DETAILED ACTION
Notice of Pre-AIA or AIA Status
The present application, filed on or after March 16, 2013, is being examined under the first inventor to file provisions of the AIA .
Claim Rejections - 35 USC § 102
In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status.
The following is a quotation of the appropriate paragraphs of 35 U.S.C. 102 that form the basis for the rejections under this section made in this Office action:
A person shall be entitled to a patent unless –
(a)(2) the claimed invention was described in a patent issued under section 151, or in an application for patent published or deemed published under section 122(b), in which the patent or application, as the case may be, names another inventor and was effectively filed before the effective filing date of the claimed invention.
Claim(s) 1-7, 9, 10, 16-25 is/are rejected under 35 U.S.C. 102(a)(2) as being anticipated by Wang et al. “Wang” US 2024/0397357.
Regarding claims 1, 24, 25, Wang teaches a method, processor and user equipment (UE) (Figure 8), comprising:
at least one memory; and at least one processor coupled with the at least one memory (processor 800 coupled to memory 810) Figure 8) and configured to cause the UE to:
receive a first radio resource control (RRC) reconfiguration message for path addition from a network, wherein the first RRC reconfiguration message for path addition includes an identifier (ID) of a relay UE (UE receives a RRCReconfiguration message which includes relay UE ID information; 704 of Figure 7 and paragraph 201);
start a timer for a path addition procedure upon reception of the first RRC reconfiguration message (a new timer is configured (i.e. started); Paragraph 201); and
receive a first message associated with a link between the relay UE and the network (step 708 and paragraph 211 shows the UE receiving a PC5 unicast link release message (i.e. first message)).
Regarding claim 2, Wang teaches the first message is a PC5 unicast link release message (step 708 and paragraph 211 shows the UE receiving a PC5 unicast link release message (i.e. first message)).
Regarding claim 3, Wang teaches the notification message indicates a handover of the relay (step 606 of Figure 6 shows the message received includes a handover command. The Examiner notes, this claim is written in the alternative. In claim 2, the first message is being viewed as the PC5, thus claim 3 does not fall within the scope of what is being examined based on the alternative being rejected in claim 2).
Regarding claim 4, Wang teaches the UE stops the timer upon reception of the first message (the stop condition of the timer is associated with the completion of the PC5 link and messages sent; Paragraphs 201-206).
Regarding claim 5, Wang teaches determine if a cell change or BS change of the relay occurs (step 606 of Figure 6 and paragraph 185 teaches the RRCReconfiguration sent to the UE includes the relay ID and the handover command information. Thus the UE is receiving (and thus can determine) if there is a cell change),
Release a PC5 link between the relay and the UE based on a cell change occurring (Paragraphs 210-211 show a PC5 can be released after receiving the RRC reconfiguration message), or
Continue to establish the PC5 link in response to determine a cell change does not occur (Step 607 of Fig. 6 shows PC5 link establishment).
Regarding claim 6, Wang teaches causing the UE to transmit an indication a PC5 link between the relay UE and UE has bene released or not to the network (in step 707, the network sends a message to release the PC5 configurations for relaying information; Paragraph 210. Further, in step 708, the remote UE initiates the PC5 release and then sends ul/dl data to the network via a different relay; Paragraph 211. This would indicate to the network that the PC5 has been released since the data is coming from a different relay UE).
Regarding claim 9, Wang teaches transmitting information regarding intra-cell path addition or intra-base station path addition to the relay UE (in step 708 of Figure 7 the remote UE sends to the relay UE a PC5 link release message which is for intra-gNB switching; Paragraphs 212-213. Thus the information transmit is regarding intra-cell path addition).
Regarding claim 10, Wang teaches receive a PC5 link release message due to occurrence of a cell change (in step 708 of Figure 7 the remote UE and/or relay UE sends to the relay UE a PC5 link release message which is for intra-gNB switching; Paragraphs 212-213. Thus the information transmit is regarding intra-cell path addition).
Regarding claim 16, Wang teaches a relay UE comprising:
A processor and memory configured to:
Transmit, to a remote UE, a first message associated with a link between the relay UE and a network (708 and paragraph 211 shows a remote UE receiving a PC5 link message from a relay UE. The PC5 link establishment 705 can also be viewed as a first message), wherein the first message is one of:
A notification message, PC5 unicast link release message or rejection message (the PC5 message is a link release message; 708 and Paragraph 211. The PC5 link establishment message (705 and paragraph 208) can be viewed as the notification message).
Regarding claim 17, Wang teaches the relay UE is a target relay UE during a
path addition procedure (Target relay UE2; Paragraph 208).
Regarding claim 18, Wang teaches the notification message indicates a handover of the target relay (step 607 of Figure 6 shows the message received includes a handover command. The Examiner notes, this claim is written in the alternative. In claim 16, the first message is being viewed as the PC5, thus claim 18 does not fall within the scope of what is being examined based on the alternative being rejected in claim 16).
