Prosecution Insights
Last updated: November 20, 2026
Application No. 18/811,134

STARTUP CONTROL METHOD OF FUEL CELL SYSTEM

Non-Final OA §103§112
Filed
Aug 21, 2024
Priority
Mar 22, 2024 — RE 10-2024-0039756
Examiner
SHEIKH, HAROON S
Art Unit
1751
Tech Center
1700 — Chemical & Materials Engineering
Assignee
Kia Corporation
OA Round
1 (Non-Final)
71%
Grant Probability
Favorable
1-2
OA Rounds
9m
Est. Remaining
89%
With Interview

Examiner Intelligence

Grants 71% — above average
71%
Career Allowance Rate
329 granted / 466 resolved
+5.6% vs TC avg
Strong +18% interview lift
Without
With
+18.0%
Interview Lift
resolved cases with interview
Typical timeline
3y 0m
Avg Prosecution
32 currently pending
Career history
506
Total Applications
across all art units

Statute-Specific Performance

§101
0.5%
-39.5% vs TC avg
§103
55.8%
+15.8% vs TC avg
§102
22.3%
-17.7% vs TC avg
§112
18.7%
-21.3% vs TC avg
Black line = Tech Center average estimate • Based on career data from 466 resolved cases

Office Action

§103 §112
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Priority Acknowledgment is made of applicant’s claim for foreign priority under 35 U.S.C. 119 (a)-(d). The certified copy has been filed in parent Application No. KR10-2024-0039756, filed on 3/22/2024. Claim Objections Claim 1 is objected to because of the following informalities: Claim 1 – The punctuation after the recitations of “a basic COD control” and “a protection-focused control focused on protection of the fuel cell” are inconsistent, and should be replaced with a comma or a semi-colon. Claim 1 – the recitation, “initiating, by the controller based on the execution of COD…” should be amended to recite: --initiating, by the controller based on the startup execution of COD…-- Appropriate correction is required. Claim Rejections - 35 USC § 112 The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. Claims 1-20 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. Claims 1 and 15 recite selecting and performing a startup control comprising one or more of: "a basic COD control; a protection-focused control focused on protection of the fuel cell system, or a quickness-focused control focused on quick startup". Under MPEP 2173.05(b), relative terms or terms of degree render a claim indefinite when the claim language fails to provide an objective standard or criteria delineating the scope of the terms. Here, the designations "basic COD control," "protection-focused control," and "quickness-focused control" are defined in Claims 1 and 15 purely by intended result or subjective focus (e.g., "focused on protection", "focused on quick startup") rather than by concrete physical machine steps or operational thresholds. Although the claims recite that the selection is based on an integral current value Q and an operating point in a current-voltage plane, Claims 1 and 15 recite no objective boundaries, voltage/current thresholds, or charge ranges that distinguish where "basic" control ends and "protection-focused" or "quickness-focused" control begins. Consequently, a person having ordinary skill in the art cannot determine with reasonable certainty the metes and bounds of the control strategies encompassed by Claims 1 and 15. Claims 2-14 and 16-20 are indefinite by virtue of their direct or indirect dependency on independent claims 1 and 15, respectively. Claim 13 recites: "...based on a second opening degree of the ACV exceeding the reference opening degree, opening the ACV; initiating a second execution of the startup COD..." Claim 1 introduces only "an opening degree of an air control valve (ACV)" without defining a "first" opening degree or establishing an initial opening degree evaluation. Reciting "a second opening degree" without a parent "first opening degree," and "a second execution" when no first execution has taken place (as Claim 13 is directed to an alternative fault-branch upon initial valve inspection per Step S20 to RT3 of Figs. 2 and 5), renders the temporal sequence and structural antecedent basis indefinite. Claim 14 depends from Claim 1 and recites: "wherein the resistive electrical load is turned on and a designated COD purge is performed." Under MPEP 2173.05(p), a process claim that introduces passive states without reciting active steps tied to the execution sequence of the parent method is indefinite. Claim 14 fails to define when, in what order, or by what entity these acts are performed, leaving the operational scope of the method indefinite. Claim 16 recites: "...based on an operating area to which the operating point of the COD circuit belongs and assigned a reference Q value, of the plurality of reference Q values, that the reference value Q reaches." Claim 15 introduces "an integral value Q of current supplied..." but never introduces an accumulating "reference value Q." The threshold to be reached is "a reference Q value," whereas the dynamic accumulating variable is "the integral value Q." Reciting that "the reference value Q reaches" a reference Q value is circular, lacks antecedent basis, and renders the limitation unintelligible. Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. This application currently names joint inventors. In considering patentability of the claims the examiner presumes that the subject matter of the various claims was commonly owned as of the effective filing date of the claimed invention(s) absent any evidence to the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to point out the inventor and effective filing dates of each claim that was not commonly owned as of the effective filing date of the later invention in order for the examiner to consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2) prior art against the later invention. Claim(s) 1, 2, 9, 11-12, 14-16 and 19 is/are rejected under 35 U.S.C. 103 as being unpatentable over Lee (US20210175527A1) in view of Reiser (US20110200901A1). Regarding Claim 1, Lee discloses a method [pars. 0020-25,0106-24; Figs. 1,5, Tables 1,2] comprising: initiating, by a controller of a fuel cell system, hydrogen supply to an anode (controller 60 initiates hydrogen supply from hydrogen supply valve FSV to the fuel electrode/anode of fuel cell stack 10) [pars. 0042,0046,0054,0139; Figs. 1,5; Table 1]; determining, by the controller, that an opening degree of an air control valve ACV, having received a cut-off command, is less than or equal to a reference opening degree (controller 60 controls air cut-off valve ACV to be closed/cut-off and verifies the cut-off state [pars. 0061,0124,0133; Fig. 1; Table 1]; driving, by the controller based on the opening degree of the ACV being less than or equal to the reference opening degree, an air compressor to supply bypass air (controller 60 operates air compressor ACP while ACV blocks air to the cathode [pars. 0052,0061,0124; Fig. 1; Table 1]; determining, by the controller, whether an execution of startup cathode oxidation depletion (COD) is necessary (controller 60 determines whether voltage depletion/oxygen removal across the stack via the COD resistor in coolant heater CHT 63 is required before main power generation [pars. 0062,0108,0130-34; Fig. 5; Table 1]; initiating, by the controller based on the execution of COD being determined necessary, the execution of the startup COD (controller 60 closes COD relay 64 to connect the COD resistor of CHT 63 to consume residual oxygen and bleed stack voltage [pars. 0062,0089-94,0130-34; Figs. 1,5; Table 1]; selecting, by the controller based on an integral value Q of current supplied from a fuel cell stack of the fuel cell system to a resistive electrical load and an operating point, comprising an operating current and an operating voltage, in a current-voltage plane of a COD circuit comprising the fuel cell stack connected to the resistive electrical load, a startup control comprising one or more of: a basic COD control; a protection-focused control focused on protection of the fuel cell system, or a quickness-focused control focused on quick startup; and performing, by the controller, the selected startup control (controller 60 controls startup power routines, monitoring stack voltage and current [pars. 0103-04,0121,0137; Fig. 1], and specifically discharges until an integral value of current reaches a predetermined current amount [par. 0118; Claim 16]. Lee does not explicitly disclose that the current integrated to obtain the value Q is the current supplied from the fuel cell stack specifically to the resistive electrical load (COD circuit) to determine oxygen consumption and select the startup control mode. However, Reiser, from the same field of endeavor, discloses a fuel cell power plant and control process [pars. 0020-25; Figs. 1,2] wherein an auxiliary resistive load 60 is connected across the fuel cell stack 6 to consume residual air-side oxygen and stabilize the stack [Reiser – pars. 0024-25,0028]. Reiser explicitly teaches determining the duration of flowing hydrogen while consuming oxygen by counting coulombs through integrating the electric current through the auxiliary resistive load via current sensor 75 (Q =integral (I dt)) until the integrated coulombs equate to the volume of oxygen consumed in the air side of the power plant [Reiser – pars. 0012-14,0025,0028-32]. Therefore, before the effective filing date of the claimed invention, it would have been obvious for an ordinary skilled artisan to modify Lee by integrating current directly through the resistive electrical load (COD resistor of CHT 63) to calculate the cumulative charge Q as taught by Reiser in order to provide an accurate, quantitative determination of when residual oxygen in the cathode is fully eliminated without relying on sluggish, inaccurate gas sensors, thereby protecting the stack and resistive load while preventing premature main