DETAILED ACTION
Notice of Pre-AIA or AIA Status
The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA .
Claim Objections
Claim(s) 23 is/are objected because of the following informalities (or vagueness): Claim 23 is objected to because of the following informalities: claim 23 depends from claim 16, which depends from claim 15 reciting transmission in SPS opportunities, but inconsistently recites “to monitor” and “monitor” those opportunities. For purposes of examination, “to monitor the one or more SPS opportunities” and “monitor a particular SPS opportunity” are interpreted as “to transmit in the one or more SPS opportunities” and “transmit in a particular SPS opportunity,” respectively, consistent with claim 15. Applicant is requested to correct these inconsistencies.
Claim Rejections - 35 USC § 103
The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action:
A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made.
Claims 1, 2, 9, 15, 16, 23, 29, and 30 are rejected under 35 U.S.C. 103 as being unpatentable over Bagheri et al. (US 2017/0303302, “Bagheri”) in view of Li et al. (US 2018/0184444, “Li”).
Examiner's note: In what follows, references are drawn to Bagheri unless otherwise mentioned.
Bagheri and Li comprise the following features:
With respect to independent claims:
Regarding claim 1, a user equipment (UE) for wireless communication, comprising:
a memory ([0051] “Furthermore, the remote unit 102 may include a processor 202, a memory 204, an input device 206, a display 208, a transmitter 210, and a receiver 212.” See Fig. 2.); and
one or more processors, coupled to the memory ([0052] “In some embodiments, the processor 202 executes instructions stored in the memory 204 to perform the methods and routines described herein.” “The processor 202 is communicatively coupled to the memory 204, the input device 206, the display 208, the transmitter 210, and the receiver 212.”), configured to:
receive information indicating a skip ([0084] “For example, the base unit 104 may send two different types of deactivation commands: a first deactivation command that is a temporary command 710 that applies to only one subframe (i.e., deactivates SPS occasions in a single 1 ms subframe) and a second deactivation command that is a regular command that deactivates until the next activation and/or reactivation command.” See Fig. 7 for the temporary command 710.) of an upcoming semi-persistent scheduling (SPS) opportunity ([0086] “In some embodiments, the temporary command 710 may be sent prior to the subframe 701 in which SPS transmissions are not allowed.”), of a set of configured SPS opportunities ([0084] “In another embodiment, a base unit 104 may perform “Opportunistic muting” of preconfigured SPS resources.” “As illustrated in FIG. 7, subframes 703 may include SPS for a TTI that is deactivated by the temporary command 710 to skip the subframe 701 and then resume after the subframe 701.”).
It is noted that Bagheri describes temporary SPS deactivation followed by resumption, but does not expressly describe in that passage the UE receiver's selective monitoring operation in response to the temporary command. Li teaches signal-controlled selective SPS receiver processing as follows:
monitor one or more SPS opportunities, of the set of SPS opportunities, other than the upcoming SPS opportunity based at least in part on receiving the information ([Li, 0080] “UE 115-a may decode only those resources identified as not being released based on release signal 330 at 345.” “In some examples, if UE 115-a did not receive the release signal 330, UE 115-a decodes all of the SPS resources.”).
In the proposed combination, Bagheri supplies the configured SPS opportunities, the advance temporary skip, and the subsequent resumption; Li supplies the receiver's selection of remaining SPS resources for decoding based on received control information. Applying Li's selective receiver processing to Bagheri's temporary command causes the UE to receive/decode SPS data on the remaining configured opportunities rather than the temporarily deactivated opportunity. (Bagheri, paragraphs 0084 and 0086, Li, paragraph 0080).
Therefore, it is obvious to a PHOSITA, before the effective filing date of the claimed invention, to modify Bagheri's UE by applying Li's release-signal-controlled selective SPS decoding to Bagheri's temporary deactivation command in order to avoid unnecessary decoding on the temporarily deactivated SPS opportunity while preserving reception on the remaining configured SPS opportunities such that the UE performs “decoding only the unreleased resources in the TTI based on the release signal” ([Li, 0021]).
