Application No. 18/856,910

RANDOM ACCESS CHANNEL PROCEDURE IN INTER-BAND CARRIER AGGREGATION WITH SYNCHRONIZATION SIGNAL BLOCK-LESS CARRIER

Non-Final OA §103§112
Filed
Oct 15, 2024
Priority
Jul 07, 2022 — nonprovisional of PCTCN2022104276
Examiner
TRAN, MONG THUY THI
Art Unit
Tech Center
Assignee
Qualcomm Incorporated
OA Round
1 (Non-Final)
86%
Grant Probability
Favorable
1-2
OA Rounds
3m
Est. Remaining
99%
With Interview

Examiner Intelligence

Grants 86% — above average
86%
Career Allowance Rate
668 granted / 773 resolved
+26.4% vs TC avg
Moderate +14% lift
Without
With
+14.0%
Interview Lift
resolved cases with interview
Typical timeline
2y 3m
Avg Prosecution
14 currently pending
Career history
783
Total Applications
across all art units

Statute-Specific Performance

§101
4.3%
-35.7% vs TC avg
§103
60.7%
+20.7% vs TC avg
§102
11.9%
-28.1% vs TC avg
§112
13.0%
-27.0% vs TC avg
Black line = Tech Center average estimate • Based on career data from 773 resolved cases