Regarding claim 19, Wang teaches receiving information regarding intra-cell path addition or intra-base station path addition to the relay UE (in step 708 of Figure 7 the remote UE sends to the relay UE a PC5 link release message which is for intra-gNB switching; Paragraphs 212-213. Thus the information transmit is regarding intra-cell path addition).
Regarding claim 20, Wang teaches not changing from a first cell to a second in response to the relay UE being in an RRC idle or inactive state (Paragraphs 213 teaches that if the target relay is not in RRC connected (thus RRC idle/inactive) another relay may be chosen. Thus no change would occur as claimed).
Regarding claim 21, this claim limits an option not selected in claim 20, thus carries no patentable weight. Wang teaches sending PC5 unicast link release message as discussed with respect to claim 16.
Regarding claim 22, Wang teaches the relay UE is a source relay UE during a path switch procedure from a first to a second indirect path, wherein the first indirect path is between the remote UE and the network via the source relay UE and the second indirect path is between the remote UE and the network via a second target relay UE (Relay UE 1 is the source, Relay UE 2 is the target relay (see Figure 7). The first path the remote UE communicates with the gNB through the relay UE1 (see Figure 7, the first UL/DL data communication goes from remote UE, to relay 1, to gNB). The second path is from Remote UE to relay UE2 to the gNB as shown in Figure 7 the last UL/DL data transmission).
Regarding claim 23, Wang teaches the notification message indicates a handover of the source relay (step 607 of Figure 6 shows the message received includes a handover command. The Examiner notes, this claim is written in the alternative. In claim 16, the first message is being viewed as the PC5, thus claim 23 does not fall within the scope of what is being examined based on the alternative being rejected in claim 16).
Claim Rejections - 35 USC § 103
In the event the determination of the status of the application as subject to AIA 35 U.S.C. 102 and 103 (or as subject to pre-AIA 35 U.S.C. 102 and 103) is incorrect, any correction of the statutory basis (i.e., changing from AIA to pre-AIA ) for the rejection will not be considered a new ground of rejection if the prior art relied upon, and the rationale supporting the rejection, would be the same under either status.
The following is a quotation of 35 U.S.C. 103 which forms the basis for all obviousness rejections set forth in this Office action:
A patent for a claimed invention may not be obtained, notwithstanding that the claimed invention is not identically disclosed as set forth in section 102, if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. Patentability shall not be negated by the manner in which the invention was made.
Claim(s) 7 is/are rejected under 35 U.S.C. 103 as being unpatentable over Wang in view of Orsino US 2023/0239949.
Regarding claim 7, while Wang teaches PC5 RLF (Paragraphs 150 and 153) as well as PC5 unicast link establishment procedures (Paragraph 201) which includes remote UE initiating the PC5 unicast link release after receiving the RRC reconfiguration message; Paragraph 211, Wang does not disclose initiating/transmitting to the network a failure message with a cause, wherein the cause is reception of a uu failure or PC5 (the UE triggers a failure procedure and sends an indication to the gNB (i.e. network) which is with respect to a uu failure between the relay UE and network and/or the PC5 release; Paragraph 77.
Thus it would have been obvious to one of ordinary skill in the art at the time of the effective filing to modify the teachings of Wang to include transmitting a failure indication to the network as taught by Orsino.
One would be motivated to make the modification such that the gNB can be informed of a failure in the network as well as a reason as taught by Orsino; Paragraph 77.
Allowable Subject Matter
Claim 8 is objected to as being dependent upon a rejected base claim, but would be allowable if rewritten in independent form including all of the limitations of the base claim and any intervening claims.
Conclusion
Any inquiry concerning this communication or earlier communications from the examiner should be directed to BRANDON M RENNER whose telephone number is (571)270-3621. The examiner can normally be reached Monday-Friday 7am-5pm EST.
Examiner interviews are available via telephone, in-person, and video conferencing using a USPTO supplied web-based collaboration tool. To schedule an interview, applicant is encouraged to use the USPTO Automated Interview Request (AIR) at http://www.uspto.gov/interviewpractice.
If attempts to reach the examiner by telephone are unsuccessful, the examiner’s supervisor, Derrick Ferris can be reached at (571)-272-3123. The fax phone number for the organization where this application or proceeding is assigned is 571-273-8300.
Information regarding the status of published or unpublished applications may be obtained from Patent Center. Unpublished application information in Patent Center is available to registered users. To file and manage patent submissions in Patent Center, visit: https://patentcenter.uspto.gov. Visit https://www.uspto.gov/patents/apply/patent-center for more information about Patent Center and https://www.uspto.gov/patents/docx for information about filing in DOCX format. For additional questions, contact the Electronic Business Center (EBC) at 866-217-9197 (toll-free). If you would like assistance from a USPTO Customer Service Representative, call 800-786-9199 (IN USA OR CANADA) or 571-272-1000.
/BRANDON M RENNER/ Primary Examiner, Art Unit 2411