Regarding claim 15, it is a network node claim corresponding to the UE claim 1 in a reciprocal way, except the limitations, “a memory; and one or more processors, coupled to the memory” ([0058] “The apparatus 300 includes one embodiment of the base unit 104.” “Furthermore, the base unit 104 may include a processor 302, a memory 304, an input device 306, a display 308, a transmitter 310, and a receiver 312.” “It should be noted that the processor 302, the memory 304, the input device 306, and the display 308 may be substantially similar to the processor 202, the memory 204, the input device 206, and the display 208 of the remote unit 102, respectively.” See Fig. 3, and the communicative coupling described in [0052]), and “transmit, in one or more SPS opportunities, of the set of SPS opportunities, other than the upcoming SPS opportunity based at least in part on transmitting the information” (Bagheri supplies the occasion-level skip and resumption mapped above; Li additionally describes the corresponding base-station operation of sending a release signal and then transmitting data while the UE processes the resources not released ([Li, 0079] “Base station 105-a sends release signal 330 to UE 115-a to release the unused resources.”; [Li, 0080] “At 335, base station 105-a may release the unused SPS resources. At 340, base station 105-a may transmit the data packet 340 to UE 115-a. UE 115-a may decode only those resources identified as not being released based on release signal 330 at 345.”), and is therefore rejected for the similar reasons set forth in the rejection of claim 1.
Regarding claim 29, it is a method claim corresponding to the UE claim 1, and is therefore rejected for the similar reasons set forth in the rejection of claim 1.
Regarding claim 30, it is a method claim corresponding to the network node claim 15, and is therefore rejected for the similar reasons set forth in the rejection of claim 15.
With respect to dependent claims:
Regarding claims 2 and 16, the UE of claim 1 and the network node of claim 15, respectively, wherein the information includes downlink control information (DCI) ([0062] “A remote unit 102 may monitor PDCCH with CRC scrambled by the SPS C-RNTI in every subframe as the base unit 104 may activate, reactivate, and/or release SPS at any time using downlink control information (“DCI”).”).
Regarding claims 9 and 23, the UE of claim 2 and the network node of claim 16, respectively, wherein the one or more processors, to monitor the one or more SPS opportunities, are configured to:
monitor a particular SPS opportunity occurring after a last indicated skipped SPS opportunity of a set of indicated skipped SPS opportunities
([0084] “As illustrated in FIG. 7, subframes 703 may include SPS for a TTI that is deactivated by the temporary command 710 to skip the subframe 701 and then resume after the subframe 701.”).
Claims 3 and 17 are rejected under 35 U.S.C. 103 as being unpatentable over Bagheri et al. (US 2017/0303302, “Bagheri”) in view of Li et al. (US 2018/0184444, “Li”) and further in view of Bagheri et al. (US 2022/0201674, “Bagheri674”).
Examiner's note: In what follows, references are drawn to Bagheri unless otherwise mentioned.
Regarding claims 3 and 17, it is noted that Bagheri and Li do not expressly describe the claimed first-portion indicator identifying the location of second-portion indicators. Lin teaches that DCI information structure as follows:
the UE of claim 2 and the network node of claim 16, respectively, wherein the DCI is associated with DCI format 2_1 associated with a radio network temporary identifier ([Bagheri674, 0022] “The UE can monitor the DCI format 2_1 with Cyclic Redundancy Check (CRC) scrambled by an INT-RNTI that can be common to multiple devices.”) or a control resource set configured for SPS activation or cancellation (This alternative is not examined.).
Therefore, it is obvious to a PHOSITA, before the effective filing date of the claimed invention, to modify Bagheri in view of Li by using DCI format 2_1 associated with an INT-RNTI, as taught by Bagheri674 to convey the temporary SPS deactivation indication, in order to increase efficient utilization of resources such that “URLLC traffic has to be dynamically multiplexed with traditional eMBB traffic. This is a challenging problem since URLLC traffic is bursty and sporadic, and should be scheduled with a short Transmit Time Interval (TTI) in order to fulfil the latency requirement, whereas eMBB traffic requires longer TTIs allowing lower signaling overhead” [Bagheri674, 0004].
