Prosecution Insights
Last updated: October 02, 2026
Application No. 18/867,865

RESOURCE DETERMINING METHOD AND APPARATUS, MULTI-CARRIER SCHEDULING METHOD AND APPARATUS, AND STORAGE MEDIUM

Non-Final OA §102
Filed
Nov 21, 2024
Priority
May 27, 2022 — nonprovisional of PCTCN2022095751
Examiner
HAN, CLEMENCE S
Art Unit
2469
Tech Center
2400 — Computer Networks
Assignee
Beijing Xiaomi Mobile Software Co., Ltd.
OA Round
1 (Non-Final)
91%
Grant Probability
Favorable
1-2
OA Rounds
6m
Est. Remaining
96%
With Interview

Examiner Intelligence

Grants 91% — above average
91%
Career Allowance Rate
1032 granted / 1136 resolved
+32.8% vs TC avg
Moderate +5% lift
Without
With
+5.2%
Interview Lift
resolved cases with interview
Typical timeline
2y 4m
Avg Prosecution
31 currently pending
Career history
1158
Total Applications
across all art units

Statute-Specific Performance

§101
6.0%
-34.0% vs TC avg
§103
34.6%
-5.4% vs TC avg
§102
28.0%
-12.0% vs TC avg
§112
20.2%
-19.8% vs TC avg
Black line = Tech Center average estimate • Based on career data from 1136 resolved cases

Office Action

§102
DETAILED ACTION Notice of Pre-AIA or AIA Status The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA . Claim Rejections - 35 USC § 102 In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status. The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action: A person shall be entitled to a patent unless – (a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention. Claims 1-3, 8, 11, 18, 19, 24, 25, 28 and 37-40 are rejected under 35 U.S.C. 102(a)(2) as being anticipated by Oh et al. (US Pub. 2023/0247648). Regarding claims 1, 37 and 39, Oh teaches a resource determining method, performed by a terminal, the method comprising: receiving downlink control information (DCI) sent by a base station, wherein the DCI is configured to schedule data transmission for a plurality of cells (“PDSCHs are scheduled for one or more cells with one DCI” in [0388]); determining at least frequency domain resources corresponding to a reference cell in the plurality of cells based on a frequency domain resource allocation (FDRA) field in the DCI (“identify at least one cell in which the DCI 1432 schedules a PDSCH via at least one of a CIF and/or a GIF, or a frequency domain resource allocation field in the DCI 1432” in [0393]); and determining frequency domain resources corresponding to one or more other cells in the plurality of cells at least based on the frequency domain resources corresponding to the reference cell (“the UE may determine all of frequency resource regions of the PDSCH 1440 and the PDSCH 1480 via the frequency domain resource allocation field in the DCI 1432” in [0394]). Regarding claim 2, Oh teaches the FDRA field is configured to indicate a first resource indication value (RIV) of the reference cell (“a resource indicator value (RIV) indicated via the frequency domain resource allocation field” in [0394]). Regarding claims 3 and 19, Oh teaches determining the at least frequency domain resources corresponding to the reference cell in the plurality of cells based on the FDRA field in the DCI comprises: determining a first start resource block (RB) index value and a first continuous RB number for data transmission for the reference cell based on the first RIV (“a start RB (RBstart) of a PDSCH frequency resource and length or the number (LRBs) of consecutively allocated RBs which are determined via the RIV” in [0394]); wherein determining the frequency domain resources corresponding to the one or more other cells in the plurality of cells at least based on the frequency domain resources corresponding to the reference cell comprises: determining a second start RB index value for data transmission for a first cell based on the first start RB index value, wherein the first cell is any one of the one or more other cells; and determining a second continuous RB number for the data transmission for the first cell based on the second start RB index value and the first continuous RB number (“the UE may determine all of frequency resource regions of the PDSCH 1440 and the PDSCH 1480 via the frequency domain resource allocation field in the DCI 1432” and “a resource indicator value (RIV) indicated via the frequency domain resource allocation field may be equally applied to the PDSCH 1440 and the PDSCH 1480” in [0394]). Regarding claim 8, Oh teaches the FDRA field is configured to indicate: a first resource indication value (RIV) of the reference cell (“a resource indicator value (RIV) indicated via the frequency domain resource allocation field” in [0394]); and a continuous resource block (RB) number for data transmission for each of the one or more other cells (“a start RB (RBstart) of a PDSCH frequency resource and length or the number (LRBs) of consecutively allocated RBs which are determined via the RIV” in [0394]). Regarding claim 11, Oh teaches the FDRA field is configured to indicate: a first resource indication value (RIV) of the reference cell (“a resource indicator value (RIV) indicated via the frequency domain resource allocation field” in [0394]); and a start resource block (RB) index value for data transmission for each of the one or more other cells (“a start RB (RBstart) of a PDSCH frequency resource and length or the number (LRBs) of consecutively allocated RBs which are determined via the RIV” in [0394]). Regarding claims 18, 38 and 40, Oh teaches a multi-carrier scheduling method, performed by a base station, the method comprising: determining frequency domain resources for data transmission of a terminal in each of a plurality of cells (“the UE may determine all of frequency resource regions of the PDSCH 1440 and the PDSCH 1480 via the frequency domain resource allocation field in the DCI 1432” in [0394]); determining a bit value indicated by a bit comprised in a frequency domain resource allocation (FDRA) field in downlink control information (DCI) at least based on frequency domain resources corresponding to a reference cell in the plurality of cells (“identify at least one cell in which the DCI 1432 schedules a PDSCH via at least one of a CIF and/or a GIF, or a frequency domain resource allocation field in the DCI 1432” in [0393]); and sending the DCI to the terminal (“PDSCHs are scheduled for one or more cells with one DCI” in [0388]). Regarding claim 24, Oh teaches the FDRA field is configured to indicate: a first resource indication value (RIV) of the reference cell (“a resource indicator value (RIV) indicated via the frequency domain resource allocation field” in [0394]); wherein determining the bit value indicated by the bit comprised in the FDRA field in the DCI at least based on the frequency domain resources corresponding to the reference cell in the plurality of cells comprises: determining the bit value indicated by the bit comprised in the FDRA field based on the first RIV, wherein the first RIV is associated with the first start RB index value and the first continuous RB number for the reference cell (“a start RB (RBstart) of a PDSCH frequency resource and length or the number (LRBs) of consecutively allocated RBs which are determined via the RIV” in [0394]). Regarding claim 25, Oh teaches determining the frequency domain resources for the data transmission of the terminal in each of the plurality of cells comprises: determining a first start resource block (RB) index value and a first continuous RB number for data transmission of the terminal in the reference cell (“a start RB (RBstart) of a PDSCH frequency resource and length or the number (LRBs) of consecutively allocated RBs which are determined via the RIV” in [0394]); determining a second start RB index value for data transmission of the terminal in a first cell based on the first start RB index value, wherein the first cell is any one of one or more other cells in the plurality of cells; and determining a second continuous RB number for the data transmission of the terminal in the first cell (“the UE may determine all of frequency resource regions of the PDSCH 1440 and the PDSCH 1480 via the frequency domain resource allocation field in the DCI 1432” and “a resource indicator value (RIV) indicated via the frequency domain resource allocation field may be equally applied to the PDSCH 1440 and the PDSCH 1480” in [0394]). Regarding claim 28, Oh teaches determining the frequency domain resources for the data transmission of the terminal in each of the plurality of cells comprises: determining a first start resource block (RB) index value and a first continuous RB number for data transmission of the terminal in the reference cell (“a start RB (RBstart) of a PDSCH frequency resource and length or the number (LRBs) of consecutively allocated RBs which are determined via the RIV” in [0394]); determining a second continuous RB number for data transmission of the terminal in a first cell based on the first continuous RB number, wherein the first cell is any one of one or more other cells in the plurality of cells; and determining a second start RB index value for the data transmission of the terminal in the first cell (“the UE may determine all of frequency resource regions of the PDSCH 1440 and the PDSCH 1480 via the frequency domain resource allocation field in the DCI 1432” and “a resource indicator value (RIV) indicated via the frequency domain resource allocation field may be equally applied to the PDSCH 1440 and the PDSCH 1480” in [0394]). Allowable Subject Matter Claims 4, 6, 9, 12, 20 and 22 are objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims. Conclusion Any inquiry concerning this communication or earlier communications from the examiner should be directed to CLEMENCE S HAN whose telephone number is (571)272-3158. The examiner can normally be reached Monday-Friday 8AM-5PM EST. Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice. If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Edan Orgad can be reached at (571)272-7884. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300. Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000. /CLEMENCE S HAN/Primary Examiner, Art Unit 2414
Read full office action

