Prosecution Insights
Last updated: October 02, 2026
Application No. 18/867,852

MANAGEMENT APPARATUS AND METHOD OF MANAGING FACILITY DEVICE

Non-Final OA §102
Filed
Nov 21, 2024
Priority
Jun 16, 2022 — nonprovisional of PCTJP2022024181
Examiner
KENDALL, CHUCK O
Art Unit
2192
Tech Center
2100 — Computer Architecture & Software
Assignee
Mitsubishi Electric Corporation
OA Round
1 (Non-Final)
87%
Grant Probability
Favorable
1-2
OA Rounds
1y 1m
Est. Remaining
95%
With Interview

Examiner Intelligence

Grants 87% — above average
87%
Career Allowance Rate
810 granted / 933 resolved
+31.8% vs TC avg
Moderate +8% lift
Without
With
+8.0%
Interview Lift
resolved cases with interview
Typical timeline
2y 11m
Avg Prosecution
26 currently pending
Career history
955
Total Applications
across all art units

Statute-Specific Performance

§101
12.9%
-27.1% vs TC avg
§103
22.2%
-17.8% vs TC avg
§102
50.6%
+10.6% vs TC avg
§112
1.4%
-38.6% vs TC avg
Black line = Tech Center average estimate • Based on career data from 933 resolved cases

