Prosecution Insights
Last updated: November 22, 2026
Application No. 18/842,374

DATA TRANSMISSION METHOD, TERMINAL, BASE STATION AND STORAGE MEDIUM

Non-Final OA §102§103§112
Filed
Aug 28, 2024
Priority
Mar 04, 2022 — CN 202210210964.3 +2 more
Examiner
YEA, JI-HAE P
Art Unit
2471
Tech Center
2400 — Computer Networks
Assignee
Datang Mobile Communications Equipment Co., Ltd.
OA Round
1 (Non-Final)
83%
Grant Probability
Favorable
1-2
OA Rounds
1m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 83% — above average
83%
Career Allowance Rate
191 granted / 229 resolved
+25.4% vs TC avg
Strong +18% interview lift
Without
With
+18.3%
Interview Lift
resolved cases with interview
Typical timeline
2y 4m
Avg Prosecution
26 currently pending
Career history
271
Total Applications
across all art units

Statute-Specific Performance

§101
2.3%
-37.7% vs TC avg
§103
53.9%
+13.9% vs TC avg
§102
24.0%
-16.0% vs TC avg
§112
17.6%
-22.4% vs TC avg
Black line = Tech Center average estimate • Based on career data from 229 resolved cases

Office Action

§102 §103 §112
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Priority This application is a 371 of PCT/CN2022/133310 filed on 11/21/2022. Acknowledgment is made of applicant’s claim for foreign priority under 35 U.S.C. 119 (a)-(d). The certified copies have been filed in parent Application No. CHINA 202210210964.3 filed on 3/4/2022 and CHINA 202210400170.3 filed on 4/15/2022. Information Disclosure Statement The information disclosure statements (IDS) were submitted on 8/28/2024, 4/29/2026, and 10/20/2026. The submissions are in compliance with the provisions of 37 CFR 1.97. Accordingly, the information disclosure statements have been considered by the examiner. Claim Objections Claims 2, 5, 7, 10-12, and 33 are objected because of the following informalities: In claim 2, the expression “an frequency division duplex (FDD) band” is grammatically incorrect. It is requested to amend the expression to “a frequency division duplex (FDD) band”. Additionally, “Band Width Part (BWP)” should be corrected to “bandwidth part (BWP)”. In claim 5, the expression “configured for configuring” is unnecessarily repetitive and should be revised for grammatical clarity, for example, to “configured to configure”. In claim 7, the expression “in the plurality of frequency domain resources” is grammatically awkward. Applicant is requested to clarify the expression, for example, by reciting “from among the plurality of frequency resources”. In claim 10, the expression “the DCI is DCI used for” is grammatically awkward and should be revised for grammatical clarity. In claim 11, it is suggested to amend the claim to read as follows for clarity. 11. (Currently Amended) The method according to claim 2, wherein respective portions of frequency domain resources at a lower frequency boundary and an upper frequency boundary of the frequency spectrum resource are served and excluded from the frequency domain resources used for uplink and downlink transmission. In claim 12, the expression “granularity … takes six resource blocks (RBs) as a unit” should be revised to clearly recite that the frequency domain resources have a granularity of six resource blocks. In claim 33, the expressions “preset uplink and downlink resource division manner” and “pre-specified division manner” should be made consistent if they refer to the same resource division manner. Appropriate correction is required. Claim Rejections - 35 USC § 112 The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. Claim 37 is rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor, or for pre-AIA the applicant regards as the invention. Regarding claim 37: Claim 37 recites a limitation “the plurality of frequency domain resources” in line 5. There is insufficient antecedent basis for the limitation in the claim. Additionally, the expression “in the plurality of frequency domain resources” should be revised for grammatical clarity, for example, to “from among the plurality of frequency domain resources”. Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale or otherwise available to the public before the effective filing date of the claimed invention. Claims 1-3, 6-10, 15, 31, 33, 37, and 62 are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Abotabl et al. (US 2021/0307010 A1, hereinafter Abotabl). Regarding claim 1: Abotabl teaches a data transmission method, performed by a terminal (see, Abotabl: Fig. 1, UE 115), and comprising: determining frequency domain resources used for uplink and downlink transmission at the same time unit in the same frequency spectrum resource (see, Abotabl: para. [0103], “a base station 105 may provide an indication of a frequency band configuration for a slot. The indication of the frequency band configuration may indicate at least one downlink frequency band for downlink communications within the slot and at least one uplink frequency band for uplink communications within the slot.” See also para. [0111-0118]); and performing data transmission according to the frequency domain resources (see, Abotabl: para. [0103], “The UE 115 and the base station 105 may communicate, within the slot (or multiple slots), via downlink communications within the downlink frequency band and uplink communications within the uplink frequency band.”; para. [0113], “with reference to wireless communications system 200 of FIG. 2 and frequency