Prosecution Insights
Last updated: November 24, 2026
Application No. 18/844,669

METHOD AND APPARATUS FOR MONITORING MULTI-PATH END-TO-END DELAY, AND ELECTRONIC DEVICE AND MEDIUM

Non-Final OA §103
Filed
Sep 06, 2024
Priority
Mar 29, 2022 — CN 202210325181.X +1 more
Examiner
BUKHARI, SIBTE H
Art Unit
2449
Tech Center
2400 — Computer Networks
Assignee
ZTE Corporation
OA Round
1 (Non-Final)
79%
Grant Probability
Favorable
1-2
OA Rounds
11m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 79% — above average
79%
Career Allowance Rate
354 granted / 446 resolved
+21.4% vs TC avg
Strong +34% interview lift
Without
With
+33.9%
Interview Lift
resolved cases with interview
Typical timeline
3y 1m
Avg Prosecution
21 currently pending
Career history
474
Total Applications
across all art units

Statute-Specific Performance

§101
9.9%
-30.1% vs TC avg
§103
66.0%
+26.0% vs TC avg
§102
10.4%
-29.6% vs TC avg
§112
9.5%
-30.5% vs TC avg
Black line = Tech Center average estimate • Based on career data from 446 resolved cases

Office Action

§103
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . DETAILED ACTION Status of Claims This action is in response to claims filed on 09/06/2024. Claims 1-7 and 9-18 have been examined and are pending with this action. Claims 1-3, 6-7, 9-12 & 15-16 have been rejected. Claims 4-5, 13-14 and 17-18 are objected. Oath/Declaration The Oath/Declaration filed on 9/6/2024 is accepted by the examiner. Drawing The drawings filed on 9/6/2024 is accepted by the examiner. Information Disclosure Statement The information disclosure statement (IDS) submitted on 9/6/2024 is in compliance with the provisions of 37 CFR 1.97. Accordingly, the information disclosure statement is being considered by the examiner. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102 of this title, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claims 1, 6-7, 9-12 & 15-16 are rejected under 35 U.S.C. 103 as being unpatentable over LIU (CN 107508719 A) in view of Wetterwald Patrick et al (US 20190349392 A1). Regarding claim 1, LIU discloses a method for monitoring end-to-end delays of a plurality of paths (LIU: “ The point of the invention is that in an end to end delay measurement OAM message, carrying all the time information of the forwarding node to realize one-off measurement network per-hop delay & calculating to obtain each link, the delay of each transmitting node and the path delay”), comprising: receiving Operation, Administration, and Maintenance (OAM) packets of a service respectively sent via the plurality of paths, wherein each of the OAM packets carries a sending timestamp of a sending end which sends the OAM packet (LIU: “When the destination node receives the OAM message in the OAM message recording and destination nodes when receiving of all nodes and the timestamp recorded in the OAM message of stamp information calculated for each link, the delay time of each transmitting node and the path delays”); acquiring an end-to-end delay of the OAM packet corresponding to each respective path according to the sending timestamp of the OAM packet corresponding to the respective path and a marked receiving timestamp (LIU: “ delay measuring module: generating the delay measurement OAM message, or terminating the delay measurement OAM message, analyzing message content to obtain each link, the delay time of each transmitting node and the time delay of the whole path.”); and LIU does not explicitly teaches the comparison of OAM packets. Patrick however discloses respectively comparing the end-to-end delay of the OAM packet corresponding to the respective path with a preset end-to-end delay range, to obtain an end-to-end delay monitoring result for the OAM packet corresponding to the respective path (Patrick: [0066]: an OAM packet may be sent along the deterministic path, to capture timestamps at each of the receiving devices, which can then be compared hop-by-hop with a reference. Such an OAM packet may be sent periodically or on demand, in various cases. For example, in FIG. 4A, device 200a may send OAM packet 402 to device 200b, according to the deterministic communication schedule for path 400. In turn, in FIG. 4B, device 200b may timestamp OAM packet 402 and forward it on to device 200c during its own scheduled communication interval.”). Therefore it would have been obvious to a person of ordinary skill in art at time invention was made to modify system of LIU in view of Patirck to figure out comparison of OAM packets. One would be motivated to do so because this technique advantageously aids in performance of a mitigation action in the network (Patrick: ABS). Claims 9 & 10 are rejected based on rationale provided for claim 1 rejection. Regarding claim 6, LIU/Patrick discloses the method for monitoring end-to-end delays of the plurality of paths of claim 1, wherein each OAM packet carries information of all nodes in the path that the OAM packet passes through; and after acquiring the end-to-end delay of the OAM packet corresponding to each respective path (LIU: “ delay measuring module: generating the delay measurement OAM message, or terminating the delay measurement OAM message, analyzing message content to obtain each link, the delay time of each transmitting node