Prosecution Insights
Last updated: November 12, 2026
Application No. 18/856,966

Modular building

Final Rejection §102§103
Filed
Oct 15, 2024
Priority
Apr 13, 2022 — PO 117908 +1 more
Examiner
TRIGGS, ANDREW J
Art Unit
3635
Tech Center
3600 — Transportation & Electronic Commerce
Assignee
Blc3 Evolution Lda
OA Round
2 (Final)
67%
Grant Probability
Favorable
3-4
OA Rounds
94%
With Interview

Examiner Intelligence

Grants 67% — above average
67%
Career Allowance Rate
739 granted / 1110 resolved
+14.6% vs TC avg
Strong +28% interview lift
Without
With
+27.9%
Interview Lift
resolved cases with interview
Typical timeline
Avg Prosecution
52 currently pending
Career history
1148
Total Applications
across all art units

Office Action

§102 §103
DETAILED ACTION The Examiner acknowledges Claims 1, 6-14 have been amended and Claims 2 and 4-5 have been cancelled. Response to Arguments Applicant’s arguments and amendments with respect to the Drawing Objections have been fully considered and are persuasive. The Objections of the Drawings have been withdrawn. Applicant’s arguments and amendments with respect to the 112 rejections have been fully considered and are persuasive. The 112 rejections have been withdrawn. Applicant’s arguments and amendments with respect to the Prior Art rejections have been considered but are moot because the amendment(s) have necessitated a new ground(s) of rejection [see rejection below]. Note: the Applicant argues that there is no articulated reason with rational underpinning to arrive at the claimed inventions of claims 8-14 and there is no hint, motivation or indication in the Prior art to combine the teachings to provide the elements, steps or features of claims 8-14. The Examiner disagrees and reasons that the rejections below provided both reasoning and rationale to the motivation to combine Prior Art teachings. Furthermore, Applicant's arguments fail to comply with 37 CFR 1.111(b) because they amount to a general allegation that the claims define a patentable invention without specifically pointing out how the language of the claims patentably distinguishes them from the references. Additional note: the Applicant argues against the product-by-process treatment of claim 14. However, the Examiner disagrees because of the dependency of claim 14 from claim 1 and the case law of In Re Thopre and thus maintains the rejection. Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claims 1 and 3 are rejected under 35 U.S.C. 102(a)(2) as being anticipated by US Patent # 8,607,508 to Foss. Regarding claim 1, Foss teaches in Figure 2, a modular building (16) [stayed connection (Column 3, Line 46)] characterized in that it comprises a constructive structure [supportive structure (Column 4, Line 43)] composed of reused [taking elements of a wind turbine tower and renaming them] wind turbine segments (18, 20, 22, 24 and 28), the constructive structure (Column 4, Lines 43-67) comprising: a vertical axis [that of the turbine tower]; a set of foundation rings (24) [pillars (Column 3, Line 53)], structurally adapted to the ground [through the lower tower portion 14] which supports the building (16), wherein the set of foundation rings (24) comprises at least one first annular section [ring (Column 3, Line 53)] of at least one wind turbine tower (1), wherein the at least one first annular section [ring] is transverse to the vertical axis; a foundation balance platform (22) [torsion plate (Column 3, Line 48)], mechanically coupled [connected (Column 3, Lines 52-53)] to the set of foundation rings (24); a set of outer support structures (18) [diagonal stays (Column 3, Line 54)] each comprising at least one inner blade section [see cross-section in Figure 4] of at least one wind turbine; a set of upper support structures (20/28) [ring plate (Column 3, Lines 46-47) and end portion (Column 4, Line 26)]] each comprising at least one outer blade section [see cross-section in Figure 5] of at least one wind turbine [as part of a wind turbine tower], wherein each of the set of upper support structures (20/28) is placed parallel in a position superior to the foundation balance platform (22), and guaranteeing a mechanical connection [connecting points (Column 2, Line 39)] to the set of outer support structures (20/28); and a central support structure (12) [pipe shaped tower portion (Column 3, Lines 43-44)], positioned centrally in relation to the foundation balance platform (22), mechanically coupled (Columns 3-4, Lines 64-3) to the foundation balance platform (22) and to the set of upper support structures (20/28); wherein the central support structure (12) comprises at least one second transverse annular section [pipe shaped (Column 3, Line 43)] of at least one wind turbine tower (Column 3, Lines 43-44), wherein the at least one second transverse annular section is transverse to the vertical