Office Action

§103 §112
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . DETAILED ACTION This Office Action is in response to the Applicant's communication filed on 10/15/2024. In virtue of this communication, claims 1 – 23 are currently pending in the instant application. Claim Rejections - 35 USC § 112 The following is a quotation of the first paragraph of 35 U.S.C. 112(a): (a) IN GENERAL.—The specification shall contain a written description of the invention, and of the manner and process of making and using it, in such full, clear, concise, and exact terms as to enable any person skilled in the art to which it pertains, or with which it is most nearly connected, to make and use the same, and shall set forth the best mode contemplated by the inventor or joint inventor of carrying out the invention. Claims 22 and 23 are rejected under 35 U.S.C. 112(a) or 35 U.S.C. 112 (pre-AIA ), first paragraph, as failing to comply with the written description requirement. The claim(s) contains subject matter which was not described in the specification in such a way as to reasonably convey to one skilled in the relevant art that the inventor or a joint inventor, or for applications subject to pre-AIA 35 U.S.C. 112, the inventor(s), at the time the application was filed, had possession of the claimed invention. The claims include the limitation “the reader device”. Examiner could not find support for this limitation in originally filed specification. Examiner suggests that the Applicant provide where exactly the support could be found in the original filed specification or amend the claims to overcome the 112 (a) rejection. The following is a quotation of 35 U.S.C. 112(b): (b) CONCLUSION.—The specification shall conclude with one or more claims particularly pointing out and distinctly claiming the subject matter which the inventor or a joint inventor regards as the invention. Claims 22 and 23 are rejected under 35 U.S.C. 112(b) or 35 U.S.C. 112 (pre-AIA ), second paragraph, as being indefinite for failing to particularly point out and distinctly claim the subject matter which the inventor or a joint inventor (or for applications subject to pre-AIA 35 U.S.C. 112, the applicant), regards as the invention. Claims 22 and 23 are rejected under 35 U.S.C. 112(b), as being lack of antecedent basis. Claims 22 and 23 recite limitation in line 4 “the reader device”, which is not defined previously in the claims. And it is also unclear as to what it refers to. Claim Rejections - 35 USC § 103 6. The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102 of this title, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. 7. Claims 1 are rejected under 35 U.S.C. 103 as being unpatentable over Islam et al. (hereinafter “Islam”) (Pub # US 2019/0364599 A1) in view of Liu et al. (hereinafter “Liu”) (Pub # US 2023/0188293 A1). Regarding claims 1 and 22, Islam discloses a method of wireless communication by a user equipment (UE) (see UE 350 in FIG. 3 comprising a memory (360 in FIG. 3) comprising executable instructions; and one or more processors (359 in FIG. 3) configured to execute the executable instructions, see [0029], [0053]), comprising: detecting a synchronization signal block (SSB) in a first frequency band (see [0052] for each receiver receives a signal and recovers information modulated onto an RF carrier, see S505 in FIG. 5, [0060] – [0062], [0091] for the UE receives SSB(s) on a first cell/ first frequency band and see [0065] for the UE selects an SSB based on RSRP measurement threshold); determining whether a second frequency band is configured to transmit SSBs (see abstract, S507 – S511 in FIG. 5, [0059] – [0064] for the UE is limited or unable from transmitting uplink communication via the first cell/first frequency band, determine to transmit the PRACH message via second cell or second frequency band, and see [0033] for using spectrum bandwidth per carrier in a carrier aggregation); selecting, based on the determination, one or more parameters for transmission or reception of one or more messages of a random-access channel (RACH) procedure (see S507 – S511 in FIG. 5, [0059] – [0065] for enable the UE to select an appropriate RACH occasion and preamble index from the set of time and frequency resources in order to convey a particular SSB index/CSI-RS to the network); and performing the RACH procedure on the second frequency band using the selected parameters (see S511 in FIG. 5, [0067] for the UE uses the corresponding dedicated RACH occasion and preamble index for the selected SSB/CSI-RS to transmit a RACH preamble, e.g., Msg1 on 2nd cell/ 2nd frequency band, to the network using a time and frequency resource and preamble index corresponding to the selected SSB/CSI-RS). Islam teaches about 1st and 2nd cell / 1st and 2nd frequency band. Islam does not disclose specifically that 1st and 2nd carrier. In an analogous art, Liu discloses 1st and 2nd carrier (see Liu, [0038], [0058], where Liu is discussing the UE is served by both cells over the different carrier, the UE is configured with two carriers within a band, and signals/channels to/from the cell on the first carrier may be QCLed directly /indirectly with the other cell transmitted on the second carrier). Therefore, it would have been obvious to one of ordinary skill in the art before effective filing date the invention was made, to modify the invention of Islam, and have the first/second cell or first/second frequency band to serve the UE in different carrier (i.e., inter-cell), thereby provides an application solution for multiple transmission reception points scenarios in LTE and 5G system such that base station and/or UE operate with carrier aggregation, as discussed by Liu (see Liu, [0005], [0042]). Regarding claims 13 and 23, Islam discloses a method of wireless communication by a network entity (an apparatus (see 1302’ in FIG. 14) for wireless communications by a network entity, comprising: a memory comprising executable instructions; and one or more processors configured to execute the executable instructions (see base station 310 in FIG. 3, 1414 in FIG.10 comprising a memory (376 in FIG. 3, 1406 in FIG. 14) comprising executable instructions; and one or more processors (375 in FIG. 3, 1404 in FIG. 14) configured to execute the executable instructions, see [0050], [0121] –[0124]), comprising: transmitting information indicating a first frequency band is configured for synchronization signal block (SSB) transmissions (see S505 in FIG. 5, [0091] for the BS transmits SSB(s) on a first cell/ first frequency band); determining, based on whether a second frequency band is configured to transmit SSBs, one or more parameters for transmission or reception of one or more messages of a random access channel (RACH) procedure (see 501 in FIG. 5, [0090] for base station in which the UE transmits a RACH on a different cell/frequency band than the cell/frequency band on which the UE receives