Prosecution Insights
Last updated: November 20, 2026
Application No. 18/824,874

ELECTRICAL POWER CONTROL DEVICES AND RELATED METHODS

Non-Final OA §102§103
Filed
Sep 04, 2024
Examiner
LAM, ALEX W
Art Unit
2836
Tech Center
2800 — Semiconductors & Electrical Systems
Assignee
ABB Schweiz AG
OA Round
1 (Non-Final)
92%
Grant Probability
Favorable
1-2
OA Rounds
0m
Est. Remaining
94%
With Interview

Examiner Intelligence

Grants 92% — above average
92%
Career Allowance Rate
271 granted / 295 resolved
+23.9% vs TC avg
Minimal +2% lift
Without
With
+2.2%
Interview Lift
resolved cases with interview
Fast prosecutor
1y 11m
Avg Prosecution
18 currently pending
Career history
320
Total Applications
across all art units

Statute-Specific Performance

§101
0.9%
-39.1% vs TC avg
§103
45.7%
+5.7% vs TC avg
§102
38.5%
-1.5% vs TC avg
§112
10.8%
-29.2% vs TC avg
Black line = Tech Center average estimate • Based on career data from 295 resolved cases

Office Action

§102 §103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Election/Restrictions Applicant’s election without traverse of claims 1-12, 18 in the reply filed on 08/24/2026 is acknowledged. Claim Objections Claim 11 is objected to because of the following informalities: In regards to claim 11, line 1, the recitation “The device of claim 11” should be read as “The device of claim 10”. Appropriate correction is required. Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claims 1-9, 18 are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Schroeder et al. (US 2021/0276442 A1). In regards to claim 1, Schroeder discloses, in figure 9, an electrical power control device (115) (Par 0049-0050), comprising: a main relay (920) coupled to an input power connection (output power connection of 105 via 110) (Par 0081-0082); a main power connection (power connection of main service panel 120) for transmitting electrical power from the main relay (920) to a disconnect panel (120) (Par 0081-0082); an auxiliary power connection (power connection of power interface 340 via adaptor interface 335 to electric vehicle charger interface 150) for transmitting electrical power from the main relay (920) to an auxiliary device (Fig. 2; electric vehicle 155) that can function as a current load or a current source (Par 0055, 0082); an auxiliary relay (Fig. 8; 715) coupled to the auxiliary power connection (Par 0074); and a data collection and control module (910) coupled to the main relay (920) and the auxiliary relay (Fig. 8; 715) (Par 0051, 0068, 0083), wherein the data collection and control module (910) is configured to selectively open and close the main relay (920) and to selectively open and close the auxiliary relay (Fig. 8; 715) depending on whether the auxiliary device (Fig. 2; electric vehicle 155) functions as a current load or a current source (Par 0085, 0082-0083; “monitoring and control circuit 910 measures current sensors 900 and voltage sensors 930 to provide input into the control logic for operation of islanding relay 920 and information for auxiliary functions such as, but not limited to, controlling the power output of the EV backup source 155” thus monitoring and control circuit 910 selectively open and close relays 920 and 715 when EV backup source 155 functions as a current load or a current source). In regards to claim 2, Schroeder discloses, in figure 9, the device of claim 1, wherein the data collection and control module (910) is further configured to open or maintain open the main relay (920) and close or maintain closed the auxiliary relay (Fig. 8; 715) when the auxiliary device (Fig. 2; electric vehicle 155) functions as a current source (Par 0053; “Islanding meter socket adaptor 115 may be configured to inform the electrical vehicle charger interface 150 that the islanding relay contacts are open by sending a signal over the control interface 145. Accordingly, electrical vehicle charger interface 150 may enable the grid forming power 740 supply by switching the grid forming switch 715 to the electric vehicle grid forming interface 740 position to energize the power connection and pick up the service panel loads 125” thus electric vehicle 155 functions as a current source). In regards to claim 3, Schroeder discloses, in figure 9, the device of claim 1, wherein the data collection and control module (910) is further configured to close or maintain closed the main relay (920) (Par 0093; “the islanding relay contacts are shut 1165 and the service panel 120 is powered from the Utility service 100”) and close or maintain closed the auxiliary relay (Fig. 8; 715) when the auxiliary device (Fig. 2; electric vehicle 155) functions as a current load (Par 0074; “Based on data regarding grid power status received via adaptor interface 115, electric vehicle charger interface 150 may operate internal grid forming switch 715 to charge electric vehicle 155” thus