Prosecution Insights
Last updated: November 22, 2026
Application No. 18/840,257

NUCLEAR POWER GENERATION SYSTEM AND NUCLEAR POWER GENERATION METHOD

Non-Final OA §102§103§112
Filed
Aug 21, 2024
Priority
Feb 25, 2022 — JP 2022-028117 +1 more
Examiner
COOPERRIDER, KELLY MARIE
Art Unit
3646
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Mitsubishi Heavy Industries Ltd.
OA Round
1 (Non-Final)
Grant Probability
Favorable
1-2
OA Rounds

Examiner Intelligence

Grants only 0% of cases
0%
Career Allowance Rate
0 granted / 0 resolved
-52.0% vs TC avg
Minimal +0% lift
Without
With
+0.0%
Interview Lift
resolved cases with interview
Typical timeline
Avg Prosecution
19 currently pending
Career history
14
Total Applications
across all art units
This examiner has no resolved cases yet (career too new); statute-level performance unavailable. The Grant Probability card shows Tech Center averages instead.

Office Action

§102 §103 §112
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Election/Restrictions Applicant’s election without traverse of Group IA, species a, and species i in the reply filed on 07/15/2026 is acknowledged. Status of Claims Claims 1-11 are pending in this application. Claims 4-6 and 9-11 are withdrawn. Claims 1-3 and 7-8 are examined herein. Specification The title of the invention is not descriptive. A new title is required that is clearly indicative of the invention to which the claims are directed. Drawings Figure 1 should be designated by a legend such as --Prior Art-- because only that which is old is illustrated. See MPEP § 608.02(g). Corrected drawings in compliance with 37 CFR 1.121(d) are required in reply to the Office action to avoid abandonment of the application. The replacement sheet(s) should be labeled “Replacement Sheet” in the page header (as per 37 CFR 1.84(c)) so as not to obstruct any portion of the drawing figures. If the changes are not accepted by the examiner, the applicant will be notified and informed of any required corrective action in the next Office action. The objection to the drawings will not be held in abeyance. Priority Receipt is acknowledged of certified copies of papers required by 37 CFR 1.55. Claim Rejections - 35 USC § 112 (b) The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. The following is a quotation of 35 U.S.C. 112 (pre-AIA ), second paragraph: The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the applicant regards as his invention. Claims 1-3, 7, and 8 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. The claims are generally narrative and indefinite, failing to conform with current U.S. practice. They appear to be a literal translation into English from a foreign document and are replete with grammatical and idiomatic errors. The following is a list of unclear language from the claims and the corresponding claim numbers. Each and every claim on the list is rejected for being generally narrative and indefinite, failing to conform with current U.S. practice. Claim 1 recites “a reactor vessel that surrounds to cover”. It is unclear what this means. Claim 1 recites “to shield a space having the core fuel for shielding against ionizing radiation”. It is unclear what is being shielded against radiation and the use of shield and shielding in the same limitation is redundant and unclear. The limitation appears to mean the space having the fuel is shielded to shield the fuel against radiation. redundant Claim 1 recites “the pipe through which refrigerant is passed”. This does not convey any clear meaning. Claim 1 recites “…and that circulates the refrigerant exchanging heat”. The subject of this limitation in claim 1 changes several times, so it is unclear whether the pipe or the refrigerant circuit are the subject of this part of the limitation. Claim 1 recites “the refrigerant exchanging heat with the thermal conductor”. This lacks antecedent basis. The refrigerant exchanging heat with the thermal conductor has only been introduced as “refrigerant” previously. Furthermore, this seems to be intended to be a functional limitation of the “refrigerant” in the “refrigerant circuit” but this is unclear as written and due to the lack of antecedent basis, it is not certain that this “refrigerant exchanging heat with the thermal conductor” is the same “refrigerant” previously introduced. No limitation has positively stated that a refrigerant exchanges heat with the thermal conductors. It is unclear what is meant by “integrally” in the final line of claim 1.This could mean simultaneously or it could imply the generator and turbine are physically connected, which could be an indirect or direct connection. Claim 3 recites “cooling an inner wall of the reactor vessel inside of the reactor vessel”. It is unclear what the