an SSB/CSI-RS that prompts the RACH, the base station determines RACH parameters based on a combination of a first cell for SSB and a second cell for RACH corresponding to the SSB, the base station may determine the RACH parameters based on a combination of a first frequency band for an SSB and a second frequency band for a RACH corresponding to the SSB, and the base station may configure different RACH parameters for various combinations of SSB/RACH, and see [0033] for using spectrum bandwidth per carrier in a carrier aggregation); and participating in the RACH procedure with a user equipment (UE) on the second frequency band using the parameters (see S511 in FIG. 5, [0067], [0092], [0093] for the UE uses the corresponding dedicated RACH occasion and preamble index for the selected SSB/CSI-RS to transmit a RACH preamble, e.g., Msg1 on 2nd cell/ 2nd frequency band, to the network using a time and frequency resource and preamble index corresponding to the selected SSB/CSI-RS). Islam teaches about 1st and 2nd cell / 1st and 2nd frequency band. Islam does not disclose specifically that 1st and 2nd carrier. In an analogous art, Liu discloses 1st and 2nd carrier (see Liu, [0038], [0058], where Liu is discussing the UE is served by both cells over the different carrier, the UE is configured with two carriers within a band, and signals/channels to/from the cell on the first carrier may be QCLed directly /indirectly with the other cell transmitted on the second carrier). Therefore, it would have been obvious to one of ordinary skill in the art before effective filing date the invention was made, to modify the invention of Islam, and have the first/second cell or first/second frequency band to serve the UE in different carrier, thereby provides an application solution for multiple transmission reception points scenarios in LTE and 5G system such that base station and/or UE operate with carrier aggregation, as discussed by Liu (see Liu, [0005], [0042]). Regarding claims 2 and 14, Islam in view of Liu disclose wherein the one or more parameters comprise a RACH occasion (RO) resource, a spatial transmit filter, and a power control parameter (see Islam, [0059], [0067], [0068], [0084] for RACH occasion). Regarding claims 3 and 15, Islam in view of Liu disclose wherein the second carrier supports time division duplexing (TDD) (see Islam, [0043] for subframes within the set of subcarriers are TDD in which for a particular set of subcarriers, and the 5G/NR frame structure is assumed to be TDD, or also see Liu, [0033] for carrier is seen as operating in a time division duplexed (TDD) mode). Regarding claims 4 and 16, Islam in view of Liu disclose wherein the one or more messages comprise at least one of a physical RACH (PRACH) preamble or physical uplink shared channel (PUSCH) (see Islam, [0007], [0059], [0071], [0091]). Regarding claims 5 and 17, Islam in view of Liu disclose wherein: the second carrier is not configured to transmit SSBs; and the selecting comprises selecting the one or more parameters based on an SSB transmitted in the first carrier (see Islam, [0070], Table 1 – 5). Regarding claims 7 and 18, Islam in view of Liu disclose wherein: the second carrier is configured to transmit SSBs; and the selecting comprises selecting the one or more parameters based on an SSB transmitted in the second carrier or an SSB transmitted in the first carrier (see Islam, [0070], Table 1 – 5). Regarding claims 8 and 19, Islam in view of Liu disclose receiving signaling indicating whether the UE is to select the one or more parameters based on the SSB transmitted in the second carrier or the SSB transmitted in the first carrier (see Islam, [0070], Table 1 – 4). Regarding claims 9 and 20, Islam in view of Liu disclose wherein: the one or more messages comprise at least one of a physical downlink control channel (PDCCH) or a physical downlink shared channel (PDSCH) (see Islam, [0047], [0072]); and the one or more parameters comprises a quasi-colocation (QCL) source for reception of the PDCCH or PDSCH (see Liu, [0043], [0046] for a PDCCH is used to indicate via quasi co-location (QCL) relation). Therefore, it would have been obvious to one of ordinary skill in the art before effective filing date the invention was made in order to provide an application solution for multiple transmission reception points scenarios in LTE and 5G system such that base station and/or UE operate with carrier aggregation, as discussed by Liu (see Liu, [0005], [0042]). Regarding claims 10 and 11, Islam in view of Liu disclose wherein: the second carrier is/ is not configured to transmit SSBs (see Islam, [0070], Table 1 – 5); and the selecting comprises selecting, as the QCL source for reception of the PDCCH or PDSCH, an SSB transmitted in the first carrier or an SSB transmitted in the second carrier (see Islam, [0047], [0072], and see Liu, [0043] - [0046], [0049] – [0053] for a PDCCH is used to indicate via quasi co-location (QCL) relation). Therefore, it would have been obvious to one of ordinary skill in the art before effective filing date the invention was made in order to provide an application solution for multiple transmission reception points scenarios in LTE and 5G system such that base station and/or UE operate with carrier aggregation, as discussed by Liu (see Liu, [0005], [0042]). Allowable Subject Matter Claims 6 and 12 are objected to as being dependent upon a rejected base claim but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. Claim 21 is objected to as being dependent upon a rejected base claim but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to MONG-THUY THI TRAN whose telephone number is (571)270-3199. The examiner can normally be reached Monday-Friday: 9AM - 6PM (IFP). Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, ANTHONY ADDY can be reached at (571)272-7795. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /MONG-THUY T TRAN/ Primary Examiner, Art Unit 2645
Read full office action

Prosecution Timeline

Oct 15, 2024
Application Filed
Sep 11, 2026
Non-Final Rejection mailed — §103, §112 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12745323
METHOD FOR USER PLANE CONNECTION ACTIVATION OR DEACTIVATION PER SESSION
1y 3m to grant Granted Sep 22, 2026
Patent 12739746
Network Nodes, User Equipment and Methods Performed Therein
2y 9m to grant Granted Sep 15, 2026
Patent 12739828
METHOD AND DEVICE FOR TRANSMITTING AND RECEIVING SIGNAL IN WIRELESS COMMUNICATION SYSTEM
2y 5m to grant Granted Sep 15, 2026
Patent 12732945
SYSTEMS AND METHODS FOR LOW POWER CONSUMPTION GEOFENCING
2y 3m to grant Granted Sep 08, 2026
Patent 12726259
METHOD AND DEVICES FOR PROVIDING BACKHAUL LINKS
2y 6m to grant Granted Sep 01, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
86%
Grant Probability
99%
With Interview (+14.0%)
2y 3m (~3m remaining)
Median Time to Grant
Low
PTA Risk
Based on 773 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month