Office Action

§102
Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . This is in response to Application filed 11/21/24. Claims 1 – 14 have been examined and are pending. Claim Rejections - 35 USC § 102 The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(1) the claimed invention was patented, described in a printed publication, or in public use, on sale, or otherwise available to the public before the effective filing date of the claimed invention. Claim(s)1 – 14 is/are rejected under 35 U.S.C. 102(a)(1) as being anticipated by Francis Jorg US 12688030 B2. Regarding claims 1 and 14, Francis anticipates a management apparatus that manages one or more facility devices constituting a facility device group, the management apparatus comprising: a storage device to store a version of a control program stored in each of the one or more facility devices (4:35 – 40, see software repository) communication interface to communicate with a server storing a control program of the facility device (2:55 – 60 see backend server); and a controller to, in response to arrival of a predetermined timing, for each of the one or more facility devices, determine whether or not it is necessary to update the control program, by comparing the version of the control program stored in the storage device with a version specified by version information of the control program stored in the server, wherein the controller is configured to download the control program for a facility device for which it has been determined that it is necessary to update the control program (6:47 – 57, see comparing current version with and installed version in repository). Regarding claim 2, the management apparatus according to claim 1, wherein the controller is configured to determine whether or not it is necessary to update the control program by comparing, for each model of the facility device, the version of the control program stored in the storage device with the version specified by the version information of the control program stored in the server (6:47 – 57 see comparing current version). Regarding Claim 3, the management apparatus according to claim 1 or 2, wherein the controller is configured to determine whether or not it is necessary to update the control program by determining, for each model of the facility device, whether or not function improvement information of the control program stored in the server is suitable for a program update setting that is set in advance (11:20 – 35). Regarding claim 4, the management apparatus according to any one of claims 1 to 3, wherein, for a facility device for which it has been determined that it is necessary to update the control program, the controller is configured to notify about necessity of an update by at least one of a display on a display device and a notice given to a user of the facility device (10:30 – 40, see updated management system). Regarding claim 5, the management apparatus according to claim 4, wherein, for a facility device for which it has been determined that it is necessary to update the control program, the controller is further configured to notify about a candidate for update time of the control program (6:45 – 55). Regarding Claim 6, the management apparatus according to claim 5, wherein, for each facility device for which it has been determined that it is necessary to update the control program, the controller is configured to calculate the candidate based on an operation schedule of each facility device (12:30 – 40, see configuration and imported at certain point of time regarding calculate based on operation schedule). Regarding Claim 7, the management apparatus according to any one of claims 1 to 6, wherein, for each facility device for which it has been determined that it is necessary to update the control program, the controller is configured to determine whether or not to update the control program based on an operation state of each facility device(6:60 – 7:15). Regarding Claim 8, the management apparatus according to any one of claims 1 to 7, wherein the storage device is configured to store a management program for controlling the management apparatus, and the controller is configured to: in response to arrival of the predetermined timing, determine whether or not it is necessary to update the management program in the management apparatus, by comparing a version of the management program stored in the storage device with aversion specified by version information of a management program stored in the server, and when it is determined that it is necessary to update the management program in the management apparatus, download the management program of the management apparatus from the server (6:47 – 57, see comparing current version with and installed version in repository). Regarding claim 9, the management apparatus according to claim 8, wherein the controller is configured to calculate a candidate for update time of the management program based on an operation schedule of each of the one or more facility devices (12:30 – 40, see configuration and imported at certain point of time regarding calculate based on operation schedule). Regarding Claim 10, the management apparatus according to claim 8 or 9, wherein the controller is configured to determine whether or not to update the management program based on an operation state of each of the one or more facility devices (10:30 – 40, see updated management system). Regarding Claim 11, the management apparatus according to any one of claims 1 to 10, wherein, for a facility device for which it has been determined that it is necessary to update the control program, the controller is configured to download a control program from an information processing apparatus other than the server (2:50 – 67). Regarding Claim 12, the management apparatus according to claim 5, 6, or 9, wherein the candidate represents update start time or a time zone that is able to be designated as the update start time (12:30 – 40). Regarding Claim 13, the management apparatus according to any one of claims 1 to 12, wherein the controller is configured to determine whether or not it is necessary to update the control program, by further comparing a type of a function having frequent abnormalities in the one or more facility devices with a type of a function for which a defect has been corrected in the control program stored in the server (6:47 – 57). Conclusion The prior art made of record and not relied upon is considered pertinent to applicant's disclosure. Ishikawa US 20240103839 A1 also discloses downloading in a vehicle and up versioning software utilizing downloading and updates in a similar configuration. Correspondence Information Any inquiry concerning this communication or earlier communications from the examiner should be directed to Chuck Kendall whose telephone number is 571-272-3698. The examiner can normally be reached on 10:00 am - 6:30pm. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Hyung Sough can be reached on 571-272-6799. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of an application may be obtained from the Patent Application Information Retrieval (PAIR) system. Status information for published applications may be obtained from either Private PAIR or Public PAIR. Status information for unpublished applications is available through Private PAIR only [0060 – 0080]. For more information about the PAIR system, see http://pair-direct.uspto.gov. Should you have questions on access to the Private PAIR system, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). /CHUCK O KENDALL/ Primary Examiner, Art Unit 2192
Read full office action

Prosecution Timeline

Nov 21, 2024
Application Filed
Sep 22, 2026
Non-Final Rejection mailed — §102 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12748850
Application Aware Software Asset Inventory
4y 9m to grant Granted Sep 29, 2026
Patent 12730623
EXECUTION OF MEASURE COMMAND FOR FIRMWARE UPDATE AND FIRMWARE UPDATE
2y 9m to grant Granted Sep 08, 2026
Patent 12724607
AUTOMATED CODE DOCUMENTATION
2y 7m to grant Granted Sep 01, 2026
Patent 12724598
PREDICTION OF ENVIRONMENTAL BEHAVIOR AND AUTOMATIC ADJUSTMENT OF NETWORK POLICY GENERATION FOR EDGE INFRASTRUCTURE
2y 11m to grant Granted Sep 01, 2026
Patent 12705040
UPGRADING AN EXISTING STANDARD ELECTRIC VEHICLE (EV) CHARGER FROM GRID TO VEHICLE (V1G) TO V1G PLUS VEHICLE TO GRID (V2G) OPERATION
3y 7m to grant Granted Aug 11, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
87%
Grant Probability
95%
With Interview (+8.0%)
2y 11m (~1y 1m remaining)
Median Time to Grant
Low
PTA Risk
Based on 933 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month