relay closure. Regarding Claim 2, Modified Lee in view of Reiser discloses the method of Claim 1, wherein: the operating point is from one of a plurality of operating areas defined by current-voltage lines of the fuel cell stack and resistive electrical load (Lee monitors stack output voltage and current in relation to operating ranges) [pars. 0103-04,0118-21,0135; Figs. 1,4]; a plurality of reference Q values is assigned to the plurality of operating areas (Reiser teaches integrating to specific predetermined coulomb counts corresponding to specific operational stages) [pars. 0028-32]; and the selecting the startup control is based on an operating area to which the operating point belongs and assigned a reference Q value that the integral value Q reaches (Lee teaches controlling load switching and timing based on whether integrated current reaches a predetermined threshold) [par. 0118; Claim 16]. Regarding Claim 9, Modified Lee in view of Reiser discloses the method of Claim 1, wherein the protection-focused control is configured to cause: turning off the resistive electrical load and the air compressor (Lee teaches opening COD relay 64/65 to turn off CHT 63 and stopping air compressor ACP) [pars. 0061,0124,0132; Table 1]; standing by until one or more of: voltage of the fuel cell stack becomes less than a designated drop completion reference voltage; or a designated reference time elapses (Lee teaches maintaining standby until stack output voltage is reduced to a predetermined voltage) [pars. 0111,0127,0132]; after the standing by: connecting a main relay (first main relay 43); and opening the ACV (Lee teaches connecting first main relay 43 and opening air cut-off valve ACV) [pars. 0124,0139; Table 1]; turning on the air compressor configured to supply air to a cathode (Lee operates air compressor ACP to supply air to the cathode) [pars. 0124,0139; Table 1]; and performing a startup purge (Lee opens purge valve FPV for a predetermined time to discharge anode post-reaction gas) [pars. 0056-59,0067]. Regarding Claim 11, Modified Lee in view of Reiser discloses the method of Claim 1, wherein the basic COD control is configured to cause: standing by until one or more of: a voltage of the fuel cell stack becomes less than a drop completion reference voltage; or a reference time elapses (Lee waits until stack output terminal voltage drops below a predetermined voltage) [pars. 0124,0132; Table 1]; after the standing by, turning off the resistive electrical load (Lee opens COD relay 64/65 to disconnect CHT 63) [pars. 0124,0132,0134; Table 1]; connecting a main relay (first main relay 43) (Lee closes first main relay 43) [pars. 0124,0139; Table 1]; performing a startup purge (Lee opens purge valve FPV) [pars. 0056-59,0067]; and opening the ACV (Lee opens air cut-off valve ACV) [pars. 0124,0139; Table 1]. Regarding Claim 12, Modified Lee in view of Reiser discloses the method of Claim 1, further comprising: based on determining that the execution of the startup COD is not necessary, connecting a main relay without performing the startup COD, performing a startup purge, and opening the ACV (Lee teaches entering power generation by connecting the main relay 43, opening ACV, and performing purge without operating the COD relays when stack voltage is already stabilized) [pars. 0056-59,0124,0139-45; Tables 1,2]. Regarding Claim 14, Modified Lee in view of Reiser discloses the method of Claim 1, wherein the resistive electrical load is turned on (CHT 63 connected via COD relay 64) [pars. 0089-94,0130] and a designated COD purge is performed (purge valve FPV opened during oxygen removal/depletion) [pars. 0055-59,0067]. Regarding Claim 15, Lee discloses a control apparatus of a fuel cell system [pars. 0041-53,0083-96; Figs. 1,6,7] comprising: a fuel cell stack (fuel cell stack 10) [par. 0043; Fig. 1]; an air control valve (ACV) configured to control air supplied to a cathode of the fuel cell stack (air cut-off valve ACV) [pars. 0041,0061; Fig. 1]; an air compressor configured to supply air to the ACV (air compressor ACP) [pars. 0051-52; Fig. 1]; a resistive electrical load installed to be electrically connected to the fuel cell stack (coolant heater CHT 63 comprising embedded COD resistor) [pars. 0052,0089-90; Fig. 1]; and a controller (controller 60) [par. 0070; Fig. 1] configured to: initiate hydrogen supply to an anode of the fuel cell stack (controller 60 opens FSV) [pars. 0054,0139; Table 1]; drive the air compressor based on an opening degree of the ACV to supply bypass air (controller 60 drives ACP while ACV is shut off) [pars. 0061,0124; Table 1]; initiate execution of startup cathode oxidation depletion (COD) (controller 60 closes COD relay 64) [pars. 0089-94,0130; Table 1]; select a startup control comprising one or more of basic COD control, protection-focused control focused on protection of the fuel cell system, or quickness-focused