Claims 4, 6, 18 and 20 are rejected under 35 U.S.C. 103 as being unpatentable over Bagheri et al. (US 2017/0303302, “Bagheri”) in view of Li et al. (US 2018/0184444, “Li”) and further in view of Lin et al. (US 2021/0160879, “Lin”).
Examiner's note: In what follows, references are drawn to Bagheri unless otherwise mentioned.
Regarding claims 4 and 18, it is noted that Bagheri and Li do not expressly describe the claimed first-portion indicator identifying the location of second-portion indicators. Lin teaches that DCI information structure as follows:
the UE of claim 2 and the network node of claim 16, respectively, wherein the DCI includes a first portion with a first indicator and a second portion with one or more second indicators, wherein the first indicator identifies a location of the one or more second indicators in the second portion ([Lin, 0285] “If the GC-DCI format includes a bitmap and a block size of M bits is same for all UEs associated with the GC-DCI format, a UE indicated a PDSCH reception or a PUSCH transmission by an i-th bit in the bitmap can derive a location for a corresponding block of M bits providing scheduling information for the PDSCH reception of the PUSCH transmission to be the i-th block of M bits after the bitmap.”).
The bitmap forms the first portion, the applicable bitmap bit is the first indicator, and the subsequent scheduling-information blocks form the second portion containing the second indicators. The specified bit-to-block relationship supplies the claimed location identification.
Therefore, it is obvious to a PHOSITA, before the effective filing date of the claimed invention, to modify Bagheri in view of Li by using Lin's bitmap-and-information-block DCI organization in order to enable a UE to locate its applicable SPS-control information within the DCI such that the configuration identifies “a location of a second number of information bits, smaller than the first number of information bits, in the first DCI format” [Lin, 0005].
Regarding claims 6 and 20, the UE of claim 2 and the network node of claim 16, respectively, wherein the DCI is a group-common DCI that is associated with indicating skips of one or more upcoming SPS opportunities ([Lin, 0321] “In one embodiment, group scheduling for semi-persistently scheduled (SPS) PDSCH receptions is provided, wherein a UE monitors PDCCH for detection of a CGS-DCI format that indicates activation, deactivation, or retransmission of SPS PDSCH for a group of UEs.” Lin supplies the group-control transport; the temporary, upcoming-opportunity skip remains Bagheri's command mapped above.) associated with one or more SPS configurations for one or more UEs ([Lin, 0326] “A UE is provided by higher layers a configuration for a CGS-DCI format with CRC scrambled by a CGS-RNTI, and a configuration for SPS PDSCH receptions at step 1701.”).
The rational and motivation for adding this teaching of Lin are the same as for claim 4.
Claims 5, 8, 19 and 22 are rejected under 35 U.S.C. 103 as being unpatentable over Bagheri et al. (US 2017/0303302, “Bagheri”) in view of Li et al. (US 2018/0184444, “Li”) and further in view of Park et al. (US 2018/0279326, “Park”).
Examiner's note: In what follows, references are drawn to Bagheri unless otherwise mentioned.
Regarding claims 5 and 19, it is noted that Bagheri's temporary command identifies an upcoming deactivated subframe, but the selected passage does not specify the claimed DCI-carried opportunity identifier. Park teaches explicit time-interval identification within DCI as follows:
the UE of claim 2 and the network node of claim 16, respectively, wherein the DCI conveys information identifying one or more identifiers of the upcoming SPS opportunity ([Park, 0109] “When a pre-emption interval, which is a time-section unit of pre-emption in the pre-emption window, is defined as described above, the puncturing indication/pre-emption indication DCI, as described in the first or second embodiment, may be defined i) to directly indicate an index for a pre-emption interval in which pre-emption occurs in the pre-emption window or ii) to indicate a pre-emption interval in which pre-emption occurs based on a bitmap.”).
