC avg
Moderate +8% lift
Without
With
+8.0%
Interview Lift
resolved cases with interview
Typical timeline
2y 11m
Avg Prosecution
27 currently pending
Career history
955
Total Applications
across all art units

Statute-Specific Performance

§101
12.9%
-27.1% vs TC avg
§103
22.2%
-17.8% vs TC avg
§102
50.6%
+10.6% vs TC avg
§112
1.4%
-38.6% vs TC avg
Black line = Tech Center average estimate • Based on career data from 933 resolved cases

Office Action

§102
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . This is in response to Application filed 08/05/24. Claims 1 – 20 have been examined and are pending. Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claim(s) 1 – 20 is/are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Giri et al. 20200356358 A1. Regarding claim 1, Giri anticipates a method comprising: providing input firmware image data to a patch generator [0029, see several patch images being generated and applied to patch image, 0026 shows being applied to firmware]; producing, by the patch generator, a set of upgrade instructions for a piece of target endpoint hardware in a power distribution network based on the firmware image data, wherein the set of upgrade instructions are constructed and arranged to facilitate a modification of a current firmware installation of the target endpoint hardware based on the firmware image data [0026, see custom build and firmware]; producing, by the patch generator, a set of script instructions for a piece of target endpoint hardware, the script instructions including a compatibility script, a program script, and an audit script; and, executing, by the target endpoint hardware, the set of upgrade instructions and the script instructions [0039, see comprising a script]. Regarding claim 2, the method of claim 1, wherein the upgrade instructions, when executed by a network interface card, produce an upgrade file for the target endpoint hardware [0006, see full image upgrade]. Regarding claim 3, the method of claim 2, wherein the firmware image data is provided by: receiving, by the patch generator, a desired firmware image [0031, see patched image is received]; producing, by the patch generator, the firmware image data based on the desired firmware image [0029, see several patch images being generated and applied to patch image, 0026 shows being applied to firmware]; producing, by the patch generator, formatted upgrade instructions by inserting the set of upgrade instructions into a schema [0017, see modified and re-formatted]; and, producing, by the patch generator, upgrade packets by packetizing the formatted upgrade instructions [0017]. Regarding claim 4, the method of claim 3, wherein the target endpoint hardware is a meter, the method further comprising: producing, by the network interface card, a target endpoint hardware upgrade file based on the upgrade packets [0020, shows using packet]; and, communicating, by the network interface card, the upgrade file to the meter [0038]. Regarding claim 5, the method of claim 4, wherein the compatibility script is configured to cause the network interface card to execute commands to confirm a compatibility of the meter with a received target endpoint hardware configuration schema [0038]. Regarding claim 6, the method of claim 5, wherein the program script is configured to cause the network interface card to execute commands to prepare the meter for a change to a current configuration of the meter, and to perform changes to its current configuration [0038 – 0039]. Regarding claim 7, the method of claim 6, wherein the audit script is configured to cause the network interface card to execute data table commands that confirm changes embodied in the program script were effective [0054 – 0055, see network and write program code]. Regarding claims 8 and 15, Giri anticipates a patch generator, configured to: receive firmware image data; produce a set of upgrade instructions for a piece of target endpoint hardware in a power distribution network based on the firmware image data [0026, see custom build and firmware]; wherein the set of upgrade instructions are constructed and arranged to facilitate a modification of a current firmware installation of the target endpoint hardware based on the firmware image data [0029, see several patch images being generated and applied to patch image, 0026 shows being applied to firmware]; and, produce a set of script instructions for a piece of target endpoint hardware, the script instructions including a compatibility script, a program script, and an audit script [0039, see comprising a script]. Regarding claims 9 and 16, the patch generator of claim 8, wherein the upgrade instructions, when executed by a network interface card, produce an upgrade file for the target endpoint hardware [0029, see several patch images being generated and applied to patch image, 0026 shows being applied to firmware]. Regarding claim 10, and 17, the patch generator of claim 9, wherein the firmware image data is provided by: receiving, by the patch generator, a desired firmware image [0031, see patched image is received]; producing, by the patch generator, the firmware image data based on the desired firmware image [0026 - 0031, see patched image is received]; producing, by the patch generator, formatted upgrade instructions by inserting the set of upgrade instructions into a schema [0026 – 0039] and, producing, by the patch generator, upgrade packets by packetizing the formatted upgrade instructions [0026 – 0031]. Regarding 11 and 18, the patch generator of claim 10, wherein the target endpoint hardware is a meter configured to build the upgrade file based on the upgrade packets[0026 – 0039]. Regarding claim 12, the patch generator of claim 11, wherein the compatibility script is configured to cause the network interface card to execute commands to confirm a compatibility of the meter with a received target endpoint hardware configuration schema [0026 – 0039]. Regarding claim 13 and 19, the patch generator of claim 12, wherein the program script is configured to cause the network interface card to execute commands to prepare the meter for a change to a current configuration of the meter, and to perform changes to its current configuration [0026 – 0039]. Regarding claim 14, and 20, the patch generator of claim 13, wherein the audit script is configured to cause the network interface card to execute data table commands that confirm changes embodied in the program script were effective [0026 – 0039]. Correspondence Information Any inquiry concerning this communication or earlier communications from the examiner should be directed to Chuck Kendall whose telephone number is 571-272-3698. The examiner can normally be reached on 10:00 am - 6:30pm. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Hyung Sough can be reached on 571-272-6799. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only [0060 – 0080]. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). /CHUCK O KENDALL/ Primary Examiner, Art Unit 2192
Read full office action

Prosecution Timeline

Oct 18, 2024
Application Filed
Aug 11, 2026
Non-Final Rejection mailed — §102 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12748850
Application Aware Software Asset Inventory
4y 9m to grant Granted Sep 29, 2026
Patent 12730623
EXECUTION OF MEASURE COMMAND FOR FIRMWARE UPDATE AND FIRMWARE UPDATE
2y 9m to grant Granted Sep 08, 2026
Patent 12724607
AUTOMATED CODE DOCUMENTATION
2y 7m to grant Granted Sep 01, 2026
Patent 12724598
PREDICTION OF ENVIRONMENTAL BEHAVIOR AND AUTOMATIC ADJUSTMENT OF NETWORK POLICY GENERATION FOR EDGE INFRASTRUCTURE
2y 11m to grant Granted Sep 01, 2026
Patent 12705040
UPGRADING AN EXISTING STANDARD ELECTRIC VEHICLE (EV) CHARGER FROM GRID TO VEHICLE (V1G) TO V1G PLUS VEHICLE TO GRID (V2G) OPERATION
3y 7m to grant Granted Aug 11, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
87%
Grant Probability
95%
With Interview (+8.0%)
2y 11m (~1y 0m remaining)
Median Time to Grant
Low
PTA Risk
Based on 933 resolved cases by this examiner. Grant probability derived from career allowance rate.