Prosecution Insights
Last updated: October 04, 2026
Application No. 18/840,067

FLUID PRESSURE CIRCUIT

Non-Final OA §102§103§112
Filed
Aug 20, 2024
Priority
Feb 24, 2022 — JP 2022-027084 +1 more
Examiner
GARDNER, NICOLE
Art Unit
3753
Tech Center
3700 — Mechanical Engineering & Manufacturing
Assignee
Eagle Industry Co., Ltd.
OA Round
1 (Non-Final)
69%
Grant Probability
Favorable
1-2
OA Rounds
5m
Est. Remaining
84%
With Interview

Examiner Intelligence

Grants 69% — above average
69%
Career Allowance Rate
336 granted / 486 resolved
-0.9% vs TC avg
Moderate +14% lift
Without
With
+14.5%
Interview Lift
resolved cases with interview
Typical timeline
2y 6m
Avg Prosecution
49 currently pending
Career history
544
Total Applications
across all art units

Statute-Specific Performance

§101
0.3%
-39.7% vs TC avg
§103
50.1%
+10.1% vs TC avg
§102
22.3%
-17.7% vs TC avg
§112
25.1%
-14.9% vs TC avg
Black line = Tech Center average estimate • Based on career data from 486 resolved cases

Office Action

§102 §103 §112
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. Priority Receipt is acknowledged of certified copies of papers required by 37 CFR 1.55. Information Disclosure Statement The information disclosure statements (IDS) submitted on 28 Oct 2024, 27 May 2025, 10 Oct 2025, 9 Feb 2026, 13 Feb 2026, 24 July 2026 were filed in compliance with the provisions of 37 CFR 1.97. Accordingly, the information disclosure statements are being considered by the examiner. Specification The lengthy specification has not been checked to the extent necessary to determine the presence of all possible minor errors. Applicant’s cooperation is requested in correcting any errors of which applicant may become aware in the specification. Claim Objections Claim 4 is objected to because of the following informalities: In Claim 4, line 4 “flow diverted valve” should likely read “flow diverter valve”. In Claim 4, line 6 “flow diverted valve” should likely read “flow diverter valve”. Appropriate correction is required. Claim Rejections - 35 USC § 112 The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. Claims 4 and 8 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. Claim 4 recites the limitation "the housing" in line 2. There is insufficient antecedent basis for this limitation in the claim. Claims not specifically referenced are rejected as being dependent on a rejected base claim. Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claim(s) 1-2, 4-6 and 8 is/are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Caterpillar Mitsubishi Ltd (JP200289511; hereinafter “Caterpillar”; Reference and English Machine Translation provided by Applicant on the IDS dated 28 Oct 2024). Regarding Claim 1, Caterpillar discloses a fluid pressure circuit (Figure 1 generally; ¶ 1), The circuit comprising: a fluid supply source (39); an actuator device (the body side actuators disclosed in ¶ 19) actuated by a fluid from the fluid supply source (from 39 via pumps 32 and 33; Figure 1); a switching valve (41; Figure 1; which switches between providing fluid to the hydraulic motor for the left traveling of the machine body, to the swing hydraulic motor, the coom hydraulic cylinder, the arm hydraulic cylinder and the bucket hydraulic cylinder as needed and disclosed in ¶ 20-21); provided between the fluid supply source (39) and the actuator device (¶ 19) to switch flow passages (Figure 1); and a flow diverter valve (43 generally of the pressure compensation type flow dividing valve 38) configured to divert at least some of the fluid (¶ 24; with the main passage to circuit 35 and diverted passage to circuit 37), which flows from the fluid supply source (39) to a main flow passage (via circuit 35) included in the flow passages and connected to the switching valve (Figure 1 with the switching valve 41), to a diverted flow passage (to circuit 37), wherein the flow diverter valve (43 generally of the pressure compensation type flow dividing valve 38) is provided with a pressure compensation valve (44 of the pressure compensation type flow dividing valve 38) configured to variably adjust an opening degree of the diverted flow passage according to a differential pressure between the main flow passage and the diverted flow passage to compensate for a flow rate to the diverted flow passage (¶ 23; via maintaining a pressure differential between the B1 port and the A1 port). Regarding Claim 2, Caterpillar discloses where the pressure compensation valve (44 of the pressure compensation type flow dividing valve 38) is a pilot valve operated by a pilot pressure of the main flow passage and the diverted flow passage (Figure 1 with the pilot pressure of the main flow passage to 35 from port B1 operating the right side of valve 44 and the pilot pressure of the diverted fluid passage to 37 from port A1 operating the left side of the valve 44). Regarding Claim 4, Caterpillar disclose where the