subject of this limitation is. What is performing this cooling? Claim 3 recites “…and merged with the refrigerant circuit at a merge point downstream of the branch point”. Again it is unclear what is being merged with the refrigerant circuit. The location of the compressor in the refrigerant circuit introduced in claim 3 is unclear. The phrase “compresses the refrigerant passed through the turbine” seems to be intended to clarify where the compressor is within the circuit, however, “refrigerant passed through the turbine” can mean the refrigerant to be passed through the turbine or the refrigerant already passed through the turbine. It is unclear whether the compressor is upstream of the turbine or downstream. This phrase is ambiguous and it is unclear what the metes and bounds of this limitation are because of its use. See MPEP 2173.02 II. The phrase “a merge point downstream of the branch point” in claim 3 is relative and indefinite. There is nothing in the claims that distinguishes upstream from downstream and no starting point for the circuit has been identified. Any location in the circuit could be considered upstream or downstream and the only determining factor is the observer’s perspective. The metes and bounds of this limitation cannot be determined. The term “true-circular” in claim 7 is a relative term which renders the claim indefinite. The term “true-circular” is not defined by the claim, the specification does not provide a standard for ascertaining the requisite degree, and one of ordinary skill in the art would not be reasonably apprised of the scope of the invention. It is unclear how a true-circular shape differs from a circular shape. Any claim not specifically rejected above is rejected for being dependent upon a rejected claim. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claim 1 is rejected under 35 U.S.C. 102(a)(1) as being anticipated by Kimura et al. (US 20210065921 A1). Regarding claim 1, Kimura discloses a nuclear power generation system (Fig. 1) comprising: a nuclear reactor that includes a core fuel (10), and a reactor vessel (13) that surrounds to cover the core fuel and to shield a space having the core fuel for shielding against ionizing radiation; a thermal conductor (12) that is disposed inside of the reactor vessel, and transfers heat of the core fuel via solid thermal conduction; a refrigerant circuit that includes a pipe with a part inserted in the reactor vessel and another part disposed outside of the reactor vessel (see arrows in fig. 1 going in and out of the reactor vessel), the pipe through which refrigerant is passed, and that circulates the refrigerant exchanging heat with the thermal conductor (via heat exchanger 11); a turbine (6) that is rotated by the refrigerant circulating through the refrigerant circuit: and a generator (5) that is rotated integrally with the turbine([0023]). Claim Rejections - 35 USC § 103 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. The factual inquiries for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. This application currently names joint inventors. In considering patentability of the claims the examiner presumes that the subject matter of the various claims was commonly owned as of the effective filing date of the claimed invention(s) absent any evidence to the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to point out the inventor and effective filing dates of each claim that was not commonly owned as of the effective filing date of the later invention in order for the examiner to consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2) prior art against the later invention. Claim 2, is rejected under 35 U.S.C. 103 as being unpatentable over Kimura et al. (US 20210065921 A1) in view of Andrews et al. (US 3742707 A). Regarding claim 2, Kimura discloses all the elements of the parent claim and a working gas refrigerant ([0023]), but Kimura doesn’t explicitly disclose that the refrigerant is carbon dioxide. Andrews does. Andrews is in the same reactor cooling art area and teaches a system wherein the refrigerant is carbon dioxide (col. 4 lines 10-13). It would have been obvious to one having ordinary skill in the art prior to the effective filing date of the invention to use carbon dioxide as the refrigerant, as taught by Andrews, in Kimura’s cooling system, since it has been held to be within the general skill of a worker in the art to select a known material on the basis of its suitability for the intended use as a matter of obvious design choice. See MPEP 2144.07. In this particular case, the skilled artisan would have known that carbon dioxide and helium, both suggested by Andrews, are well-known and have extremely well-understood chemistry. The skilled artisan would not have