Prosecution Insights
Last updated: November 20, 2026
Application No. 18/854,237

TURBINE BLADE AND GAS TURBINE

Final Rejection §103
Filed
Oct 04, 2024
Priority
May 20, 2022 — JP 2022-082725 +1 more
Examiner
CLARK, RYAN C
Art Unit
3745
Tech Center
3700 — Mechanical Engineering & Manufacturing
Assignee
Mitsubishi Heavy Industries Ltd.
OA Round
2 (Final)
88%
Grant Probability
Favorable
3-4
OA Rounds
0m
Est. Remaining
95%
With Interview

Examiner Intelligence

Grants 88% — above average
88%
Career Allowance Rate
269 granted / 305 resolved
+18.2% vs TC avg
Moderate +7% lift
Without
With
+7.1%
Interview Lift
resolved cases with interview
Fast prosecutor
1y 11m
Avg Prosecution
17 currently pending
Career history
334
Total Applications
across all art units

Statute-Specific Performance

§101
3.0%
-37.0% vs TC avg
§103
39.9%
-0.1% vs TC avg
§102
30.5%
-9.5% vs TC avg
§112
25.2%
-14.8% vs TC avg
Black line = Tech Center average estimate • Based on career data from 305 resolved cases

Office Action

§103
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Response to Arguments Applicant's arguments filed 09/15/2026 have been fully considered but they are not persuasive. Regarding Applicant’s arguments (see pages 9-10) assert that cooling passages of Suenaga et al. (JP 2005146858 A) “discharges the entire amount of cooling air from the connected cooling passage to the outside of the b blade (see paragraph [0036] and [0041]).” and renders the modification of Starkweather (EP 1,361,337 A1) unsatisfactory for its intended purpose. The Examiner has reproduced paragraphs [0036] and [0041] of Suenaga et al. below. “The cooling air flows in the cooling passage 2 from the blade root portion 13 side to the blade tip portion 11a of the airfoil portion 11, turns back at the turn-back portion 21, and flows to the platform 12, and the airfoil portion 11, the platform 12, And flows to the discharge passage 3 and is discharged to the outside of the rotor blade 1. Further, the discharge port 31 is formed so as to flow on the outer surface 122 of the adjacent platform 12 on the airfoil 11 side, and the cooling air discharged from the discharge port 31 flows on the outer surface 122 of the platform 12. As a result, the connecting portion between the platform 12 and the airfoil portion 11, which is difficult to cool in the turbine, can be cooled from inside and outside, reducing the generation of thermal stress, resulting in deformation and destruction of the moving blade. Can be prevented. [0036]” “In the moving blade 1B shown in FIG. 4, the cooling passage 2 formed in the blade root portion 13 and the airfoil portion 11 is connected to the discharge passage 3B formed inside the platform 12B by the platform 12B. The blade 1B extends to the rear edge 1Be side of the rotor blade 1B, and is connected to a discharge port 31B formed on the rear edge portion 1Be side of the platform 12B. [0041]” The Examiner respectfully asserts that nothing in the above paragraphs require the entire amount of the cooling air provided to the airfoil to exit solely through the cooling passages to the platform. Further, example patterns of Suenaga et al. (Fig. 7, Fig. 8) provide for cooling passages in the blade that do not all terminate in the platform cooling passages as asserted by the Applicant in their arguments and would not render the combination “unsatisfactory for its intended purpose”; and a person of ordinary skill would be compelled by the teachings of Suenaga et al. to provide platform cooling from at least one of the internal passages of Starkweather. Therefore, the Examiner must maintain the rejections of record. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claims 1, 5-9, and 13 are rejected under 35 U.S.C. 103 as being unpatentable over Starkweather (EP 1,361,337 A1) in view of Suenaga et al. (JP 2014043798 A). Regarding claim 1, Starkweather discloses a turbine blade (12) comprising: a first internal passage (40) that extends in a blade height direction (14 is the root, 28 is a radially outer airfoil tip; therefore, there must be a blade height and the internal passage extends therewith) and that is open at a root (14) of the blade; a second internal passage (41) that extends in the blade height direction, is formed on a leading edge side (20) of an airfoil portion (Fig. 3) with respect to the first internal passage, and is connected to the first internal passage at a first turn-back portion (45, 50, 34) on a tip-end side (28) of the airfoil portion; a third internal passage (42) that extends in the blade height direction, is formed closest to the leading edge side (Fig. 3), and is connected to the second internal passage at a second turn-back portion (52) on a base-end side of the airfoil portion (Fig. 3); and a fourth internal passage (66) that extends in the blade height direction, wherein an end portion of the fourth internal passage which is closest to the tip-end of the airfoil portion is connected to the second turn-back portion (Fig. 3). However, Starkweather does not disclose, "wherein the third internal passage includes a third internal passage opening portion for supplying cooling air in the third internal passage to a platform", “a side portion cooling passage that is formed in at least one side portion of the platform in a suction-pressure direction of the airfoil portion, the side portion cooling passage including a pressure side portion cooling passage formed in a side portion of a pressure side in the suction-pressure direction”, and “a supply passage that allows the third internal passage opening portion and the side portion cooling passage to communicate with each other, the supply passage including a pressure supply passage allowing the third internal passage opening portion and the pressure side portion cooling passage to communicate with each other.” Suenaga et al. teaches, in the field of cooling gas turbine blades ([0011]-[0012], Fig. 4), wherein at least one of the cooling passages (Fig. 4, 3B) is connected to the third internal passage (2) of the gas turbine engine, and supplies cooling fluid to the platform (12B), a side portion cooling passage that is formed in at least one side portion of the platform in a suction-pressure direction of the airfoil portion (Fig. 4 shows the cooling passages on both the suction and pressure sides of the platform), a supply passage that allows the third internal passage opening portion and the side portion cooling passage to communicate with each other (Fig. 4, they are at least communicated through the supply passage 2), wherein the side portion cooling passage includes a pressure side portion cooling passage formed in a side portion on a pressure side in the suction-pressure direction (Fig. 4). It would have been obvious to one of ordinary skill in the art before the effective filing date to modify the turbine blade of Starkweather to have cooling passages in the platform that are supplied by the internal passages in the turbine engine blade as taught by Suenaga et al., as both references are in the same field of endeavor, and one of ordinary skill would appreciate that, "As a result, the exhaust passage 3B is arranged in a wide portion of the platform 12B and cooling air flows through that portion, thereby widely cooling the platform 12B where heat is concentrated, reducing the thermal stress generated in the platform 12B and preventing deformation and destruction of the blades. [0043]". Regarding claim 5, the combination of Starkweather and Suenaga et al. teach all of claim 1 as above, wherein the side portion cooling passage includes a suction side portion cooling passage formed in a side portion on a suction side in the suction-pressure direction (Suenaga et al., Fig. 4). Regarding claim 6, the combination of Starkweather and Suenaga et al. teach all of claim 1 as above, wherein the first internal passage includes a first internal passage opening portion for supplying cooling air in the first internal passage to the platform (Suenaga et al., Fig. 4; the Examiner notes that there are supply passages between all of the internal passages to the platform), the side portion cooling passage further includes a suction side portion cooling passage formed in a side portion of the platform on a suction side in the suction-pressure direction (Suenaga et al., Fig .4), the supply passage further includes a suction supply passage allowing the first internal passage opening portion and the suction side portion cooling passage to communicate with each other (Suenaga et al., Fig .4). Regarding claim 7, the combination of Starkweather and Suenaga et al. teach all of claim 1 as above, wherein the second internal passage includes a second internal passage opening portion for supplying cooling air in the second internal passage to the platform (Suenaga et al., Fig. 4; the Examiner notes that there are supply passages between all of the internal passages to the platform), the side portion cooling passage further includes a suction side portion cooling passage formed in a side portion of the platform on a suction side in the suction-pressure direction (Suenaga et al., Fig. 4), and the supply passage further includes a suction supply passage allowing the second internal passage opening portion and the suction side portion cooling passage to communicate with each other (Suenaga et al., Fig. 4). Regarding claim 8, the combination of Starkweather and Suenaga teach all of claim 1 as above, further comprising: a plurality of cooling holes (Starkweather; 74, 60) that are formed in a blade wall (Starkweather; 1, 20) forming the third internal passage, communicated with the third internal passage, and are open to a blade surface of the airfoil portion (Starkweather, Fig. 3). Regarding claim 9, the combination of Starkweather and Suenaga et al. teach a gas turbine (Starkweather, abstract) comprising: the turbine blade according to claim 1 above. Allowable Subject Matter Claim 13 is objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. Regarding claim 13, the combination of Starkweather and Suenaga et al. teach all of claim 1 as above. However, neither the combination of Starkweather and Suenaga et al. nor any of the prior art of record; disclose, teach, or suggest: “wherein a connection position between the pressure supply passage and the pressure side portion cooling passage is located father from an end portion on a trailing edge side of the airfoil portion in the platform than a connection position between the third internal passage opening and the pressure supply passage.” Conclusion THIS ACTION IS MADE FINAL. Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to RYAN C CLARK whose telephone number is (571)272-2871. The examiner can normally be reached Monday - Thursday 0730-1730, Alternate Fridays 0730-1630. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Courtney D Heinle can be reached at (571)-270-3508. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /RYAN C CLARK/Primary Examiner, Art Unit 3745
Read full office action