band configuration 400 of FIG. 4, UE 215-a may receive downlink transmissions 210-a over downlink frequency bands 415-a and 415-b and transmit uplink data transmissions 220 over uplink frequency band 420.”). Regarding claim 2: As discussed above, Abotabl teaches all limitations in claim 1. Abotabl further teaches wherein the frequency spectrum resource comprises a time division duplex (TDD) band, an frequency division duplex (FDD) band for uplink, an FDD band for downlink, a carrier, a Band Width Part (BWP), or a band for deploying full duplex (see, Abotabl: para. [0110-0114], describing full-duplex frequency configurations involving BWPs, RBs, and resource elements.). Regarding claim 3: As discussed above, Abotabl teaches all limitations in claim 1. Abotabl further teaches wherein determining the frequency domain resources used for uplink and downlink transmission at the same time unit in the same frequency spectrum resource comprises: acquiring the frequency domain resources used for uplink and downlink transmission at the same time unit according to a preset uplink and downlink resource division manner (see, Abotabl: para. [0115-0118], describing predetermined frequency-band configurations and a table identifying frequency boundaries of the uplink and downlink bands.), wherein the frequency domain resources are obtained by dividing the frequency spectrum resource according to the preset uplink and downlink resource division manner (see, Abotabl: para. [0121-0124], describing bitmap-based frequency-band configurations.). Regarding claim 6: As discussed above, Abotabl teaches all limitations in claim 3. Abotabl further teaches wherein the frequency domain resources comprise a plurality of frequency domain resources used for uplink transmission and/or downlink transmission (see, Abotabl: para. [0113-0114], describing downlink frequency bands 415-a and 415-b and uplink frequency band 420 within a full-duplex slot.). Regarding claim 7: As discussed above, Abotabl teaches all limitations in claim 6. Abotabl further teaches wherein determining the frequency domain resources used for uplink and downlink transmission at the same time unit in the same frequency spectrum resource comprises: receiving downlink control information (DCI), the DCI being used for notifying the terminal to use one or more frequency domain resources used for uplink transmission and/or downlink transmission in the plurality of frequency domain resources used for uplink transmission and/or downlink transmission (see, Abotabl: para. [0115-0118]); and determining the one or more frequency domain resources used for uplink transmission and/or downlink transmission according to the DCI (see, Abotabl: para. [0121-0124], describing a UE decoding DCI and determining uplink and downlink frequency-band boundaries.). Regarding claim 8: As discussed above, Abotabl teaches all limitations in claim 7. Abotabl further teaches wherein determining the one or more frequency domain resources used for uplink transmission and/or downlink transmission according to the DCI comprises: determining the one or more frequency domain resources used for uplink transmission and/or downlink transmission through frequency domain resource allocation information of the DCI (see, Abotabl: para. [0122], describing UE decoding of DCI to identify a bitmap; para. [0123-0124], describing bitmap bits corresponding to frequency ranges such as RBs or PRGs and indicating uplink or downlink frequency resources.). Regarding claim 9: As discussed above, Abotabl teaches all limitations in claim 6. Abotabl further teaches wherein there is an association relationship between uplink frequency domain resources and downlink frequency domain resources among the plurality of uplink and downlink frequency domain resources (see, Abotabl: para. [0115-0118] [0134-0136], describing the UL/DL resource association.). Regarding claim 10: As discussed above, Abotabl teaches all limitations in claim 7. Abotabl further teaches wherein the DCI is DCI used for scheduling a PDSCH or a PUSCH, or DCI used for configuring the uplink frequency domain resources and/or downlink frequency domain resources (see, Abotabl: para. [0115-0118] [0121-0124], describing DCI-based frequency-band configuration indications.). Regarding claim 15: As discussed above, Abotabl teaches all limitations in claim 1. Abotabl further teaches wherein the frequency domain resources used for uplink and downlink transmission at the same time unit are valid in a part of time units (see, Abotabl: para. [0138-0143], describing frequency-band configurations applicable to selected full-duplex slots. In particular, para. [0143] describes a first frequency-band configuration applicable to every fourth full-duplex slot and a second frequency-band configuration applicable to intervening full-duplex slots.). Regarding claim 31: Claim 31 is directed towards a terminal (see, Abotabl: Fig. 1, UE 115; Fig. 12, UE 115) for data transmission, comprising a memory (see, Abotabl: Fig. 12, Memory 1230), a transceiver (see, Abotabl: Fig. 12, Transceiver 1220) and a processor (see, Abotabl: Fig. 12, Processor 1240); the memory being configured to store a computer program; the transceiver being configured to receive and send data under control of the processor (see, Abotabl: para. [0145]); and the processor being configured to read the computer program in the memory