been surprised by the outcome of using helium, carbon dioxide, or any other widely available gas as the refrigerant in Kimura’s cooling system. Claims 3, 7, and 8 are rejected under 35 U.S.C. 103 as being unpatentable over Kimura et al. (US 20210065921 A1) in view of Braun et al. (GB 1117736 A). Regarding claim 3, Kimura discloses all the elements of the parent claim, and further discloses a compressor (9) that is disposed in the refrigerant circuit and compresses the refrigerant passed through the turbine (see refrigerant circuit in Fig. 1); However, Kimura does not disclose a system comprising: a cooling mechanism that includes a cooling pipe branched from the refrigerant circuit at a branch point downstream of the compressor and upstream of the thermal conductor, cooling an inner wall of the reactor vessel inside of the reactor vessel, and merged with the refrigerant circuit at a merge point downstream of the branch point. Braun does. Braun is in the same reactor cooling art area and teaches a system (Fig. 1) comprising: a cooling mechanism that includes a cooling pipe (4) branched from a refrigerant circuit (5) at a branch point (see branch off of 10 leading to 11) downstream of a condenser (10) and upstream of the reactor, cooling an inner wall of the reactor vessel (1) inside of the reactor vessel (the cooling pipe 4 is in contact with the vessel wall at the cooling inlet, where the base of 4 penetrates the vessel wall 1, this causes heat transfer from the vessel wall into 4, cooling the vessel wall), and merged with the refrigerant circuit (5) at a merge point (6) downstream of the branch point (see branch off of 10) (see lines 29-74). It would have been obvious to one having ordinary skill in the art prior to the effective filing date of the invention to have included Braun’s secondary cooling branch in Kimura’s reactor and cooling system for the predictable purpose of providing a nuclear power plant comprising a reactor core containing two separate cooling channels, arranged so that the heat generated in the nuclear reactor can be utilized to the best advantage in an associated heat engine (lines 40-46). The combination of Braun’s secondary cooling pipe with Kimura’s thermal conductors within the reactor and Kimura’s refrigeration circuit would satisfy the requirement of a branch point downstream of the compressor and upstream of the thermal conductors. Regarding claim 7, Kimura and Braun teach all the elements of the parent claim, but it is uncertain whether either explicitly claim true-circular pipes. However, it would have been an obvious matter of design choice to use true-circular, polygonal, or elliptical shaped pipes, since such a modification would have involved a mere change in shape of a component. A change in configuration is matter of choice which a person of ordinary skill in the art would have found obvious absent persuasive evidence that the particular configuration of the device is significant. See MPEP 2144.04 IV. B. In this particular case, the skilled artisan would have known that pipes come in a variety of shapes including circular, elliptical, and polygonal, and are readily available for sale. The skilled artisan would not have been surprised by the outcome of using circular, elliptical, polygonal, or any other widely available pipe shape as for the pipes in Kimura’s cooling system. Regarding claim 8, Kimura and Braun teach all the elements of the parent claim, and Braun further teaches wherein the cooling pipe is in contact with the inner wall of the reactor vessel (the second cooling pipe 4 is in contact with the vessel wall at the cooling inlet, where the base of 4 penetrates the vessel wall 1, this causes heat transfer from the vessel wall into 4, cooling the wall). It would have been obvious to one having ordinary skill in the art prior to the effective filing date of the invention that the above mentioned combination would include these limitations. The motivation for the combination would have been for the reasons detailed above. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to KELLY MARIE COOPERRIDER whose telephone number is (571)270-0532. The examiner can normally be reached Monday - Friday 7:30 a.m. - 5 p.m. ET.. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Jack Keith can be reached at 5712726878. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /K.M.C./Examiner, Art Unit 3646 /JACK W KEITH/Supervisory Patent Examiner, Art Unit 3646
Read full office action

Prosecution Timeline

Aug 21, 2024
Application Filed
Oct 21, 2026
Non-Final Rejection mailed — §102, §103, §112 (current)

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
Grant Probability
Low
PTA Risk
Based on 0 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month