Prosecution Timeline

Nov 21, 2024
Application Filed
Sep 11, 2026
Non-Final Rejection mailed — §102 (current)

Precedent Cases

Applications granted by this same examiner with similar technology

Patent 12750188
SHARED DEMODULATION REFERENCE SIGNAL FOR PHYSICAL DOWNLINK CONTROL CHANNEL AND PHYSICAL DOWNLINK SHARED CHANNEL TRANSMISSIONS
3y 2m to grant Granted Sep 29, 2026
Patent 12750713
RESOURCE MEASUREMENT RESTRICTION FOR BEAM MANAGEMENT
2y 9m to grant Granted Sep 29, 2026
Patent 12739846
CONTROL CHANNEL HANDLING FOR ENHANCED CROSS-CARRIER SCHEDULING
3y 7m to grant Granted Sep 15, 2026
Patent 12733032
SYSTEM AND METHOD FOR PERFORMING TRANSMISSION CANCELLATION INDICATION MONITORING
2y 5m to grant Granted Sep 08, 2026
Patent 12726927
TERMINAL, RADIO COMMUNICATION SYSTEM, AND RADIO COMMUNICATION METHOD
2y 7m to grant Granted Sep 01, 2026
Study what changed to get past this examiner. Based on 5 most recent grants.

Strategy Recommendation AI-generated — please review before filing

Get a prosecution strategy drawn from examiner precedents, rejection analysis, and claim mapping.
Typically takes 5-10 seconds — AI-generated, attorney review required before filing

Prosecution Projections

1-2
Expected OA Rounds
91%
Grant Probability
96%
With Interview (+5.2%)
2y 4m (~6m remaining)
Median Time to Grant
Low
PTA Risk
Based on 1136 resolved cases by this examiner. Grant probability derived from career allowance rate.

Sign in with your work email

Enter your email to receive a magic link. No password needed.

Personal email addresses (Gmail, Yahoo, etc.) are not accepted.

Free tier: 3 strategy analyses per month