and the time delay of the whole path.”), the method further comprises: determining path information of the end-to-end delay according to the information of all nodes carried in each OAM packet (LIU: “ the end-to-end time delay measuring method, because common redundancy protection exists in the network, the forwarding path between two nodes is not completely determined, for example, in FIG. 1, the endpoint X1 to the transmission path X6 may be X1-S1-S4-X6, or may be X1-S1-S2-S4-X6.”), Regarding claim 7, LIU/Patrick discloses the method for monitoring end-to-end delays of the plurality of paths of claim 1, wherein the OAM packet carries a detection type flag, and the detection type flag is used for instructing the receiving end or the controller to acquire the end-to-end delay of the OAM packet corresponding to each respective path (Patrick: [0041]: “time synchronization anomaly detection process 248 may detect path-level anomalies (e.g., cumulative clock drift along the path) and/or hop-level anomalies that may indicate the presence of a time synchronization attack that attempts to disrupt the determinism of the path..”). Therefore it would have been obvious to a person of ordinary skill in art at time invention was made to modify system of LIU in view of Patirck to figure out comparison of OAM packets. One would be motivated to do so because this technique advantageously aids in performance of a mitigation action in the network (Patrick: ABS). Regarding claim 11, LIU/Patrick discloses the method for monitoring end-to-end delays of the plurality of paths of claim 2, wherein each OAM packet carries information of all nodes in the path that the OAM packet passes through; and after acquiring the end-to-end delay of the OAM packet corresponding to each respective path (LIU: “ delay measuring module: generating the delay measurement OAM message, or terminating the delay measurement OAM message, analyzing message content to obtain each link, the delay time of each transmitting node and the time delay of the whole path.”), the method further comprises: determining path information of the end-to-end delay according to the information of all nodes carried in each OAM packet (LIU: When the destination node receives the OAM message in the OAM message recording and destination nodes when receiving of all nodes and the timestamp recorded in the OAM message of stamp information calculated for each link, the delay time of each transmitting node and the path delays.”). Regarding claim 12, LIU/Patrick discloses the method for monitoring end-to-end delays of the plurality of paths of claim 3, wherein each OAM packet carries information of all nodes in the path that the OAM packet passes through; and after acquiring the end-to-end delay of the OAM packet corresponding to each respective path (LIU: “ delay measuring module: generating the delay measurement OAM message, or terminating the delay measurement OAM message, analyzing message content to obtain each link, the delay time of each transmitting node and the time delay of the whole path.”) , the method further comprises: determining path information of the end-to-end delay according to the information of all nodes carried in each OAM packet (LIU: When the destination node receives the OAM message in the OAM message recording and destination nodes when receiving of all nodes and the timestamp recorded in the OAM message of stamp information calculated for each link, the delay time of each transmitting node and the path delays.”). Regarding claim 15, LIU/Patrick discloses the method for monitoring end-to-end delays of the plurality of paths of claim 2, wherein the OAM packet carries a detection type flag, and the detection type flag is used for instructing the receiving end or the controller to acquire the end-to-end delay of the OAM packet corresponding to each respective path (Patrick: [0066]: “In some embodiments, resources can be conserved by having time synchronization anomaly detection process 248 maintain only one model 516 per type of node, as opposed to per node/link. For example, process 248 may use a clustering technique (e.g., k-means, etc.), to group similar devices along the path by their characteristics (e.g., types, configurations, locations in the clock distribution topology, etc.). .”). Therefore it would have been obvious to a person of ordinary skill in art at time invention was made to modify system of LIU in view of Patirck to figure out comparison of OAM packets. One would be motivated to do so because this technique advantageously aids in performance of a mitigation action in the network (Patrick: ABS). Regarding claim 16, LIU/Patrick discloses the method for monitoring end-to-end delays of the plurality of paths of claim 3, wherein the OAM packet carries a detection type flag, and the detection type flag is used for instructing the receiving end or the controller to acquire the end-to-end delay of the OAM packet corresponding to each respective path (Patrick: [0066]: “In some embodiments, resources can be conserved by having time synchronization anomaly detection process 248 maintain only one model 516 per type of node, as opposed to per node/link. For example, process 248 may use a clustering technique (e.g., k-means, etc.), to group similar devices along the path by their characteristics (e.g., types, configurations, locations in the clock distribution topology, etc.). .”). Therefore it would have been obvious to a person of ordinary skill in art at time invention was made to modify system of LIU in view of Patirck to figure out comparison of OAM packets. One would be motivated to do so because this technique advantageously aids in performance of a mitigation action in the network (Patrick: ABS). Claims 2-3 are rejected under 35 U.S.C. 103 as being unpatentable over LIU (CN 107508719 A) in view of Wetterwald Patrick et al (US 20190349392 A1) in further view of CHOI (KR 20130085541 A). Regarding claim 2, LIU/Patrick discloses the method for monitoring end-to-end delays of the plurality of paths of claim 1 (LIU: “ The point of the invention is that in an end to end delay measurement OAM message, carrying all the time information of the forwarding node to realize one-off measurement network per-hop delay & calculating to obtain each link, the delay of each transmitting node and the path delay”), Modified LIU doesn’t explicitly teach packet elimination. CHOI however discloses wherein the method is applied to a receiving end, the marked receiving timestamp comprises a timestamp of the OAM packet marked by the receiving end, and nodes having a packet elimination function in each of the paths do not use the packet elimination function for the OAM packet (CHOI: “ A packet transmission device and method are provided to efficiently utilize the bandwidth of a packet transmission network by eliminating the overload of the packet transmission network. ”). Therefore it would have been obvious to a person of ordinary skill in art at time invention was made to modify system of modified LIU in view of Zhu to figure out number of packets and paths. One would be motivated to do so because this technique advantageously aids in to efficiently utilize the bandwidth of a packet transmission network by eliminating the overload of the packet transmission network (CHOI). Regarding claim 3, LIU/Patrick discloses the method for monitoring end-to-end delays of the plurality of paths of claim 2, wherein before acquiring an end-to-end delay of the OAM packet corresponding to each respective path (LIU: “ The point of the invention is that in an end to end delay measurement OAM message, carrying all the time information of the forwarding node to realize one-off measurement network per-hop delay & calculating to obtain each link, the delay of each transmitting node and the path delay”), the method further comprises: Modified LIU doesn’t not explicitly discloses the determining that a quantity of the received OAM packets is equal to a quantity of the paths. CHOI however discloses the determining that a quantity of the received OAM packets is equal to a quantity of the paths (CHOI: “The monitoring block 120 may control the load balancing block 130 to store the data packet DP in the determined main path queue when the number of packets stored in the determined main path queue is less than or equal to a threshold value.”). Therefore it would have been obvious to a person of ordinary skill in art at time invention was made to modify system of modified LIU in view of Zhu to figure out number of packets and paths. One would be motivated to do so because this technique advantageously aids in to efficiently utilize the bandwidth of a packet transmission network by eliminating the overload of the packet transmission network (CHOI). Allowable Subject Matter Claims 4-5, 13-14 and 17-18 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in all independent form including all of the limitations of the base claim and any intervening claims. Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. This includes: Any inquiry concerning this communication or earlier communications from the examiner should be directed to Sibte Bukhari whose telephone number is (571) 270-7122. The examiner can normally be reached on M-F 9:00 - 6:00. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Vivek Srivastava can be reached on (571) 272-7304. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300 Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /SIBTE H BUKHARI/Examiner, Art Unit 2449
Read full office action

Prosecution Timeline

Sep 06, 2024
Application Filed
Oct 20, 2026
Non-Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12786120
PACKET COMMUNICATION APPARATUS, PACKET PROCESSING RULE SETTING METHOD AND PROGRAM
3y 8m to grant Granted Nov 03, 2026
Patent 12786293
METHOD, DEVICE, AND COMPUTER PROGRAM PRODUCT FOR DOCUMENT TRANSMISSION
2y 2m to grant Granted Nov 03, 2026
Patent 12771572
COMMUNICATION SYSTEM, COMMUNICATION METHOD, NETWORK DEVICE AND PROGRAM
3y 7m to grant Granted Oct 20, 2026
Patent 12771567
STITCHING HETEROGENEOUS MULTICAST DOMAINS
3y 9m to grant Granted Oct 20, 2026
Patent 12764586
MEASUREMENT METHOD AND APPARATUS, DEVICE, AND READABLE STORAGE MEDIUM
2y 3m to grant Granted Oct 13, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
79%
Grant Probability
99%
With Interview (+33.9%)
3y 1m (~11m remaining)
Median Time to Grant
Low
PTA Risk
Based on 446 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month