electric vehicle 155 functions as a current load). In regards to claim 4, Schroeder discloses, in figures 19A-19B, the device of claim 1, further comprising an input disconnect coupled to the input power connection (Par 0117; “FIGS. 19A and 19B depict the adaptor with a disconnect and circuit protection devices in the adaptor 1900, 1910. This enables the system to be deployed without a separate fusible disconnect thus reducing the number of components needed to install at the site.”). In regards to claim 5, Schroeder discloses, in figure 7, the device of claim 1, further comprising an auxiliary disconnect (fused disconnect switch 705) coupled to the auxiliary power connection (Par 0073-0075). In regards to claim 6, Schroeder discloses, in figure 2, the device of claim 1, wherein the auxiliary device (electric vehicle 155) comprises at least one of: an electric vehicle charging station; an electric vehicle (electric vehicle 155; Par 0050); a battery; or a generator. In regards to claim 7, Schroeder discloses, in figure 3, the device of claim 1, wherein: the auxiliary power connection (power connection of power interface 340 via adaptor interface 335 to electric vehicle charger interface 150) comprises one or more hot lines (Line 1, Line 2); and the auxiliary relay (Fig. 8; 715) is coupled to a hot line of the one or more hot lines of the auxiliary power connection (Par 0058; “Adaptor interface 335 houses the mating connectors for the power and control interfaces which may be electrically connected to socket adaptor collar 305, via power interface 340, which may have plug type connectors for, e.g., AC power Line 1 (315), Line 2 (325), and Neutral (320)” thus grid forming switch 715 is coupled to hot lines 1 and 2 via adaptor interface 335). In regards to claim 8, Schroeder discloses, in figure 9, the device of claim 1, wherein the data collection and control module (910) is further configured to close or maintained closed the auxiliary relay (Fig. 8; 715) and open or maintain open the main relay (920) when an outage from the input power connection (output power connection of 105 via 110) occurs and power to the input power connection is halted (Par 0053, 0092). In regards to claim 9, Schroeder discloses, in figure 9, the device of claim 8, wherein the data collection and control module (910) is further configured open the auxiliary relay (Fig. 8; 715) and close the main relay (920) when the outage is resolved and power to the input power connection (output power connection of 105 via 110) is restored (Par 0093). In regards to claim 18, Schroeder discloses, in figure 9, a method of forming an electrical power control device (115), the method comprising: coupling a main relay (920) to an input power connection (output power connection of 105 via 110) (Par 0081-0082); coupling a main power connection (power connection of main service panel 120) to the main relay (920) for electrically connecting to a disconnect panel (120) (Par 0081-0082); coupling an auxiliary power connection (power connection of power interface 340 via adaptor interface 335 to electric vehicle charger interface 150) to the main relay (920) for electrically connecting to an auxiliary device (Fig. 2; electric vehicle 155) (Par 0055, 0082); coupling an auxiliary relay (Fig. 8; 715) to the auxiliary power connection (Par 0074); and coupling a data collection and control module (910) to the main relay (920) and to the auxiliary relay (Fig. 8; 715) (Par 0051, 0068, 0083) such that the data collection and control module (910) is configured to selectively open and close the main relay (920) and to selectively open and close the auxiliary relay (Fig. 8; 715) depending on whether the auxiliary device (Fig. 2; electric vehicle 155) functions as a current load or a current source (Par 0085, 0082-0083; “monitoring and control circuit 910 measures current sensors 900 and voltage sensors 930 to provide input into the control logic for operation of islanding relay 920 and information for auxiliary functions such as, but not limited to, controlling the power output of the EV backup source 155” thus monitoring and control circuit 910 selectively open and close relays 920 and 715 when EV backup source 155 functions as a current load or a current source). Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claims 10-12 are rejected under 35 U.S.C. 103 as being unpatentable over Schroeder et al. (US 2021/0276442 A1) in view of Martin et al. (US 2008/0116906 A1). In regards to claim 10, Schroeder discloses the device of claim 1, but does not disclose further comprising a housing containing the main relay, auxiliary relay, and data collection and control module. However, Martin discloses, in figure 1, a housing (112) containing the main relay (120a), auxiliary relay (120b) (Par 0017), and data collection and control module (logical control portion 120c) (Par 0025-0026). Thus, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified Schroeder’s islanding meter socket adaptor by including a housing as taught by Martin in order to protect the components of the meter from environmental conditions, thereby allowing the meter to be placed outside, in an industrial setting, or elsewhere (Martin; Par 0018). In regards to claim 11, Schroeder and Martin disclose the device of claim 10. Schroeder further discloses, in figure 9, wherein the housing (112 as discussed in Martin) is separate from a meter socket (110) (meter socket 110 is separate from the housing 112 of Martin when combined). In regards to claim 12, Schroeder and Martin disclose the device of claim 11. Martin further discloses, in figure 1, wherein the housing (112) further contains a power meter (132) (Par 0037). Thus, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to have modified Schroeder’s islanding meter socket adaptor by including wherein the housing further contains a power meter as taught by Martin in order to protect the components of the meter from environmental conditions, thereby allowing the meter to be placed outside, in an industrial setting, or elsewhere (Martin; Par 0018). Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Mo et al. (US 12,594,852 B2); discloses A bidirectional energy transfer system includes a cordset of a bidirectional energy transfer system that transfers power from a device to at least one battery array within a traction battery of an electrified vehicle when the cordset is operating under a first condition, and that transfers power from the at least one battery array to the device when the cordset is operating under a second condition. The cordset can include relays powered by the at least one battery array when the cordset is operating under the second condition. Evans et al. (US 12,355,299 B2) discloses isolating a circuit breaker panel for a building from a grid circuit during an event disrupting the grid circuit. In one aspect, an interrupt switch system comprises a housing configured to mate with an electric meter socket on a first side and an electric meter on a second side, the housing comprising power inputs from grid power and power outputs to a circuit breaker panel and an interrupt circuit disposed within the housing and configured to interrupt a flow of electricity from the power inputs to the power outputs. Schroeder et al. (US 2023/0148230 A1); discloses a meter collar adapter including a housing, a plurality of contacts to electrically connect the meter collar adapter to a meter socket and to a utility meter, a load management device within the housing to manage electrical load to an interface circuit with external, co-located electric equipment, and an overcurrent protection device electrically connected in series with an interface circuit. The load management device includes the interface circuit to electrically connect to either the line side or load side of an electrical service via the utility meter an external, co-located electric equipment. An interface contact to electrically connect the co-located electric equipment to the interface circuit, an adjustable electrical switch electrically configured to control electric load, and an energy management unit to control, monitor, and/or report a position of the adjustable electrical switch to manage the electrical loads. Any inquiry concerning this communication or earlier communications from the examiner should be directed to ALEX WONG LAM whose telephone number is (571)272-3409. The examiner can normally be reached Mon-Fri 7:30-5:00. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Regis Betsch can be reached at (571)-270-7101. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /ALEX W LAM/ Examiner, Art Unit 2836
Read full office action

Prosecution Timeline

Sep 04, 2024
Application Filed
Oct 13, 2026
Non-Final Rejection mailed — §102, §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12803290
Feedforward Dynamic Multifunctional Structure with Distributed Energy Storage System
1y 4m to grant Granted Nov 17, 2026
Patent 12773927
POWER SUPPLY AND DISTRIBUTION SYSTEM FOR AN ELECTRIC VEHICLE AND A METHOD FOR CONTROLLING THE SYSTEM
1y 11m to grant Granted Oct 27, 2026
Patent 12756223
UNINTERRUPTIBLE POWER SYSTEM, AND POWER SUPPLY METHOD AND POWER SUPPLY SYSTEM THEREOF
1y 4m to grant Granted Oct 06, 2026
Patent 12746824
Power Supply Network, Electric Vehicle, and Power Conversion Device
1y 7m to grant Granted Sep 29, 2026
Patent 12735183
POWER MANAGEMENT OF AIRCRAFT SEAT POWER USING A SMART POWER DISTRIBUTION CONNECTOR
4y 5m to grant Granted Sep 15, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
92%
Grant Probability
94%
With Interview (+2.2%)
1y 11m (~0m remaining)
Median Time to Grant
Low
PTA Risk
Based on 295 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month