In the proposed adaptation, Park's explicit interval index would identify the configured time interval of Bagheri's upcoming SPS opportunity. Park supplies the encoding technique, not the prospective SPS character of the resource; the latter remains supplied by Bagheri.
Therefore, it is obvious to a PHOSITA, before the effective filing date of the claimed invention, to modify Bagheri in view of Li by using Park's explicit time-interval index in the temporary deactivation DCI in order to identify the affected SPS interval when selectively freeing configured resources for other traffic such that the system supports “efficient multiplexing for data traffic between the respective services” [Park, 0011].
Regarding claims 8 and 22, the UE of claim 2 and the network node of claim 16, respectively, wherein the DCI includes a bitmap associated with identifying the upcoming SPS opportunity ([Park, 0111] “In addition, when the puncturing indication/pre-emption indication DCI includes bitmap-based pre-emption interval indication information, a plurality of pre-emption intervals, in which pre-emption occurs in the pre-emption window, may be indicated through one piece of puncturing indication/pre-emption indication DCI.”).
The rational and motivation for adding this teaching of Park are the same as for claim 5.
Claims 7 and 21 are rejected under 35 U.S.C. 103 as being unpatentable over Bagheri et al. (US 2017/0303302, “Bagheri”) in view of Li et al. (US 2018/0184444, “Li”) and further in view of Zacharias et al. (US 2018/0279357, “Zacharias”).
Examiner's note: In what follows, references are drawn to Bagheri unless otherwise mentioned.
Regarding claims 7 and 21, the UE of claim 2 and the network node of claim 16, respectively, wherein the DCI identifies at least one of the one or more SPS opportunities, wherein an identification of the upcoming SPS opportunity is based at least in part on an identification of the at least one of the one or more SPS opportunities ([Zacharias, 0090] “After transmitting at approximately 205 ms, the UE 145, 250 may skip communication periods at approximately 245 ms, 285 ms, and 325 ms, and may again transmit at 365 ms (not shown). In this way, the UE 145, 250 achieves the second periodicity or interval without reconfiguration of the SPS resource allocation.”).
The proposed implementation uses the DCI-indicated effective periodicity and known SPS timing to identify the retained opportunities at 205 and 365 ms, then identifies the intervening original opportunities at 245, 285 and 325 ms for skipping. This supplies the claimed dependency through a schedule comparison.
Therefore, it is obvious to a PHOSITA, before the effective filing date of the claimed invention, to modify Bagheri in view of Li by using Zacharias’ DCI indicated effective periodicity to identify retained SPS opportunities and determinge intervening opportunities for skipping in order to accommodate a changed traffic interval without reconfiguring the existing SPS allocation such that the system supports “the indicator identifies a release of a subsequent resource allocation of the UE; and/or skipping, by the UE” [Zacharias, 0005].
Claims 10-11, 13, 24-25 and 27 are rejected under 35 U.S.C. 103 as being unpatentable over Bagheri et al. (US 2017/0303302, “Bagheri”) in view of Li et al. (US 2018/0184444, “Li”) and further in view of Sun et al. (US 2022/0116876, “Sun”).
Examiner's note: In what follows, references are drawn to Bagheri unless otherwise mentioned.
Regarding claims 10 and 24, the UE of claim 1 and the network node of claim 15, respectively, wherein the information includes a demodulation reference signal with a reference signal received power less than a configured threshold ([Sun, 0100] “the reference signal related to the WUS is a DMRS in the CORESET corresponding to the M TCI states, the target trigger event may include one of the following:”, and [Sun, 0103] “A reference signal received power RSRP is continuously less than a first threshold within a first time period, where the first threshold is configured by a network device or determined based on a first preset condition.”).
Sun’s [Sun, 0100] expressly identifies the DRMS embodiment to which the enumerated trigger events apply and [Sun, 0103] supplies its below threshold RSRP condition. The network configured alternative supplies the claimed configured threshold.