flow diverter valve (43) includes the housing (the flow diverter valve (43 generally) and the pressure compensation valve (44) physically exist within the hydraulic system for the excavator as disclosed by Caterpillar (¶ 14) and therefore inherently the flow diverter valve and the pressure compensation valve have a housing for each of the flow diverter valve and the pressure compensation valve. Therefore, Caterpillar inherently discloses a housing of the flow diverter valve and a housing of the pressure compensation valve) provided with a first communication passage (from P1 to B1 via 51; Figure 1) communicating a flow passage between the fluid supply source (39 to P1) and the flow diverted valve to the main flow passage (via B1 to 44) via the pressure compensation valve (44), and a second communication passage (from P1 via 51 to A1) communicating the flow passage between the fluid supply source (from 39) and the flow diverted valve to the diverted flow passage (to A1 to 44) via the pressure compensation valve (44), and a valve body (the spool of 43) configured to adjust an opening degree of the second communication passage (¶ 23; via maintaining a pressure differential between the B1 port and the A1 port). Regarding Claims 5-6 and 8, Caterpillar disclose where an auxiliary machine (such as a hydraulic breaker or crusher; ¶ 22) actuated by the fluid flowing through the diverted flow passage is provided in the diverted flow passage (via circuit 37; Figure 1). Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claim(s) 3 and 7 is/are rejected under 35 U.S.C. 103 as being unpatentable as obvious over Caterpillar Mitsubishi Ltd (JP200289511; hereinafter “Caterpillar”; Reference and English Machine Translation provided by Applicant on the IDS dated 28 Oct 2024). Regarding Claim 3, Caterpillar disclose all essential elements of the current invention as discussed above but fails to expressly disclose wherein a housing of the flow diverter valve and a housing of the pressure compensation valve are integrally formed. The flow diverter valve (43 generally) and the pressure compensation valve (44) physically exist within the hydraulic system for the excavator as disclosed by Caterpillar (¶ 14) and therefore inherently the flow diverter valve and the pressure compensation valve have a housing for each of the flow diverter valve and the pressure compensation valve. Therefore, Caterpillar inherently discloses a housing of the flow diverter valve and a housing of the pressure compensation valve. While Caterpillar discloses the flow diverter valve (43 generally) and the pressure compensation valve (44) provided in the pressure compensation flow dividing valve 38, Caterpillar fails to expressly disclose wherein a housing of the flow diverter valve and a housing of the pressure compensation valve are integrally formed. It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to modify the housing of the flow diverter valve and the housing of the pressure compensation valve to be integral since it has been held that forming in one piece an article which has formerly been formed in two pieces and put together involves only routine skill in the art. The motivation for doing so would be to reduce manufacturing material waste or decrease assembly time by decreasing the number of discrete elements. Regarding Claim 7, Caterpillar disclose where an auxiliary machine (such as a hydraulic breaker or crusher; ¶ 22) actuated by the fluid flowing through the diverted flow passage is provided in the diverted flow passage (via circuit 37; Figure 1). Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to NICOLE GARDNER whose telephone number is (571)270-0144. The examiner can normally be reached Monday - Friday 8AM-4PM EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisors, KENNETH RINEHART (571-272-4881) or CRAIG SCHNEIDER (571-272-3607) can be reached by telephone. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /NICOLE GARDNER/ Examiner, Art Unit 3753
Read full office action

Prosecution Timeline

Aug 20, 2024
Application Filed
Aug 10, 2026
Non-Final Rejection mailed — §102, §103, §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12723659
Valve Assembly, Pressure Vessel System, Vehicle, and Method for Discharging Fuel
2y 3m to grant Granted Sep 01, 2026
Patent 12717357
WATER LEVEL MANAGEMENT SYSTEM
2y 7m to grant Granted Aug 25, 2026
Patent 12716554
MOUNTING SYSTEM FOR PRESSURE VESSELS
2y 10m to grant Granted Aug 25, 2026
Patent 12715262
REFRIGERANT VALVE MODULE FOR A VEHICLE
2y 4m to grant Granted Aug 25, 2026
Patent 12704192
FLUID END USING CARTRIDGE CHECK VALVE AND WEDGE RETENTION SYSTEM
5y 2m to grant Granted Aug 11, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
69%
Grant Probability
84%
With Interview (+14.5%)
2y 6m (~5m remaining)
Median Time to Grant
Low
PTA Risk
Based on 486 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month