and execute the operations of the data transmission method of claim 1. Therefore, claim 31 is rejected by applying the similar rationale used to reject claim 1 above. Regarding claim 33: Claim 33 is directed towards the terminal according to claim 31 that is further limited to similar features to claim 3. Therefore, claim 33 is rejected by applying the similar rationale used to reject claim 3 above. Regarding claim 37: Claim 37 is directed towards the terminal according to claim 31 that is further limited to similar features to claim 7. Therefore, claim 37 is rejected by applying the similar rationale used to reject claim 7 above. Regarding claim 62: Claim 62 is directed towards a non-volatile computer readable storage medium (see, Abotabl: Fig. 12, Memory 1230), wherein the computer readable storage medium stores a computer program, and the computer program is configured for causing a processor to execute: the data transmission method of claim 1. Therefore, claim 62 is rejected by applying the similar rationale used to reject claim 1 above. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. This application currently names joint inventors. In considering patentability of the claims the examiner presumes that the subject matter of the various claims was commonly owned as of the effective filing date of the claimed invention(s) absent any evidence to the contrary. Applicant is advised of the obligation under 37 CFR 1.56 to point out the inventor and effective filing dates of each claim that was not commonly owned as of the effective filing date of the later invention in order for the examiner to consider the applicability of 35 U.S.C. 102(b)(2)(C) for any potential 35 U.S.C. 102(a)(2) prior art against the later invention. The factual inquiries set forth in Graham v. John Deere Co., 383 U.S. 1, 148 USPQ 459 (1966), that are applied for establishing a background for determining obviousness under 35 U.S.C. 103 are summarized as follows: 1. Determining the scope and contents of the prior art. 2. Ascertaining the differences between the prior art and the claims at issue. 3. Resolving the level of ordinary skill in the pertinent art. 4. Considering objective evidence present in the application indicating obviousness or nonobviousness. Claims 4, 5, and 34 are rejected under 35 U.S.C. 103 as being unpatentable over Abotabl in view of Abotabl et al. (US 2021/0400637 A1, hereinafter Abotabl-2). Regarding claim 4: As discussed above, Abotabl teaches all limitations in claim 1. Abotabl further teaches that the UE receives RRC signaling identifying slot-format information and control information identifying uplink and downlink frequency-band configurations (see, Abotabl: para. [0117-0118] [0121-0124]). Abotabl additionally discloses receiving RRC signaling indicating adjustments to the boundaries of uplink and downlink frequency bands, including indications of which frequency band to reduce, the amount of reduction, and granularity of frequency ranges represented by bitmap bits (see, Abotabl: para. [0130]). In the same field of endeavor, Abotabl-2 teaches RRC-based configuration and interpretation of slots supporting uplink and downlink operation within a common carrier bandwidth (see, Abotabl-2: Figs. 13-15, describing the downlink-uplink (DU) slot interpretation embodiments. See also para. [0126-0128]). To the extent Abotabl does not expressly disclose that the RRC signaling configures the complete frequency-domain resource arrangement, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to apply the teachings of Abotabl in combination of the teachings of Abotabl-2 to use the known RRC configuration mechanism for communicating the frequency-domain resource configuration to the UE. Such a modification would have allowed the UE to determine uplink and downlink frequency-domain resources from a configured resource arrangement before performing data transmission, using an established higher-layer signaling mechanism. Accordingly, Abotabl in view of Abotabl-2 teaches wherein determining the frequency domain resources used for uplink and downlink transmission at the same time unit in the same frequency spectrum resource comprises: receiving radio resource control (RRC) signaling, the RRC signaling being used for configuring the frequency domain resources used for uplink and downlink transmission at the same time unit in the frequency spectrum resource; and determining the frequency domain resources used for uplink and downlink transmission at the same time unit according to the RRC signaling. Regarding claim 5: As discussed above, Abotabl in view of Abotabl-2 teaches all limitations in claim 4. Abotabl further teaches wherein the RRC signaling is configured for configuring frequency domain resources corresponding to a cell level or a terminal group level or a terminal level (see, Abotabl: para. [0130], describing the RRC configuration for configuration frequency domain resources is, at least, corresponding to a terminal level.). Regarding claim 34: Claim 34 is directed towards the terminal according to claim 31 that is further limited to similar features to claim 4. Therefore, claim 34 is rejected by applying the similar rationale used to reject claim 4 above. Claim 11 is rejected under 35 U.S.C. 103 as being unpatentable over Abotabl in view of Zhang et al. (EP 3836474 A1, hereinafter Zhang). Regarding claim 11: As discussed