axis [as seen], allowing a vertical construction and, on the same vertical axis, floors [height elevations] adapted for multiple purposes [upper tower portion, lower tower portion and stayed connection (Column 3, Lines 43-46)]. Regarding claim 3, Foss teaches in Figure 3, the foundation balance platform (22) comprises a rectangular shape. Claim Rejections - 35 USC § 103 The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action: A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made. Claims 6 and 7 are rejected under 35 U.S.C. 103 as being unpatentable over US Patent # 8,607,508 to Foss in view of US Patent # 9,194,151 to Foss. Regarding claim 6, Foss teaches a modular building with a mechanical connection between the central support and the set of upper support structures but does not teach a blade connection and bearing support, and a lower expansion joint. However, Foss teaches in Figure 2 of his other Patent, a mechanical connection between a support structure (14) and a set of upper support structures [ring stiffener (Column 3, Line 1)] comprises a blade connection (24) [plate (Column 3, Line 50)] and bearing support (26) [closing plate (Column 3, Line 52)], and a lower expansion joint (29, Fig 4) [cut (Column 3, Line 56)]. It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to combine both of Foss’s Patents and have a reasonable expectation of success because Foss teaches in the second Patent, the bearing support distributes forces along the circumference of the strut to the plate (Column 3, Lines 53-54). Regarding claim 7, Foss teaches a modular building with a set of upper support structures but does not teach a plugging panel and an upper expansion joint. However, Foss teaches in Figure 2 of his other Patent, a set of upper support structures [ring stiffener (Column 3, Line 1)] comprises a plugging panel (24) [plate (Column 3, Line 50)] and an upper expansion joint (26) [closing plate (Column 3, Line 52)] mechanically connected [welded (Column 3, Line 51)] to the plugging panel (24) in order to promote reinforcement of the mechanical connection [distribute forces (Column 3, Line 53)] with a support structure (14). It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to combine both of Foss’s Patents and have a reasonable expectation of success because Foss teaches in the second Patent, the upper expansion joint distributes forces along the circumference of the strut to the plate (Column 3, Lines 53-54). Regarding claim 12, Foss teaches in his Patents, a modular building with an expansion joint but does not teach the lower expansion joint comprises cork. However, it would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to make the expansion joint from cork since it has been held to be within the general skill of a worker in the art to select a known material on the basis of its suitability for the intended use as a matter of obvious design choice. In re Leshin, 125 USPQ 416. It is also common knowledge to choose a material that has sufficient strength, durability, flexibility, hardness, etc. for the application and intended use of that material. Regarding claim 14, These claims are directed to product-by-process claims due to their scope “a method” and their dependency “a modular building according to claim 1”. Even though product-by-process claims are limited by and defined by the process, determination of patentability is based on the product itself. The patentability of a product does not depend on its method of production. If the product in the product-by-process claim is the same as or obvious from a product of the prior art, the claim is unpatentable even though the prior product was made by a different process." In re Thorpe, 777 F.2d 695, 698, 227 USPQ 964, 966. Therefore, the steps of connecting, adapting, drilling, fixing, placing and installing would have been obvious to one of ordinary skill in the art before the effective fling date of the claimed invention. Claims 8 and 10-11 are rejected under 35 U.S.C. 103 as being unpatentable over US Patent # 8,607,508 to Foss in view of US Patent # 9,194,151 to Foss in further view of US Patent # 12,247,551 to Demtroder et al. Regarding claim 8, Foss teaches in his Patents, a modular building but does not teach at least one elevator adapted to an internal structure thereof. However, Demtroder teaches the tower, which is an internal structure of the structure, elevates the nacelle to a height above the ground (Column 4, Lines 51-55). It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to combine the Patents of Foss with Demtroder with a reasonable expectation of success because Demtroder teaches elevating the nacelle to operate and optimize the wind turbine (Column 4, Lines 50-51). Regarding claim 10, Foss teaches in his Patents, a modular building but does not teach at least one inner blade section