control focused on quick startup, wherein the selecting is based on an operating point, comprising an operating current and an operating voltage, in a current-voltage plane of a COD circuit comprising the fuel cell stack connected to the resistive electrical load; and perform the selected startup control (controller 60 monitors voltage/current and manages load depletion routines) [pars. 0103-04,0118-21,0135; Fig. 1]. Lee does not explicitly disclose that the controller selects the startup control based on an integral value Q of current supplied specifically to the resistive electrical load. However, Reiser, from the same field of endeavor, discloses integrating current (Q) through an auxiliary resistive load connected across a fuel cell stack to monitor cumulative charge for controlling stack depletion [pars. 0013,0025,0028-32]. Therefore, before the effective filing date of the claimed invention, it would have been obvious for an ordinary skilled artisan to program controller 60 of Lee to calculate the integral value Q through the COD resistor as taught by Reiser in order to establish an objective quantitative metric for oxygen depletion and system control. Regarding Claim 16, Modified Lee in view of Reiser discloses the apparatus of Claim 15, wherein the operating point is from one of a plurality of operating areas defined by current-voltage lines of the stack and resistive load [pars. 0103-04,0118-21], a plurality of reference Q values is assigned to the operating areas [pars. 0028-32], and the controller selects the control based on an operating area and assigned reference Q value [par. 0118]. Regarding Claim 19, Modified Lee in view of Reiser discloses the apparatus of Claim 15, wherein the controller performs protection-focused control by causing: turning off the resistive electrical load and the air compressor [pars. 0061,0124,0132; Table 1], standing by until voltage becomes less than a designated drop completion reference voltage or reference time elapses [pars. 0111,0127,0132], after standing by: connecting a main relay and opening the ACV [pars. 0124,0139; Table 1], turning on the air compressor to supply air to the cathode [pars. 0124,0139; Table 1], and performing a startup purge [pars. 0056-59,0067]. Claims 3, 4, 13, and 17 are rejected under 35 U.S.C. 103 as being unpatentable over Lee (US20210175527A1) and Reiser (US20110200901A1), as applied to claims 1, 2 or 16, respectively, and further in view of Hoshi (US20160240904A1). Regarding Claims 3, 4, and 17, Modified Lee in view of Reiser discloses dividing the operating plane into operating areas based on stack and load current-voltage characteristics. Lee and Reiser do not explicitly disclose defining operating boundaries via BOL (beginning of life) with a first margin, EOL (end of life) with a second margin, a normal COD execution line, and allowable maximum output, maximum resistance, and minimum resistance lines of the resistive load. However, Hoshi, from the same field of endeavor, discloses fuel cell startup and warming-up control [pars. 0004-08,0077-84; Figs. 1,2] wherein the controller stores and calculates fuel cell stack current-voltage output characteristics and minimum cell voltage boundaries [pars. 0098,0114,0123; Figs. 2,9]. Hoshi explicitly teaches comparing real-time operating points against predetermined upper and lower performance requirement lines and minimum allowable cell voltage threshold lines [pars. 0140-50,0160-70,0201-11; Figs. 4,6,9], and evaluating the operating points against maximum and minimum allowable output and resistance boundaries of the auxiliary machines (compressor and heater) [pars. 0174-82,0228-34,0241-48; Figs. 5,7,8]. Therefore, before the effective filing date of the claimed invention, it would have been obvious for an ordinary skilled artisan to define the boundary lines of Lee using BOL/EOL stack margins and allowable load operational limits as taught by Hoshi in order to ensure that the fuel cell stack is operated within verified durability margins across its operating life while preventing electrical overloading of the auxiliary heater. Regarding Claim 13, Modified Lee, Reiser, and Hoshi disclose initial ACV inspection and startup COD control. Lee does not explicitly disclose the alternative branch wherein, based on the opening degree of the ACV exceeding the reference opening degree, the controller opens the ACV, initiates execution of the startup COD, stands by until voltage drops below the drop reference or reference time elapses, turns off the resistive load, connects the main relay, drives the air compressor, and performs startup purge. However, Hoshi, from the same field of endeavor, discloses that when an auxiliary actuator or valve is detected to be in an abnormal or open state upon startup, the controller modifies startup sequencing by actively executing warming-up/depletion while driving auxiliary compressors