Therefore, it is obvious to a PHOSITA, before the effective filing date of the claimed invention, to modify Bagheri in view of Li by using Sun’s DMRS based RSRP assessment to the physical layer reception associated with SPS-skip signaling in order to provide a network configurable signal quality criterion for the UE’s receiver control decisions such that the “performing a link management operation based on the M TCI states, where the link management operation includes at least one of a beam failure detection operation and a radio link failure detection operation.” [Sun, 0007].
Regarding claims 11 and 25, the UE of claim 10 and the network node of claim 24, respectively, wherein the configured threshold is based at least in part on a channel prioritization (This alternative is not examined.) or a quality of service ([Sun, 0104] “the first threshold used as an assessment criterion of the reference signal received power RSRP may be implicitly determined based on the first preset condition. Specifically, the first preset condition may include: a BLER is greater than a specified rate.”).
Regarding claims 13 and 27, the UE of claim 10 and the network node of claim 24, respectively, wherein the one or more processors are further configured to: transmit feedback information based at least in part on the demodulation reference signal with the reference signal received power less than the configured threshold ([Sun, 0110] “when the signal quality monitoring result indicates that link quality is continuously lower than a particular specified threshold, the physical layer of the terminal device reports an out-of-synchronization (OOS) indication to the RRC layer”).
Claims 12 and 26 are rejected under 35 U.S.C. 103 as being unpatentable over Bagheri et al. (US 2017/0303302, “Bagheri”) in view of Li et al. (US 2018/0184444, “Li”) and Sun et al. (US 2022/0116876, “Sun”), and further in view of Kim et al. (US 2024/0251471, “Kim”).
Examiner's note: In what follows, references are drawn to Bagheri unless otherwise mentioned.
Regarding claims 12 and 26, the UE of claim 10 and the network node of claim 24, respectively, wherein the one or more processors are further configured to:
receive information identifying the configured threshold via at least one of: a radio resource control message ([Kim, 0302] “the preset condition may be a condition by which a RLC entity corresponding to a cell is deactivated when channel measurement information or a signal strength (e.g., Signal-to-Noise Ratio (SNR), Signal-to-Interference-Plus-Noise Ratio (SINR), Reference Signal Received Power (RSRP), Reference Signal Received Quality (RSRQ), etc.) of the cell is smaller than a threshold value configured in the RRC messag”), a medium access control (MAC) control element (CE), or downlink control information (These alternatives are not examined.).
Therefore, it is obvious to a PHOSITA, before the effective filing date of the claimed invention, to modify Bagheri in view of Li by using Kim’s RRC message to convey the threshold information in order to effectively control activation of RLC layers such that the “a system that supports a high reliability and low latency service.” [Kim, 0006].
Claims 14 and 28 are rejected under 35 U.S.C. 103 as being unpatentable over Bagheri et al. (US 2017/0303302, “Bagheri”) in view of Li et al. (US 2018/0184444, “Li”) and Sun et al. (US 2022/0116876, “Sun”), and further in view of Lin et al. (US 2021/0160879, “Lin”).
Examiner's note: In what follows, references are drawn to Bagheri unless otherwise mentioned.
Regarding claims 14 and 28, the UE of claim 13 and the network node of claim 27, respectively, wherein the feedback information is hybrid automatic repeat request (HARQ) feedback information with a dedicated cyclic shift ([Lin, 0143] “in the case of using a shared PUCCH resource for the HARQ feedback, e.g., as described in alternatives (2) or (3) above, the gNB is still able (via implementation) to distinguish UEs based on appropriate configuration of some parameters, e.g., usage of UE-specific parameters such as one or more of cyclic shift”).
The rational and motivation for adding this teaching of Lin are the same as for claim 4.
Conclusion
Any inquiry concerning this communication or earlier communications from the examiner should be directed to Harry H. Kim whose telephone number and email address are as follows; 571-272-5009, harry.kim2@uspto.gov.
Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice.
If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Derrick Ferris can be reached at 571-272-3123.
Information regarding the status of an application may be obtained from www.uspto.gov. For questions or assistance, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative or access to the automated information system, call 800-786-9199 (in USA or Canada) or 571-272-1000.
/HARRY H KIM/ Primary Examiner, Art Unit 2411