Prosecution Timeline

Oct 04, 2024
Application Filed
Jun 15, 2026
Non-Final Rejection mailed — §103
Sep 15, 2026
Response Filed
Nov 03, 2026
Final Rejection mailed — §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12790949
LOCKING SPACER ASSEMBLIES AND METHOD FOR INSTALLING A LOCKING SPACER ASSEMBLY
2y 1m to grant Granted Nov 10, 2026
Patent 12789961
HULL-DIRECTED PROPULSION SYSTEM OF CONTRA-ROTATING PROPELLER AND METHOD FOR MANUFACTURING THE SAME
1y 6m to grant Granted Nov 10, 2026
Patent 12779573
CONTROLLING ON-TIME OF PWM APPLIED TO POWER BLOCKS IN WELDING SYSTEM
3y 7m to grant Granted Nov 03, 2026
Patent 12775046
INTEGRATED WIND-TURBINE MONITORING
2y 3m to grant Granted Oct 27, 2026
Patent 12774679
NOSECONE FOR A DUCTED FAN GAS TURBINE ENGINE
2y 4m to grant Granted Oct 27, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
88%
Grant Probability
95%
With Interview (+7.1%)
1y 11m (~0m remaining)
Median Time to Grant
Moderate
PTA Risk
Based on 305 resolved cases by this examiner. Grant probability derived from career allowance rate.