comprises inner areas adapted to house a fire fighting and safety system. However, Demtroder an inner area of the module adapted to house a fire fighting and safety system [fire suppression (Column 2, Lines 24-35)]. It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to combine the Patents of Foss with Demtroder with a reasonable expectation of success because Demtroder teaches the fire suppression system can extinguish fires in the nacelle (Column 2, Lines 32-33). Regarding claim 11, Foss teaches in his Patents, a modular building but does not teach the inner areas of the at least one blade section comprises conducts, pipes or cabling of different specialties. However, Demtroder an inner area of the module containing hosing and ducts (Column 2, Lines 24-35)]. It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to combine the Patents of Foss with Demtroder with a reasonable expectation of success because Demtroder teaches the hosing and ducts can guide fluid flow in the nacelle (Column 2, Lines 31-32). Claim 9 is rejected under 35 U.S.C. 103 as being unpatentable over US Patent # 8,607,508 to Foss in view of US Patent # 9,194,151 to Foss in view of US Patent # 10,819,252 to Cullman et al. Regarding claim 9, Foss teaches in his Patents, a modular building but does not teach a fluid pressurized hydraulic system. However, Cullman teaches a fluid pressure in a hydraulic system (Abstract). It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to combine the Patents of Foss with Cullman and have a reasonable expectation of success because Cullman teaches dissipating extra energy as heat (Column 6, Lines 41-43). Claim 13 is rejected under 35 U.S.C. 103 as being unpatentable over US Patent # 8,607,508 to Foss in view of US Patent # 9,194,151 to Foss in further view of US Patent Application Publication # 2015/0376857 to Clifton. Regarding claim 13, Foss teaches in his Patents, a modular building structure but does not teach at least one floor flab. However, Clifton teaches in Figure 2, at least one floor slab (18) adjacently located in a parallel position with respect to a foundation balance platform (10), in a parallel position underlying an upper support structure (42). It would have been obvious to one of ordinary skill in the art before the effective filing date of the claimed invention to combine the Patents of Foss with Clifton and have a reasonable expectation of success because Clifton teaches the floor slab creates an uninterrupted floor (Paragraph 0006). Conclusion Applicant's amendment necessitated the new ground(s) of rejection presented in this Office action. Accordingly, THIS ACTION IS MADE FINAL. See MPEP § 706.07(a). Applicant is reminded of the extension of time policy as set forth in 37 CFR 1.136(a). A shortened statutory period for reply to this final action is set to expire THREE MONTHS from the mailing date of this action. In the event a first reply is filed within TWO MONTHS of the mailing date of this final action and the advisory action is not mailed until after the end of the THREE-MONTH shortened statutory period, then the shortened statutory period will expire on the date the advisory action is mailed, and any nonprovisional extension fee (37 CFR 1.17(a)) pursuant to 37 CFR 1.136(a) will be calculated from the mailing date of the advisory action. In no event, however, will the statutory period for reply expire later than SIX MONTHS from the mailing date of this final action. Any inquiry concerning this communication or earlier communications from the examiner should be directed to ANDREW J TRIGGS whose telephone number is (571)270-3657. The examiner can normally be reached Mon-Thurs 6am-2pm EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Brian Mattei can be reached at (571) 270-3238. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /ANDREW J TRIGGS/Primary Examiner, Art Unit 3635
Read full office action

Prosecution Timeline

Oct 15, 2024
Application Filed
Mar 31, 2026
Non-Final Rejection mailed — §102, §103
Sep 30, 2026
Response Filed
Oct 19, 2026
Final Rejection mailed — §102, §103 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12790843
TELESCOPIC SEATING GUARDRAIL STORAGE SYSTEM AND METHOD
2y 5m to grant Granted Nov 10, 2026
Patent 12781496
CIP METAL ACTUATED DECK INSERT
4y 0m to grant Granted Nov 03, 2026
Patent 12781500
EXTERIOR SEALING SYSTEM FOR CONSTRUCTION MODULES
2y 12m to grant Granted Nov 03, 2026
Patent 12781504
METHOD AND APPARATUS FOR CREATING A SCORED HINGE IN A HIP OR RIDGE CAP SHINGLE
2y 5m to grant Granted Nov 03, 2026
Patent 12768173
VERTICAL JOINT SYSTEM FOR A SURFACE COVERING PANEL
3y 6m to grant Granted Oct 20, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

3-4
Expected OA Rounds
67%
Grant Probability
94%
With Interview (+27.9%)
Moderate
PTA Risk
Based on 1110 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month