and purging to prevent stack deterioration [pars. 0103-07,0114-21,0160-64; Figs. 3,4]. In Lee, the ACV is normally commanded to open once startup proceeds [pars. 0061,0124]. Therefore, before the effective filing date of the claimed invention, it would have been obvious for an ordinary skilled artisan to modify the effective filing date of the claimed invention, it would have been obvious for an ordinary skilled artisan to configure the controller of Lee to execute the alternative branch of Claim 13 when the ACV fails to seat properly in order to avoid wasting time attempting to provide bypass air through a malfunctioning valve and to accelerate fuel cell startup safely. Allowable Subject Matter Claims 5-8, 10, 18 and 20 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. These claims would be allowable if rewritten to overcome the rejection(s) under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), 2nd paragraph, set forth in this Office action and to include all of the limitations of the base claim and any intervening claims. The following is an examiner’s statement of reasons for allowance. Claims 5 and 18 recite that the plurality of reference Q values comprises Q1, Q2, Q3, Q4, and Q5, wherein Q1 < Q2 < Q3 < Q4 < Q5, and Q5 is inversely proportional to the operating voltage. The prior art of record, alone or in combination, fails to teach or suggest an accumulating electrical charge threshold Q that is dynamically scaled in inverse proportion to stack operating voltage during cathode oxygen depletion. While Reiser teaches integrating coulombs to fixed volumetric end-points [pars. 0028-32], and Hoshi discloses static current-voltage power requirement curves [Figs. 4,6], the prior art does not teach varying a charge threshold based on operating voltage to improve diagnostic discrimination along an ambiguous COD confirmation boundary line (LN3). Claim 7 recites selecting the startup control based on a specific tripartite partition of the current-voltage plane bounded by: a first area below and bounded by the normal COD confirmation line of the fuel cell stack (LN3), selecting basic COD control; a second area bounded by the normal COD line (LN3), the allowable maximum resistance line of the resistive load (LN5), and the stack EOL minus decision margin line (LN2), selecting quickness-focused control; and a third area outside the first and second areas, selecting protection-focused control. The prior art fails to teach or suggest this multi-variable geometric boundary coordination combining stack aging lines (LN2), normal depletion thresholds (LN3), and load resistance limits (LN5) to route real-time startup execution between basic, expedited, and protective modes. Claims 10 and 20 recite an operational sequence specifically configured to: turn off the air compressor; stand by until stack voltage becomes less than a drop completion reference voltage or reference time elapses; after the standing by, turn off the resistive electrical load; connect the main relay and open the ACV; turn on the air compressor to supply air to the cathode; and perform a startup purge. The prior art fails to teach or suggest turning off the reactant air supply while maintaining the resistive depletion load in an active ON state during the standby wait period specifically to accelerate bleeding stack voltage down below the contactor closure threshold before turning off the load. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to HAROON S SHEIKH whose telephone number is (571)270-0302. The examiner can normally be reached 9-6. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, JONATHAN LEONG can be reached at (571) 270-1292. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. HAROON S. SHEIKH Primary Examiner Art Unit 1751 /Haroon S. Sheikh/ Primary Examiner, Art Unit 1751
Read full office action

Prosecution Timeline

Aug 21, 2024
Application Filed
Nov 04, 2026
Non-Final Rejection mailed — §103, §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12803089
Pouch Case and the Method of Manufacturing the Pouch Type Secondary Battery Including the Same
5y 9m to grant Granted Nov 17, 2026
Patent 12794063
BATTERY MODULE AND BATTERY PACK INCLUDING THE SAME
3y 4m to grant Granted Nov 10, 2026
Patent 12785124
Method Of Operating A Fuel Cell System With Carbon Dioxide Recovery And Associated Installation
4y 3m to grant Granted Nov 03, 2026
Patent 12785210
BATTERY PACK AND VEHICLE INCLUDING THE SAME
2y 0m to grant Granted Nov 03, 2026
Patent 12776497
APPARATUS FOR FABRICATING MEMBRANE-ELECTRODE-SUBGASKET ASSEMBLYAND METHOD FOR FABRICATING MEMBRANE-ELECTRODE-SUBGASKET ASSEMBLY USING THE SAME
2y 9m to grant Granted Oct 27, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
71%
Grant Probability
89%
With Interview (+18.0%)
3y 0m (~9m remaining)
Median Time to Grant
Low
PTA Risk
Based on 466 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month