above, Abotabl teaches all limitations in claim 2. Abotabl does not explicitly teach wherein a part of resources is reserved on two sides of the frequency spectrum resource. In the same field of endeavor, Zhang teaches wherein a part of resources is reserved on two sides of the frequency spectrum resource (see, Zhang: Figs. 3A and 3B, para. [0039-0041] [0047-0049], and claim 2. Zhang discloses that the guard zones are implemented by scheduling no transmissions on selected subcarriers at the carrier-bandwidth edges.). Accordingly, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to apply the teachings of Abotabl in combination of the teachings of Zhang to reserve frequency-domain resources at the lower and upper frequency boundaries of the carrier of bandwidth part used in Abotabl’s full-duplex resource-allocation scheme, as taught by Zhang in order to reduce out-of-band emissions and interference with neighboring frequency allocations, while retaining Abotabl’s internal guard bands for separating simultaneous uplink and downlink transmission. Claims 12 and 13 are rejected under 35 U.S.C. 103 as being unpatentable over Abotabl in view of Wu et al. (WO 2023/131238 A1, hereinafter Wu). Regarding claim 12: As discussed above, Abotabl teaches all limitations in claim 1. Abotabl does not explicitly teach wherein granularity of the frequency domain resources used for uplink/downlink transmission takes six resource blocks (RBs) as a unit. In the same field of endeavor, Wu teaches wherein granularity of the frequency domain resources used for uplink/downlink transmission takes six resource blocks (RBs) as a unit (see, Wu: page 14 (see, page 16 of English Translation), “the frequency domain resources of PDCCH are the RB resources occupied by CORESET; because the protocol defines that in some scenarios, the number of RBs occupied by CORESET is an integer multiple of 6”). Accordingly, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to apply the teachings of Abotabl in combination of the teachings of Wu to achieve the purpose of coexistence with other PDCCH transmissions (see, Wu: page 14 (see, page 16 of English Translation)). Regarding claim 13: As discussed above, Abotabl teaches all limitations in claim 1. Abotabl does not explicitly teach wherein a starting resource block (RB) index of the frequency domain resources used for uplink and/or downlink transmission is an integer multiple of 6. In the same field of endeavor, Wu teaches wherein a starting resource block (RB) index of the frequency domain resources used for uplink and/or downlink transmission is an integer multiple of 6 (see, Wu: page 14 (see, page 16 of English Translation), “the frequency domain resources of PDCCH are the RB resources occupied by CORESET; … the index of the starting RB is also an integer multiple of 6”). Accordingly, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to apply the teachings of Abotabl in combination of the teachings of Wu to achieve the purpose of coexistence with other PDCCH transmissions (see, Wu: page 14 (see, page 16 of English Translation)). Claim 14 is rejected under 35 U.S.C. 103 as being unpatentable over Abotabl in view of Xiao et al. (US 2024/0188060 A1, hereinafter Xiao). Regarding claim 14: As discussed above, Abotabl teaches all limitations in claim 1. Abotabl does not explicitly teach wherein a width of the frequency spectrum resource is greater than or equal to 5 MHz. In the same field of endeavor, Xiao teaches wherein a width of the frequency spectrum resource is greater than or equal to 5 MHz (see, Xiao: para. [0086], “the default bandwidth is greater than or equal to 5 MHz.” Also, see claim 46.). Accordingly, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to apply the teachings of Abotabl in combination of the teachings of Xiao to implement a bandwidth for narrowband communication, wherein the bandwidth is less than or equal to a default bandwidth of 5 MHz or greater (see, Xiao: Abstract and para. [0085-0086]). Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to JI-HAE YEA whose telephone number is (571) 270-3310. The examiner can normally be reached on MON-FRI, 7am-3pm, ET. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, SUJOY K KUNDU can be reached on (571) 272-8586. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see https://ppair-my.uspto.gov/pair/PrivatePair. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /JI-HAE YEA/Primary Examiner, Art Unit 2471
Read full office action

Prosecution Timeline

Aug 28, 2024
Application Filed
Oct 29, 2026
Non-Final Rejection mailed — §102, §103, §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12795469
MULTI-LINK-BASED ROAMING
4y 0m to grant Granted Nov 10, 2026
Patent 12786927
TRACKING AREA ABNORMALITY PROCESSING METHOD AND APPARATUS, COMMUNICATION DEVICE, AND STORAGE MEDIUM
2y 9m to grant Granted Nov 03, 2026
Patent 12757080
SECONDARY CELL GROUP (SCG) DEACTIVATION AT MOBILITY
3y 3m to grant Granted Oct 06, 2026
Patent 12750897
SYSTEM AND METHOD TO DELIVER COMPANION EXPERIENCES TO HANDHELD DEVICES
4y 3m to grant Granted Sep 29, 2026
Patent 12720389
SLICE CONTINUITY IN HANDOVER
2y 11m to grant Granted Aug 25, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
83%
Grant Probability
99%
With Interview (+18.3%)
2y 4m (~1m remaining)
Median Time to Grant
Low
PTA Risk
Based on 229 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month